Publication:
Purchase Price Review in the Infrastructure Industry

Loading...
Thumbnail Image
Files in English
English PDF (287.51 KB)
299 downloads
English Text (43.84 KB)
286 downloads
Published
2007-11
ISSN
Date
2014-08-21
Editor(s)
Abstract
The Pakistan Infrastructure Implementation Capacity Assessment (PIICA) analysis of the cost of materials, construction inputs, and technical services across the region can help in better understanding of the various dimensions of the infrastructure construction industry. Such a study can also help in analyzing common perceptions regarding the existing disparity in cost of doing business, reasons for migration of technical, skilled, and unskilled personnel to regional countries: quality of construction; and other similar issues. The purpose of this analysis is to assess the relative differences in: (i) professional salary structures; (ii) cost of construction inputs across regional countries; and (iii) contractors working (unit) rates. The effectively decreasing charge rates and salary levels over the past decade accentuates the growing trend among professionals towards seeking more lucrative jobs in the overseas market. Pakistan not only has the highest cost of inputs in the region but when compared to the United Arab Emirates (UAE) which has the lowest input costs in the region, material input costs are 400 percent higher in Pakistan. When adverse effects of other variables like old, inefficient equipment, systematic weaknesses and inefficiencies, corruption, and transparency issues are also considered, the rates despite seeming to be "competitive" may well, in fact, be unworkable.
Link to Data Set
Citation
Mir, Aized H.; Abidi, Sohail; Durrani, Amer Z.. 2007. Purchase Price Review in the Infrastructure Industry. © http://hdl.handle.net/10986/19547 License: CC BY 3.0 IGO.
Digital Object Identifier
Associated URLs
Associated content
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections

Related items

Showing items related by metadata.

  • Publication
    Local Case Studies
    (World Bank, Washington, DC, 2007-11) Abidi, Sohail; Mir, Aized H.; Durrani, Amer Z.
    The local case studies for projects in different sectors were prepared to document the bottlenecks which occurred during the various processes involved in the life cycle of infrastructure projects. Identifying such processes allows a better understanding of the capacity constraints in planning, designing, programming, procurement, contract administration, financing and budgeting, execution, and other stages in a project cycle. The case studies clearly demonstrate the presence of deep rooted systematic problems related to: (1) inadequate client capacity to plan, procure, program, administer, and manage projects; (2) imbalanced conditions of contracts; (3) flawed procurement procedures (pre-qualification, bid evaluation, negotiations, and re-negotiations with the lowest bidder) causing significant delays; (4) mismatched project funding needs and actual availability of funds; (5) commencement of projects without ensuring that required funds are in place; (6) delay in making running payments; (7) insufficient time given for detailed design and variations in contract due to inadequacies in design; (8) limited capacity of local contractors; and (9) poor international bid response in mega projects related to credibility issues.
  • Publication
    International Case Studies - The UAE, China, and Malaysia
    (World Bank, Washington, DC, 2007-11) Sen, Supriya; Mir, Aized H.; Durrani, Amer Z.
    The United Arab Emirates (UAE) was selected as a case study because it is one of the countries in the region that has had rapid success in scaling up infrastructure in a relatively short period of time. Also, the Government of Pakistan (GoP) is seeking to attract participation of investors from the UAE into domestic infrastructure projects. The study also briefly considers the potential impact of the infrastructure development boom in the UAE on the Pakistan infrastructure implementation capacity in terms of competition for skilled resources in relation to consulting firms and construction services. The study points out that while government agencies and private sector in the UAE have been very successful in implementing various large projects in the past, however, capacity constraints are becoming evident in construction and infrastructure implementation due to the mega size and scale of projects envisaged for completion over the coming years. Therefore, as in the case of other regions with expanding demand but constrained capacity, the way forward is likely to be an increasing focus on private sector participation as well as on newer models and formats in which the projects will be implemented. The experiences of Malaysia, China, and the UAE helped in understanding the processes involved in developing the capacity to undertake large scale infrastructure projects. Common lessons are: that a strategic long-term vision and integrated master plan; ensured funding; sustained efforts to build up required human capital; and providing an enabling environment for local as well as international consultants, contractors, and investors to work in the country proved successful. Strong government support in terms of Human Resource (HR) development; streamlining procedures, policies and regulations; supporting trade associations; facilitating timely payments; and enacting reforms through appropriate legislation in financial sectors to encourage lending for infrastructure are essential. Policies have to be kept under constant review to face the new challenges for infrastructure development due to the ongoing massive development in the region.
