Finding fuel sources to replace coal in power plants is crucial in the march toward decarbonization. Biomass and ammonia are two options offering significant potential. Both can be used with coal or alone in newly constructed facilities or in modified power plants. Relatively new power plants are good candidates for modification. While work is underway demonstrating the feasibility of each material, there are logistical challenges to address, particularly in the case of ammonia.
Link to Data Set
Citation
“Tavoulareas, Stratos. 2024. Using Biomass or Green Ammonia to Replace Coal in Existing Thermal Power Plants: Feasibility and Challenges. Live Wire; 2024/130. © World Bank. http://hdl.handle.net/10986/41670 License: CC BY-NC 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Publication Decarbonizing Ammonia and Nitrogen Fertilizers with Clean Hydrogen(Washington, DC: World Bank, 2025-03-12)Synthetic fertilizers are essential to sustaining the world’s population, but their production is responsible for 1.8–2.4 percent of global greenhouse gas emissions. Clean hydrogen holds growing potential (amid falling costs) to decarbonize fertilizer production. Hydrogen produces synthetic ammonia, a building block of most fertilizers. With the fertilizer market as a reliable off-taker, this shift could support the overall expansion of clean hydrogen, even as it boosts global food security. However, this transition may require adjustments, including changes in fertilizer types and modifications to existing subsidy schemes.Publication Mobilizing Commercial Financing to Scale Up Energy Efficiency in the Public Sector(Washington, DC: World Bank, 2025-01-22)Scaling up energy efficiency is critical to the energy transition—and the public sector is a good place to start. Programs in public buildings, in particular, can introduce new models and thus help shape markets. Given the limits of public financing against huge investment needs, countries must unlock commercial financing. The first steps are to adopt international best practices and select financing mechanisms suited to local policy and regulatory frameworks, public agency characteristics, implementation barriers, and the maturity of financial markets.Publication Mini Grids for Underserved Main Grid Customers(Washington, DC: World Bank, 2024-06-21)Can mini grids help to solve the problem of poorly served main grid connected communities A mini grid is an electricity generation and distribution network that supplies electricity to a localized group of customers. Mini grids can be isolated from or connected to the main grid. To date, most mini grids in Sub-Saharan Africa have been built in electrically isolated rural villages not connected to the main grid. Based on broad experience working with mini grid programs in more than 20 low- and middle-income countries and five detailed case studies, the authors offer observations and recommendations about mini grids in general and a new type known as “undergrid mini grids” being used in Nigeria and India to serve poorly served communities.Publication Net Zero Energy by 2060(Washington, DC: World Bank, 2024-06-07)In the long term, both energy security and decarbonization in the region will depend on substantial increases in national climate ambitions. Achieving those increases will depend, in turn, on equally substantial increases in investment in low-carbon technologies, accompanied by timely policies and regulatory measures. The World Bank has developed a whole-energy-system model, data driven, technology rich, and bottom-up, to project optimal least-cost pathways for Europe and Central Asia to achieve a net zero energy target by 2060. This Live Wire is based on a report published in March 2024 (World Bank and ESMAP 2024).Publication Adapting Spatial Frameworks to Guide Energy Access Interventions in Urbanizing Africa(Washington, DC: World Bank, 2024-06-07)The extension of electricity into rural areas has been the main focus of efforts to achieve universal access to reliable, affordable, and modern energy by 2030. On the African continent and elsewhere, however, rapid urbanization has produced new patterns of human settlement that blur the distinction between rural and urban. As a case study of Kenya demonstrates, access metrics aggregated at the rural or urban level do not equip governments and their partners to properly identify or target sites for electrification. Spatialized frameworks and data that define space along a rural–urban continuum or as urban catchment areas can improve policy makers’ understanding of the specific barriers to access that communities face.
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Error: Could not load results for 'https://openknowledge.worldbank.org/server/api/item/relateditemlistconfigs/3c566876-24fb-481f-a31e-b8bdbd421b09_metadata/itemlist'.
Users also downloaded
Showing related downloaded files
Error: Could not load results for 'https://openknowledge.worldbank.org/server/api/item/relateditemlistconfigs/3c566876-24fb-481f-a31e-b8bdbd421b09_downloads/itemlist'.