Abstract
This paper provides an overview of the Trung Son hydropower project preparation experience and highlights the innovative features of the project, primarily focusing on the adoption of new approaches in project design and integration of social and environmental concerns. Through disseminating the Trung Son project experience, this paper is intended to contribute to the sustainable scale-up of medium scale hydropower in Vietnam, based on practical experience. This paper was funded by the Australian Agency for International Development (AusAID) as part of a broader activity supporting sustainable hydropower development in Vietnam. Resources from the AusAID-East Asia infrastructure for growth trust fund supplemented those available to the World Bank task team in charge of the project. This paper is made up of three parts: Part A introduces the Trung Son hydropower project. Part B presents highlights from the Trung Son hydropower project, focusing on the main themes addressed during preparation. Part C contains the authors' conclusions about why the Trung Son hydropower project experience matters, and discusses the features that make it a good example for future scale-up of sustainable hydropower development in Vietnam as well as for hydropower development in other countries.
Link to Data Set
Citation
Spencer, Richard; Gencer, Defne. 2012. New Approaches for Medium-Scale Hydropower Development in Vietnam: Lessons from Preparation of the Trung Son Hydropower Project. © World Bank. http://hdl.handle.net/10986/40188 License: CC BY-NC 3.0 IGO.
Associated URLs
Associated content
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections

Related items

Showing items related by metadata.