  • Publication
    Response to International and Local Bids
    (World Bank, Washington, DC, 2007-11) Mir, Aized H.; Abidi, Sohail; Durrani, Amer Z.
    Several stakeholders in the Pakistan construction industry have expressed concern about the apparent poor response to recent international and local bids. The objectives of the study were to evaluate the level of response to recent international and local tenders and to assess the level of interest of international firms to bid on projects in Pakistan. The response to recent invitations to bid on projects across Pakistan has been poor from both international and local firms. Although, tendering was open to both international and local contractors, most firms that submitted bids have been local. Generally, the same set of four or so contractors repeatedly bid for projects across the country, and the lowest bidder always won the contract. There was apparently minimum weight-age given to an evaluation of the technical capability of the lowest bidder. The lack of response in bids and the high prices being quoted can be considered as indicators of supply and demand gaps. There seem to be abundant opportunities for work, and limitations in the contractor ' s capacity to do work are being tested by the current market situation, where there is ample work and the contractors are in a position to choose the works which interest them. In such circumstances, the short-term implications are clear-contractors will demand high premiums for less attractive work and response to bids for work in difficult remote areas with higher risks shall remain especially poor. In a market driven economy, it will take some time until the supply demand situation achieves stability, while for the short term, the clients will be faced with accepting higher bid rates in order to deliver upon their development goals and also accept the risk that the limited pool of contractors may not be able to deliver.
  • Publication
    Demand-Supply Gap Analysis
    (World Bank, Washington, DC, 2007-11) Mir, Aized H.; Abidi, Sohail; Durrani, Amer Z.
    An essential part of the Pakistan Infrastructure Implementation Capacity Assessment (PIICA) was an assessment of available resources and the demand generated for these resources by the proposed infrastructure projects. A demand-supply gap analysis for Human Resources (HR), major construction materials and equipment keeping in view the Medium Term Development Framework (MTDF) for up to 2010 has been reviewed to better understand the constraints faced by the industry. Shortage of manpower emerged as a significant theme when studying the implementation capacity of large infrastructure projects in Pakistan. Stakeholders (clients, consultants and contractors) have been unanimous in identifying the lack of suitably qualified people in their organizations as an impediment both to successful implementation as well as the quality of the products and services they deliver. The Perception Survey conducted for the purpose of this study revealed that 67 percent of stakeholders believed that HR posed a significant constraint to the implementation of large infrastructure projects in Pakistan (Gallup Perception Survey,(2006). It is thus important to quantify the HR gap within the construction industry, both in absolute numbers and skills deficiencies and the gaps in materials and machinery, given the enlarged infrastructure construction program planned during the next few years under the MTDF. Have the planners and policy makers catered for these pre-requisites in the MTDF? This is the question that the study addresses'.
  • Publication
    Development of Construction Industry : A Literature Review
    (2007-11-01) Mir, Aized H.; Durrani, Amer Z.; Tanvir, Mehreen
    The construction industry in Pakistan is well aware of the challenges it faces and its issues, constraints, and recommendations are also well documented in reports published from time to time. This study shows that business environment (demand-side), Human Resources (HR), equipment and materials are key factors restraining growth therefore showing that there are no short-term fixes for these problems. A sustained long-term committed approach to developing the construction industry (contractors, consultants, and, clients) is of paramount importance. Considering the Government of Pakistan's (GoP) ambitious development plans for the coming years, innovative and out of the box solutions will be required to deliver the proposed infrastructure projects.

