Abstract
The Government of Zimbabwe (GOZ) faces difficult choices in managing the size of its civil service wage bill. The Government understands the need to watch the escalating wage bill carefully and put in place a strategy to steer it to a sustainable level as early as possible. Historical and international comparisons suggest that an overall wage bill of around 10 percent of GDP should be the medium-term target. This note illustrates that Zimbabwe could take immediate steps in 2010 and 2011 that will put it on the path of a sustainable level of wage bill in the medium-term. The focus of efforts to contain the wage bill should be on short-term measures because designing and implementing a medium-term approach to wage bill management would be too challenging in view of prevailing economic uncertainty and complex political reality. The note covers the staff employed by the Central Government, including uniformed services and staff employed by the Grant-in-Aided (GIA) institutions. The staff employed by local governments and public enterprises are excluded because direct transfers from the central budget to local government and public enterprises are rather small. (annex A has an outline of the institutional aspects of civil service in Zimbabwe). Given the paucity of information, the note does not make any recommendations specific to the GIA wage bill.
Link to Data Set
Citation
“World Bank. 2010. Zimbabwe Public Expenditure Notes : Financial and Regulatory Challenges in Infrastructure Parastatals and Sectors. © http://hdl.handle.net/10986/18532 License: CC BY 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Publication Niger's Infrastructure : A Continental Perspective(2011-06-01)Between 2000 and 2005 infrastructure made a net contribution of less than a third of a percentage point to the improved per capita growth performance of Niger, one of the lowest contributions in Sub-Saharan Africa. Raising the country's infrastructure endowment to that of the region s middle-income countries could boost annual growth in Niger by about 4.5 percentage points. Niger has made significant progress in some areas of its infrastructure, including water and telecommunications. But the country still faces a number of important infrastructure challenges, the most pressing of which is probably in the water and sanitation sector, as 82 percent of Nigeriens still practice open defecation, the highest in the continent. Niger also faces significant challenges in the power sector, as only 8 percent of the population is electrified. Niger currently spends about $225 million per year on infrastructure, leaving an annual funding gap of $460 million even after savings from curing inefficiencies are taken into account. Niger can close that gap by tapping alternative sources of financing or by adopting lower-cost technologies. There is plenty of room for private-sector participation in Niger's infrastructure sectors, and the adoption of lower-cost technologies could reduce the funding gap by almost half.Publication Zambia Growth, Infrastructure, and Investments : Role for Public Private Partnership(Washington, DC, 2008-06-26)The main purpose of this paper is to document and discuss infrastructure gaps, investment needs, and policy challenges in improving infrastructure services, with an emphasis on the role of Public Private Partnerships to access needed resources for investments in the various sub-sectors for accelerated growth and poverty reduction in Zambia. Zambia has made substantial progress in extending some infrastructure services, including telecom and roads, to its citizens. However, service delivery in other areas, such as water and sanitation, and electricity has been poor. With Zambia's annual growth increasing and demand for infrastructure services escalating, infrastructure bottlenecks are becoming more acute. This paper is targeted at two main audiences: the first is the broader universe of policymakers, planners, regulators, and technical specialists directly concerned with the delivery of infrastructure services. For these readers, the note provides an overview of the physical, financial, social, and institutional conditions of the country that cut across subsectors. It compares Zambia's infrastructure performance in terms of access rates, affordability, quality, and financial viability of its services to those observed in comparable countries. The second and related audience is the authorities. The note provides them with a sense of the foregone growth opportunities stemming from policy imperfections, an assessment of investment needs for accelerated growth, and how public private partnership can play a role in resource mobilization for the investment needs. The paper takes stock of the most relevant infrastructure issues in the key sectors: energy, water and sanitation and telecommunications.Publication Sierra Leone’s Infrastructure : A Continental Perspective(2011-06-01)Infrastructure development in Sierra Leone contributed about half a percentage point to the economy's per capita growth rate in 2003-07. But if Sierra Leone could upgrade its infrastructure to the level of the best performer in Africa, per capita growth rates could be boosted by more than three percentage points. After nine years of peace, economic activity is flourishing at every level in Sierra Leone. But the 11-year civil war destroyed the country's infrastructure, and rebuilding the road network and ports while improving the electrical, water, and telecommunications infrastructure is proving difficult. Looking ahead, expanding electrification is a