Publication: Pakistan - Operational Design for the Project Development Fund and for the Viability Gap Fund
Loading...
Date
2010-03
ISSN
Published
2010-03
Author(s)
Editor(s)
Abstract
This final report is the fifth deliverable for the World Bank funded project 'operational design for the project development fund and for the viability gap fund'. Taking into account feedback and further consideration of issues rose in the previous Reports, it aims to: provide high level recommendations on the overall Public Private Partnership (PPP) framework in Pakistan, recognizing international best practice but also taking into account the specific Pakistan context and the challenges faced their-in; provide the analysis of the project pipeline for PPP projects in Pakistan, on the basis of consultations undertaken in Islamabad in May 2009; and design possible structures for the Project Development Fund (PDF) and for the Viability Gap Fund (VGF), that is informed by the current local enabling environment for PPPs, including the institutional capabilities and the existing pipeline of PPP projects. This final report incorporates feedback from the World Bank and the Government of Pakistan on each of the above-listed issues, which were set out and discussed in details in previous reports.
Link to Data Set
Citation
“World Bank. 2010. Pakistan - Operational Design for the Project Development Fund and for the Viability Gap Fund. © World Bank. http://hdl.handle.net/10986/12391 License: CC BY 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Publication Zimbabwe Public Investment Management Efficiency Review(World Bank, Washington, DC, 2012-06-26)The Public Investment Management (PIM) efficiency review is intended to support the Government of Zimbabwe, and in particular the Ministry of Finance, in its efforts to strengthen the efficiency of the public investment system, with the goal of improving the creation, operation and maintenance of public sector capital assets that support service delivery and economic growth. The problems of public investment management are not merely financial but systemic. Budget execution deficit remains a major bottleneck. Due to large backlogs across sectors, capital budget allocation has prioritized completion and rehabilitation of on-going and stalled projects and programs. Currently, public investment projects are mainly financed by the national budget. Regulatory frameworks for public-private partnerships are in place, but sluggish recovery from the private sector has not made it a notable source of financing for capital projects. Foreign loans and grants, and humanitarian aid from donors are not channeled through the official budget. This report is intended to provide the basis for a follow-on discussion with government on possible options and approaches to addressing the identified problems, focusing on those which are the most critical to Zimbabwe's economic recovery and long term development. It is complementary to the action plan, also developed by the team for consideration by the Government of Zimbabwe, which suggests a list of reform actions over the immediate to medium-term to strengthen the regulatory framework and build capacity across central and implementing agencies. The objective of the policy note is to support the Government of Zimbabwe to strengthen the efficiency of PIM system, with an ultimate goal of contributing to improved governance, service delivery, and economic growth. The study will inform a reform and capacity strengthening action plan with the Government as well as subsequent Bank's proposed technical assistance program to strengthen the PIM.Publication How Do Countries Measure, Manage, and Monitor Fiscal Risks Generated by Public-Private Partnerships? Chile, Peru, South Africa, Turkey(World Bank Group, Washington, DC, 2014-09)The topic of managing fiscal risks arising from public-private partnerships is receiving increased attention as more governments turn toward this type of financing for large infrastructure projects. Governments can manage balance sheet exposure to public-private partnerships by quantifying and capturing direct obligations and provisions for potential calls on government guarantees associated with public-private partnership projects in the preparation of the medium term fiscal framework and annual budget. This working paper examines how four countries with active public-private partnership projects manage the costs and risks of financial obligations generated by these investments throughout the lifetime of the contracts. The paper seeks to complement the existing