  • Publication
    Good Dams and Bad Dams : Environmental Criteria for Site Selection of Hydroelectric Projects
    (World Bank, Washington, DC, 2003-11) Ledec, George; Quintero, Juan David
    This paper provides a simple, yet robust, methodology for comparing proposed hydroelectric project sites in terms of their expected negative environmental impacts, and relating these to power generation benefits. The paper also summarizes the environmental mitigation options for large dams. If properly implemented, these mitigation measures can effectively prevent, minimize, or compensate for many (though not all) of a hydroelectric project's negative impacts. Nonetheless, the most effective environmental mitigation measure is good site selection, to ensure that the proposed dam will cause relatively little damage in the first place. The paper presents quantitative indicators (using data that are relatively easy to obtain) for rating and ranking proposed new hydroelectric projects in terms of their likely adverse environmental impacts. Projects with a small reservoir surface area (relative to power generation) tend to be most desirable from both an environmental and social standpoint, in part because they minimize natural habitat losses as well as resettlement needs. In general, the most environmentally benign hydroelectric dam sites are on upper tributaries, while the most problematic ones are on the large main stems of rivers.
  • Publication
    A Guide for Local Benefit Sharing in Hydropower Projects
    (World Bank, Washington, DC, 2012-06) Wang, Chaogang
    Local benefit sharing in hydropower projects can be defined as the systematic efforts by project proponents to sustainably benefit local communities affected by hydropower investments. Benefit sharing is a promising approach for implementing hydropower projects sustainably, and is emerging as a supplement to the requirements of compensation and mitigation. Benefit sharing can provide equitable development, sustainability, and smooth project implementation for hydropower development. For benefit sharing mechanisms to work, the key enabling conditions are government policies, the legal and regulatory framework, corporate social responsibility strategies of development companies, and the capacity of local communities. Stakeholder engagement is essential in initiating and designing benefit sharing programs. This guide provides some advice to task teams on how to design effective local benefit sharing mechanisms in hydropower projects. Benefit sharing arrangements would ensure that local communities have the opportunity to benefit directly from hydropower development, which will make hydropower projects more environmentally and socially sustainable. As a long-term arrangement, benefit sharing can facilitate local development. It can respond to unexpected environmental circumstances in the operation of dams to ensure local communities receive adequate benefits. Arrangements for the equitable sharing of benefits can offer scope for local communities and all other stakeholders to avoid conflicts and focus on creating synergies to maximize local development opportunities.
  • Publication
    Environmental Licensing for Hydroelectric Projects in Brazil : A Contribution to the Debate
    (Washington, DC, 2008-03-28) World Bank
    This study points out that hydroelectric plants will continue to play a prominent role in the Brazilian electric matrix. A significant portion of the potential hydroelectric plants of the country is located in the Amazon, environmentally sensitive region. The licensing of hydroelectric projects in Brazil is considered a major obstacle for the expanding the capacity of generating electricity. The non-expansion, in turn, represents a serious threat to economic growth. This study, designed as a contribution to the debate in progress about the subject, examines the legal and institutional milestones of the environmental licensing of hydroelectric ventures, including studies of selected cases, an assessment of transaction costs of the processes and a comparison with international practices. Two conclusions emerge from this study. The first is that the costs of dealing with environmental issues and social development of enterprises hydroelectric in Brazil represent 12 percent of the total cost of the work. And the second is that costs of taxes, in general, the contractual and regulatory uncertainty, excluding the licensing environmental, represent about 7.5 percent of the total cost. In other words, the conclusion is clear: the environmental and social costs can be easily integrated. This study does not suggest radical changes to the system of environmental licensing. Any reform of the Brazilian environmental licensing can not be dealt with based on a single, simple solution. Rather, the system is complex and multifaceted, with a long legal and institutional history. A process of broad national discussion on the energy issue and its implications for environmental goods of the country is essential and is already in progress.
  • Publication
    Cumulative Impacts and Joint Operation of Small-Scale Hydropower Cascades
    (World Bank, Washington, DC, 2014-02-01) World Bank
    Increasing energy demands and concerns about global warming call for an increase in energy generation from renewable sources. Small hydropower plants represent a significant contribution to meet this demand. But the optimal use of this resource in a sustainable manner still remains a challenge. A cascade of small dams may have detrimental impacts on the environment and water use without implementation of proper mitigation measures and planning. To obtain more insight in the consequences of hydropower cascades and possibilities to improve the cascade planning process in order to reduce such impacts, the Vietnamese Ministry of Industry and Trade and the World Bank jointly initiated the study on cumulative impacts and joint operation of small-scale hydropower cascades Supported by the Renewable Energy Development Program (REDP) in Vietnam. Chapter two provides a brief background on the small-scale hydropower development in Vietnam including its current planning procedures, while Chapter three provides a description of the six studied river basins. Chapter four describes the approach, methods and definitions of the study. During the first phase of the study all six rivers were screened for potential significant cumulative impacts. The results of this screening were presented in a separate report, of which the summary is given in chapter five. This screening showed that for four of the rivers significant cumulative impacts can be expected, which merited further detailed analysis. These four rivers are Ngoi Xan, Nam Tha, Nam Chien and Sap. For each of the four detailed study cases a description of the river basin and hydropower cascade has been made, the hydrological and environmental impacts were assessed and opportunities for joint operations quantified. This report presents summaries of the cumulative impact analyses (chapter six) and draws general conclusions with respect to present and future environmental conditions (chapter seven). It also summarizes the results of the optimization modeling for each cascade (chapter eight) and provides recommendations for future planning and cascade operation (chapter nine).
  • Publication
    The Potential of Regional Power Sector Integration : Manantali Generation Case Study
    (World Bank, Washington, DC, 2009-09) Economic Consulting Associates
    Developing countries are increasingly pursuing and benefitting from regional power system integration (RPSI) as an important strategy to help provide reliable, affordable electricity to their economies and citizens. Increased electricity cooperation and trade between countries can enhance energy security, bring economies-of-scale in investments, facilitate financing, enable greater renewable energy penetration, and allow synergistic sharing of complementary resources. This briefing note draws from the experiences of RPSI schemes around the world to present a set of findings to help address these challenges. It is based on case studies of 12 RPSI projects and how they are dealing with key aspects of RPSI, such as: (i) finding the right level of integration; (ii) optimizing investment on a regional basis; (iii) appropriate regional institutions (iv) technical and regulatory harmonization; (v) power sector reform and integration (vi) the role of donor agencies (vii) reducing emissions through RPSI; and (viii) RPSI and renewable energy.