top priority because current access levels, at only 1-5 percent of the urban population and 0 percent in rural areas, are impeding other development. The water and sanitation sector faces similar challenges, as only 1 percent of the rural population has access to piped water. Sierra Leone has been spending about $134 million annually on infrastructure in recent years. About $66 million is lost each year to inefficiencies. Comparing spending needs against existing spending and potential efficiency gains leaves an annual funding gap of $59 to $278 million per year. If savings from greater efficiency could be fully captured, Sierra Leone would not meet its posited infrastructure targets for another 30 years. Sierra Leone needs to make difficult decisions about the prioritization of infrastructure investments and must think strategically about bundling and sequencing investments for maximum returns.Publication Sierra Leone's Infrastructure(World Bank, Washington, DC, 2011-03)Infrastructure has contributed significantly to the growth of West African economies during the past decade. In Sierra Leone, infrastructure added only around 0.51 percentage points to the per capita growth rate over 2003-07. Similarly to other countries in the region and the rest of the continent, the boost to historic growth came predominately from the ICT (Information and Telecommunications Technology) revolution while power-sector deficiencies and poor roads held back growth. After nine years of peace, economic activity is flourishing at every level in Sierra Leone. Political stability, high government accountability, good governance standards, and streamlined tax reform helped Sierra Leone to become a bright success story, turning the country into the easiest and quickest place to start business in West Africa. Sierra Leone's image in the eyes of investors is strengthened as the country ranked as one of the top five countries in Africa for investor protection. Looking ahead, the country faces a number of critical infrastructure challenges. Perhaps the most daunting of these challenges lies in the power sector, the poor state of which retards development of other sectors. Access to power is very low, at around 1 to 5 percent in urban areas, and is nonexistent in the countryside. The country's installed power-generation capacity is around 13 megawatts per million people, which is lower than what other low-income and fragile states have installed. The entire existing power infrastructure is concentrated in the western part of the country, and even with the functioning of the Bumbuna power plant, only half the suppressed demand for Freetown, let alone that for the rest of the country, is being met. Regardless of recent reduction in tariffs, Sierra Leoneans still pay some of the highest tariffs in Africa. In 2010, Sierra Leoneans paid three times as much for power as did residents of African countries that relied on hydropower. Making investments in more cost-effective power generation options is therefore an important strategic objective for Sierra Leone, without which further electrification will simply be unaffordable for the wider population.Publication Benin's Infrastructure(World Bank, Washington, DC, 2011-06)Between 2000 and 2005 infrastructure made an important contribution of 1.6 percentage point to Benin's improved per capita growth performance, which was the highest among West African countries during the period. Raising the country's infrastructure endowment to that of the region's middle-income countries could boost annual growth by about 3.2 percentage points. Benin has made significant progress in some areas of its infrastructure. The rural road network is in relatively good condition, and about 30 percent of the rural population has access to an all-season road, a level above the country's peers. Air transport connectivity has improved. Also, important market liberalization reforms designed to attract private capital to the water and information and communications technology (ICT) sectors have boosted performance. In particular, increased competition in the ICT market has contributed to the rapid expansion of mobile and Internet services. Addressing Benin's infrastructure challenges will require sustained expenditures of $712 million per year over the next decade, with heavy emphasis on capital expenditure. Almost half of the total relates to the transport sector. At 16.6 percent of Benin's 2005 gross domestic product (GDP), this effort is almost at the level of other Sub-Saharan African countries. Benin already spends around $452 million per year on infrastructure, equivalent to about 10.5 percent of its GDP. Almost $101 million a year is lost to inefficiencies of various kinds, associated mainly with under pricing in the power and water sectors; poor financial management of utilities; and inefficient allocation of resources across sectors. If Benin could raise tariffs to cost-recovery levels, and reduce operational inefficiencies in line with reasonable developing-country benchmarks, it could substantially boost flows to the infrastructure sectors. Comparing spending needs with existing spending and potential efficiency gains (and assuming that the inefficiencies are fully captured) leaves an annual funding gap of $210 million per year. By far the largest share of the gap can be traced to the water supply and sanitation sectors. Benin has the potential to close this gap by adopting alternative technologies in water supply, transport and power. Savings from alternative technologies could amount to as much as $227 million per year.