literature with a practitioner's point of view while exploring if and how these countries monitor and evaluate the fiscal risks generated by the portfolio of public-private partnerships (as well as individual projects). The countries covered are Chile, Peru, South Africa, and Turkey, all of which have experience implementing public-private partnership projects. The research finds that countries have tailored fiscal risk management and monitoring frameworks to fit their circumstances and respective budgeting, accounting, and reporting practices. All four countries assess the overall or partial credit exposure to monitor and manage their fiscal commitments from public-private partnerships in a consolidated way. All countries have developed evaluation models to help assess fiscal risks and assess project and portfolio level credit exposure. Further scrutiny could be focused on budgeting and accounting practices, which could be strengthened and brought in line with international standards. Similarly, sharing and standardizing information would improve transparency and accountability.Publication Public-Private Partnerships in the Context of Public Investment Management in Ukraine(World Bank, Washington, DC, 2016)Ukraines vast needs in infrastructure coupled with a constrained fiscal space require concerted efforts in strengthening public investment management. Investments in infrastructure are important for fostering economic growth. Translating public investments into assets crucially depends on how efficiently all types of public investments are management. The structure to handle PPPs is currently inadequate to access the global PPP market. Since a PPP system needs to be built on the foundations of a workable PIM system, the prospects for Ukraine attracting international standard investments from the global PPP market may appear to be out of reach for the time being. Recent reforming legislation aimed at fixing some of the issues highlighted in the 2012 PIM Assessment is encouraging but much will depend on the effectiveness of the implementation and the capacity of the institutional actors to understand and absorb them. This Assessment must by its very nature capture the situation at the time of the Assessment rather than an expectation of future potential.Publication Potential for Public-Private Partnership in East Timor(World Bank, Washington, DC, 2010-10)This note has been prepared in the context of the International Investment Conference on "Investment and National Building in Timor Leste" that took place on 21-22 October, 2010 in Dili, Timor-Leste. One of the topics of the international conference was a discussion of the potential for Public-Private Partnership in East Timor. This note elaborates on the key messages of the presenters during the conference and it is hoped that it will help guide the Government in moving forward with its PPP agenda.Publication Good Governance in Public-Private Partnerships : A Resource Guide for Practitioners(Washington, DC, 2009-06)Public-Private Partnerships (PPPs) provide a new 'model' for infrastructure service delivery, which combines elements borrowed from other legal economic and financial structures. A mixture of elements derived from public procurement, project finance, concession contracts, and policy network theories provides the background for PPPs structures. PPPs not only articulate such elements in one product but also constitute separate evolutions of the structures they originate from. In part, PPPs have been created to solve some problems those domains have generated or were not able to solve efficiently. However, PPPs are not meant to replace those domains but to provide alternative options to them. The natures of PPPs are associated with a new contract, procurement and relationship type. For some, a PPP is a new 'contract type' whose main characteristics are risk sharing between the public and private party; bundling of construction and operation; output base specifications; and long term commitments serve to define and distinguish the type others PPPs as a 'procurement type', alternative to traditional public procurement (including outsourcing), and concession. For some others, PPPs constitute new 'relationship types' between the Public Administration (PA), private parties and stakeholders involved in an infrastructure service delivery project. Indeed, a PPP is all of the above: a new contract, procurement, and relationship type. The origin of these typological diversities is mainly due to the different perspective legislators, practitioners, and scholars have had toward PPPs.