Users also downloaded

Showing related downloaded files

  • Publication
    World Development Report 2006
    (Washington, DC, 2005) World Bank
    This year’s Word Development Report (WDR), the twenty-eighth, looks at the role of equity in the development process. It defines equity in terms of two basic principles. The first is equal opportunities: that a person’s chances in life should be determined by his or her talents and efforts, rather than by pre-determined circumstances such as race, gender, social or family background. The second principle is the avoidance of extreme deprivation in outcomes, particularly in health, education and consumption levels. This principle thus includes the objective of poverty reduction. The report’s main message is that, in the long run, the pursuit of equity and the pursuit of economic prosperity are complementary. In addition to detailed chapters exploring these and related issues, the Report contains selected data from the World Development Indicators 2005‹an appendix of economic and social data for over 200 countries. This Report offers practical insights for policymakers, executives, scholars, and all those with an interest in economic development.
  • Publication
    Lebanon Economic Monitor, Fall 2022
    (Washington, DC, 2022-11) World Bank
    The economy continues to contract, albeit at a somewhat slower pace. Public finances improved in 2021, but only because spending collapsed faster than revenue generation. Testament to the continued atrophy of Lebanon’s economy, the Lebanese Pound continues to depreciate sharply. The sharp deterioration in the currency continues to drive surging inflation, in triple digits since July 2020, impacting the poor and vulnerable the most. An unprecedented institutional vacuum will likely further delay any agreement on crisis resolution and much needed reforms; this includes prior actions as part of the April 2022 International Monetary Fund (IMF) staff-level agreement (SLA). Divergent views among key stakeholders on how to distribute the financial losses remains the main bottleneck for reaching an agreement on a comprehensive reform agenda. Lebanon needs to urgently adopt a domestic, equitable, and comprehensive solution that is predicated on: (i) addressing upfront the balance sheet impairments, (ii) restoring liquidity, and (iii) adhering to sound global practices of bail-in solutions based on a hierarchy of creditors (starting with banks’ shareholders) that protects small depositors.
  • Publication
    Morocco Economic Update, Winter 2025
    (Washington, DC: World Bank, 2025-04-03) World Bank
    Despite the drought causing a modest deceleration of overall GDP growth to 3.2 percent, the Moroccan economy has exhibited some encouraging trends in 2024. Non-agricultural growth has accelerated to an estimated 3.8 percent, driven by a revitalized industrial sector and a rebound in gross capital formation. Inflation has dropped below 1 percent, allowing Bank al-Maghrib to begin easing its monetary policy. While rural labor markets remain depressed, the economy has added close to 162,000 jobs in urban areas. Morocco’s external position remains strong overall, with a moderate current account deficit largely financed by growing foreign direct investment inflows, underpinned by solid investor confidence indicators. Despite significant spending pressures, the debt-to-GDP ratio is slowly declining.
  • Publication
    Argentina Country Climate and Development Report
    (World Bank, Washington, DC, 2022-11) World Bank Group
    The Argentina Country Climate and Development Report (CCDR) explores opportunities and identifies trade-offs for aligning Argentina’s growth and poverty reduction policies with its commitments on, and its ability to withstand, climate change. It assesses how the country can: reduce its vulnerability to climate shocks through targeted public and private investments and adequation of social protection. The report also shows how Argentina can seize the benefits of a global decarbonization path to sustain a more robust economic growth through further development of Argentina’s potential for renewable energy, energy efficiency actions, the lithium value chain, as well as climate-smart agriculture (and land use) options. Given Argentina’s context, this CCDR focuses on win-win policies and investments, which have large co-benefits or can contribute to raising the country’s growth while helping to adapt the economy, also considering how human capital actions can accompany a just transition.
  • Publication
    Classroom Assessment to Support Foundational Literacy
    (Washington, DC: World Bank, 2025-03-21) Luna-Bazaldua, Diego; Levin, Victoria; Liberman, Julia; Gala, Priyal Mukesh
    This document focuses primarily on how classroom assessment activities can measure students’ literacy skills as they progress along a learning trajectory towards reading fluently and with comprehension by the end of primary school grades. The document addresses considerations regarding the design and implementation of early grade reading classroom assessment, provides examples of assessment activities from a variety of countries and contexts, and discusses the importance of incorporating classroom assessment practices into teacher training and professional development opportunities for teachers. The structure of the document is as follows. The first section presents definitions and addresses basic questions on classroom assessment. Section 2 covers the intersection between assessment and early grade reading by discussing how learning assessment can measure early grade reading skills following the reading learning trajectory. Section 3 compares some of the most common early grade literacy assessment tools with respect to the early grade reading skills and developmental phases. Section 4 of the document addresses teacher training considerations in developing, scoring, and using early grade reading assessment. Additional issues in assessing reading skills in the classroom and using assessment results to improve teaching and learning are reviewed in section 5. Throughout the document, country cases are presented to demonstrate how assessment activities can be implemented in the classroom in different contexts.