Users also downloaded

Showing related downloaded files

  • Publication
    Digital Africa
    (Washington, DC: World Bank, 2023-03-13) Begazo, Tania; Dutz, Mark Andrew; Blimpo, Moussa
    All African countries need better and more jobs for their growing populations. "Digital Africa: Technological Transformation for Jobs" shows that broader use of productivity-enhancing, digital technologies by enterprises and households is imperative to generate such jobs, including for lower-skilled people. At the same time, it can support not only countries’ short-term objective of postpandemic economic recovery but also their vision of economic transformation with more inclusive growth. These outcomes are not automatic, however. Mobile internet availability has increased throughout the continent in recent years, but Africa’s uptake gap is the highest in the world. Areas with at least 3G mobile internet service now cover 84 percent of Africa’s population, but only 22 percent uses such services. And the average African business lags in the use of smartphones and computers as well as more sophisticated digital technologies that catalyze further productivity gains. Two issues explain the usage gap: affordability of these new technologies and willingness to use them. For the 40 percent of Africans below the extreme poverty line, mobile data plans alone would cost one-third of their incomes—in addition to the price of access devices, apps, and electricity. Data plans for small- and medium-size businesses are also more expensive than in other regions. Moreover, shortcomings in the quality of internet services—and in the supply of attractive, skills-appropriate apps that promote entrepreneurship and raise earnings—dampen people’s willingness to use them. For those countries already using these technologies, the development payoffs are significant. New empirical studies for this report add to the rapidly growing evidence that mobile internet availability directly raises enterprise productivity, increases jobs, and reduces poverty throughout Africa. To realize these and other benefits more widely, Africa’s countries must implement complementary and mutually reinforcing policies to strengthen both consumers’ ability to pay and willingness to use digital technologies. These interventions must prioritize productive use to generate large numbers of inclusive jobs in a region poised to benefit from a massive, youthful workforce—one projected to become the world’s largest by the end of this century.
  • Publication
    Pakistan : Reforming Punjab's Public Finances and Institutions
    (Washington, DC, 2001-08-21) World Bank
    Similarly to Pakistan's other provinces, and the country as a whole, Punjab Province - a macrocosm of the country, with more than half the population, and economic activity - is facing a crisis of public service delivery, government finances, public institutions, and governance. Hence, the resulting social, and infrastructure "deficits", have contributed to slower economic growth, slower poverty reduction, and poor social indicators in the province. Nevertheless, Punjab has the opportunity to turn around its public sector, for the provincial government seems determined to improve service delivery. This report is intended to provide an input for this process, and, puts forward recommendations for fiscal restructuring, institutional improvements - including civil service reform - and, sectoral reforms to improve service delivery in education, health, agriculture and irrigation, and roads. Fiscal restructuring needs to focus the public sector on essential core roles, to include improved financial management; revamping planning, and budgeting; mobilizing revenue from taxes, and user charges; and, implementing fiscal decentralization. Institutional improvements, and civil reform would include accountability, and strengthening key provincial economic management, regulatory, and sectoral institutions, while reforms in individual sectors should improve service delivery , and development outcomes. The Federal Government should play an important role in supporting, and facilitating provincial reforms, by guiding the devolution process, stabilizing federal revenues, and, working closely with the provinces in the reform process.
  • Publication
    Dominican Republic Country Climate and Development Report
    (Washington, DC: World Bank, 2023-11-30) World Bank Group
    The Dominican Republic has made significant progress in boosting economic growth and reducing poverty, but it still faces challenges to achieve inclusive and equitable development, increase productivity, and improve the competitiveness and sustainability of primary sectors like agriculture, water, tourism, and energy. The National Development Strategy (NDS) and the National Multi‑Year Public Sector Plan (NPSP) aim to address development and climate challenges and promote a green, inclusive and resilient future. The DR is highly vulnerable to climate change, which is likely to compound existing development challenges. By 2050, climate change impacts are expected to decrease labor productivity and affect health, crop yields, tourism, infrastructure capital, and natural ecosystems such as forests and coastal areas. Climate change also poses risks to the financial system such as the banking sector's heightened credit exposure to tropical cyclones and droughts. Although the DR has a small carbon footprint, the country's GHG emissions have been rising, mainly in the energy, waste, and agricultural sectors. Fostering a low‑carbon growth path can support the country's climate change goals while bringing important development co‑benefits. The Dominican Republic CCDR employs a version of the MANAGE model. This CCDR further extends the model to incorporate the path of emissions from key sectors (transport, energy, AFOLU), and to incorporate DR‑specific climate damage functions to introduce the impact of climate change on the economy.
  • Publication
    Pilot Land Reforms in Nigeria : Think Big, Start Small, Move Fast! …but Where Do We Start?
    (World Bank, Washington, DC, 2011-03) Dione-Mbaye, Nouma; Masinde, Catherine
    When it comes to strategy, the Chinese have a saying: 'think big, start small, but move fast.' This has been our guiding philosophy for the pilot land reforms of the World Bank-Department of International Development (DFID) sub national Investment Climate Program (ICP) in Nigeria. The challenge was to find a 'small' reform entry point from which to 'move fast' on this sensitive and difficult topic, which is more complicated than it might appear. After some research, the ICP team found that the most effective and efficient entry point was the mapping and streamlining of land procedures. Over the last four years, the team worked on implementing this approach in four Nigerian states (Cross River, Kaduna, Kano, and Lagos). This Smart Lesson shares some of our experiences in finding practical solutions for the successful implementation of streamlining activities at the sub national level.
  • Publication
    The Road from Emergency Employment towards Integrated Rural Access : Re-orientation of the Afghanistan National Emergency Employment Program to the Rural Access Program
    (Washington, DC, 2006-11) World Bank
    This paper provides an institutional record of the implementation experiences of all the four World Bank-assisted National Emergency Employment Program (NEEP)/National Rural Access Program (NRAP) projects and evaluates the impact on community members of the improved rural access that the projects have provided. It is based on desk reviews of project documentation, supervision mission notes, field visits to communities in rural areas, and detailed discussions with project team members and staff involved in implementation based in Afghanistan. Chapter two describes the program's evolving objectives, structure, and implementation arrangements. Chapter three evaluates NEEP's record in providing a social safety net, and chapter four describes the arrangements for community participation in program decision making and the perceptions of community members about the program's benefits. Chapter five describes the Reintegration and Alternative Livelihoods Program (NEEP-RAL), which has a similar theme to those of the other NEEP projects, but different dynamics and implementation arrangements from them. Chapter six reviews key findings and lessons learned, and finally, chapter seven concludes.