Users also downloaded
Showing related downloaded files
Publication World Development Report 2006(Washington, DC, 2005)This year’s Word Development Report (WDR), the twenty-eighth, looks at the role of equity in the development process. It defines equity in terms of two basic principles. The first is equal opportunities: that a person’s chances in life should be determined by his or her talents and efforts, rather than by pre-determined circumstances such as race, gender, social or family background. The second principle is the avoidance of extreme deprivation in outcomes, particularly in health, education and consumption levels. This principle thus includes the objective of poverty reduction. The report’s main message is that, in the long run, the pursuit of equity and the pursuit of economic prosperity are complementary. In addition to detailed chapters exploring these and related issues, the Report contains selected data from the World Development Indicators 2005‹an appendix of economic and social data for over 200 countries. This Report offers practical insights for policymakers, executives, scholars, and all those with an interest in economic development.Publication The Journey Ahead(Washington, DC: World Bank, 2024-10-31)The Journey Ahead: Supporting Successful Migration in Europe and Central Asia provides an in-depth analysis of international migration in Europe and Central Asia (ECA) and the implications for policy making. By identifying challenges and opportunities associated with migration in the region, it aims to inform a more nuanced, evidencebased debate on the costs and benefits of cross-border mobility. Using data-driven insights and new analysis, the report shows that migration has been an engine of prosperity and has helped address some of ECA’s demographic and socioeconomic disparities. Yet, migration’s full economic potential remains untapped. The report identifies multiple barriers keeping migration from achieving its full potential. Crucially, it argues that policies in both origin and destination countries can help maximize the development impacts of migration and effectively manage the economic, social, and political costs. Drawing from a wide range of literature, country experiences, and novel analysis, The Journey Ahead presents actionable policy options to enhance the benefits of migration for destination and origin countries and migrants themselves. Some measures can be taken unilaterally by countries, whereas others require close bilateral or regional coordination. The recommendations are tailored to different types of migration— forced displacement as well as high-skilled and low-skilled economic migration—and from the perspectives of both sending and receiving countries. This report serves as a comprehensive resource for governments, development partners, and other stakeholders throughout Europe and Central Asia, where the richness and diversity of migration experiences provide valuable insights for policy makers in other regions of the world.Publication Lebanon Economic Monitor, Fall 2022(Washington, DC, 2022-11)The economy continues to contract, albeit at a somewhat slower pace. Public finances improved in 2021, but only because spending collapsed faster than revenue generation. Testament to the continued atrophy of Lebanon’s economy, the Lebanese Pound continues to depreciate sharply. The sharp deterioration in the currency continues to drive surging inflation, in triple digits since July 2020, impacting the poor and vulnerable the most. An unprecedented institutional vacuum will likely further delay any agreement on crisis resolution and much needed reforms; this includes prior actions as part of the April 2022 International Monetary Fund (IMF) staff-level agreement (SLA). Divergent views among key stakeholders on how to distribute the financial losses remains the main bottleneck for reaching an agreement on a comprehensive reform agenda. Lebanon needs to urgently adopt a domestic, equitable, and comprehensive solution that is predicated on: (i) addressing upfront the balance sheet impairments, (ii) restoring liquidity, and (iii) adhering to sound global practices of bail-in solutions based on a hierarchy of creditors (starting with banks’ shareholders) that protects small depositors.Publication Argentina Country Climate and Development Report(World Bank, Washington, DC, 2022-11)The Argentina Country Climate and Development Report (CCDR) explores opportunities and identifies trade-offs for aligning Argentina’s growth and poverty reduction policies with its commitments on, and its ability to withstand, climate change. It assesses how the country can: reduce its vulnerability to climate shocks through targeted public and private investments and adequation of social protection. The report also shows how Argentina can seize the benefits of a global decarbonization path to sustain a more robust economic growth through further development of Argentina’s potential for renewable energy, energy efficiency actions, the lithium value chain, as well as climate-smart agriculture (and land use) options. Given Argentina’s context, this CCDR focuses on win-win policies and investments, which have large co-benefits or can contribute to raising the country’s growth while helping to adapt the economy, also considering how human capital actions can accompany a just transition.Publication Classroom Assessment to Support Foundational Literacy(Washington, DC: World Bank, 2025-03-21)This document focuses primarily on how classroom assessment activities can measure students’ literacy skills as they progress along a learning trajectory towards reading fluently and with comprehension by the end of primary school grades. The document addresses considerations regarding the design and implementation of early grade reading classroom assessment, provides examples of assessment activities from a variety of countries and contexts, and discusses the importance of incorporating classroom assessment practices into teacher training and professional development opportunities for teachers. The structure of the document is as follows. The first section presents definitions and addresses basic questions on classroom assessment. Section 2 covers the intersection between assessment and early grade reading by discussing how learning assessment can measure early grade reading skills following the reading learning trajectory. Section 3 compares some of the most common early grade literacy assessment tools with respect to the early grade reading skills and developmental phases. Section 4 of the document addresses teacher training considerations in developing, scoring, and using early grade reading assessment. Additional issues in assessing reading skills in the classroom and using assessment results to improve teaching and learning are reviewed in section 5. Throughout the document, country cases are presented to demonstrate how assessment activities can be implemented in the classroom in different contexts.