Users also downloaded
Showing related downloaded files
Publication Supporting Youth at Risk(World Bank, Washington, DC, 2008)The World Bank has produced this policy Toolkit in response to a growing demand from our government clients and partners for advice on how to create and implement effective policies for at-risk youth. The author has highlighted 22 policies (six core policies, nine promising policies, and seven general policies) that have been effective in addressing the following five key risk areas for young people around the world: (i) youth unemployment, underemployment, and lack of formal sector employment; (ii) early school leaving; (iii) risky sexual behavior leading to early childbearing and HIV/AIDS; (iv) crime and violence; and (v) substance abuse. The objective of this Toolkit is to serve as a practical guide for policy makers in middle-income countries as well as professionals working within the area of youth development on how to develop and implement an effective policy portfolio to foster healthy and positive youth development.Publication World Development Report 2017(Washington, DC: World Bank, 2017-01-30)Why are carefully designed, sensible policies too often not adopted or implemented? When they are, why do they often fail to generate development outcomes such as security, growth, and equity? And why do some bad policies endure? This book addresses these fundamental questions, which are at the heart of development. Policy making and policy implementation do not occur in a vacuum. Rather, they take place in complex political and social settings, in which individuals and groups with unequal power interact within changing rules as they pursue conflicting interests. The process of these interactions is what this Report calls governance, and the space in which these interactions take place, the policy arena. The capacity of actors to commit and their willingness to cooperate and coordinate to achieve socially desirable goals are what matter for effectiveness. However, who bargains, who is excluded, and what barriers block entry to the policy arena determine the selection and implementation of policies and, consequently, their impact on development outcomes. Exclusion, capture, and clientelism are manifestations of power asymmetries that lead to failures to achieve security, growth, and equity. The distribution of power in society is partly determined by history. Yet, there is room for positive change. This Report reveals that governance can mitigate, even overcome, power asymmetries to bring about more effective policy interventions that achieve sustainable improvements in security, growth, and equity. This happens by shifting the incentives of those with power, reshaping their preferences in favor of good outcomes, and taking into account the interests of previously excluded participants. These changes can come about through bargains among elites and greater citizen engagement, as well as by international actors supporting rules that strengthen coalitions for reform.Publication Africa's Future, Africa's Challenge : Early Childhood Care and Development in Sub-Saharan Africa(Washington, DC : World Bank, 2008)This book seeks to achieve a balance, describing challenges that are being faced as well as developments that are underway. It seeks a balance in terms of the voices heard, including not just voices of the North commenting on the South, but voices from the South, and in concert with the North. It seeks to provide the voices of specialists and generalists, of those from international and local organizations, from academia and the field. It seeks a diversity of views and values. Such diversity and complexity are the reality of Sub-Saharan Africa (SSA) today. The major focus of this book is on SSA from the Sahel south. Approximately 130 million children between birth and age 6 live in SSA. Every year 27 million children are born, and every year 4.7 million children under age 5 die. Rates of birth and of child deaths are consistently higher in SSA than in any other part of the world; the under-5 mortality rate of 163 per 1,000 is twice that of the rest of the developing world and 30 times that of industrialized countries (UNICEF 2006). Of the children who are born, 65 percent will experience poverty, 14 million will be orphans affected by HIV/AIDS directly and within their families and one-third will experience exclusion because of their gender or ethnicity.Publication Ten Steps to a Results-Based Monitoring and Evaluation System : A Handbook for Development Practitioners(Washington, DC: World Bank, 2004)An effective state is essential to achieving socio-economic and sustainable development. With the advent of globalization, there are growing pressures on governments and organizations around the world to be more responsive to the demands of internal and external stakeholders for good governance, accountability and transparency, greater development effectiveness, and delivery of tangible results. Governments, parliaments, citizens, the private sector, Non-governmental Organizations (NGOs), civil society, international organizations, and donors are among the stakeholders interested in better performance. As demands for greater accountability and real results have increased, there is an attendant need for enhanced results-based monitoring and evaluation of policies, programs, and projects. This handbook provides a comprehensive ten-step model that will help guide development practitioners through the process of designing and building a results-based monitoring and evaluation system. These steps begin with a 'readiness assessment' and take the practitioner through the design, management, and importantly, the sustainability of such systems. The handbook describes each step in detail, the tasks needed to complete each one, and the tools available to help along the way.Publication World Development Report 1984(New York: Oxford University Press, 1984)Long-term needs and sustained effort are underlying themes in this year's report. As with most of its predecessors, it is divided into two parts. The first looks at economic performance, past and prospective. The second part is this year devoted to population - the causes and consequences of rapid population growth, its link to development, why it has slowed down in some developing countries. The two parts mirror each other: economic policy and performance in the next decade will matter for population growth in the developing countries for several decades beyond. Population policy and change in the rest of this century will set the terms for the whole of development strategy in the next. In both cases, policy changes will not yield immediate benefits, but delay will reduce the room for maneuver that policy makers will have in years to come.