Publication: The Private Infrastructure Industry : Company Approaches
Loading...
Date
1995-10
ISSN
Published
1995-10
Editor(s)
Abstract
The global private infrastructure industry has experienced rapid growth over the past fifteen years, attracting some 1,700 companies. In the past, infrastructure was generally managed by national single-sector utilities, but technological and regulatory change has allowed companies to cross traditional boundaries. The authors look at the origins of companies in the industry and at their sectoral and geographic diversification.
Link to Data Set
Citation
“So, Jae; Shin, Ben. 1995. The Private Infrastructure Industry : Company Approaches. at a glance. © World Bank. http://hdl.handle.net/10986/11646 License: CC BY 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Publication Private Solutions for Infrastructure in Angola : A Country Framework Report(Washington, DC: World Bank, 2005)The Country Framework Report (CFR) for Angola is one of a series of country reviews aimed at improving the environment for private sector involvement in infrastructure. The report seeks to assist the Government of Angola in developing policies, and a framework to promote private participation in the rebuilding, and development of the country's infrastructure. Following the years of conflict, and the resulting damage to the country's infrastructure, as well as the negative impacts on economic growth and development, the country's investment needs are enormous. This study is particularly focused on how to maximize the private sector's role and contribution. The report's scope is on investment in infrastructure in the following sectors: electricity and gas; water and sanitation; transport; and, telecommunications. For each sector, a separate section in the report covers the current situation, opportunities for private sector participation in infrastructure (PPI), PPI barriers, and, measures and actions to promote more private involvement. A further section covers cross-sectoral issues. This CFR concludes with an action plan that identifies the steps that need to be taken to promote, encourage, and facilitate PPI in the short, medium, and long term.Publication Alternatives to Infrastructure Privatization Revisited : Public Enterprise Reform from the 1960s to the 1980s(World Bank, Washington, DC, 2007-11)Frustration with the performance of State-owned enterprises (SOEs) has led to two rounds of reform: the first round, from the 1960s through the 1980s, attempted to improve SOE performance while maintaining public ownership while the second, beginning in the late 1980s, viewed privatization as the answer. Interest in the earlier round of reform has increased recently as controversy has slowed or halted privatization in many countries, especially for SOEs providing infrastructure services that are basic to everyday life and are thought to have elements of monopoly. This paper reexamines the earlier round of reforms, focusing particularly on efforts to increase the firms' capacity with infusions of human and physical capital, to strengthen managerial incentives through performance contracts and corporatization and to alter the mix of political and economic forces that impinge on the firm by strengthening the involvement of taxpayers, customers or private investors. The review suggests that these earlier approaches generated only modest success but that some of them, selectively applied, may be helpful in improving the performance of infrastructure firms that remain in public hands.Publication Public-Private Partnerships(World Bank, Washington, DC, 2015-06)This paper provides perspectives on patterns of public-private partnerships in infrastructure across time and space. Public-private partnerships are a new term for old concepts. Much infrastructure started under private auspices. Then many governments nationalized the ventures. Governments often push infrastructure providers to keep prices low. In emerging markets, the price of water covers maybe 30 percent of costs on average, that of electricity some 80 percent of costs. This renders public infrastructure ventures dependent on subsidies. When governments run into fiscal troubles, they often look again for public-private partnerships, and price increases. As a result, public-private partnerships keep making a comeback in most countries, but are not always loved. Waves of interest in public-private partnerships sweep different countries at different times. Overall, in emerging markets today, public-private partnerships account for some 20 percent of infrastructure investments, with wide variations across countries and from year to year. There is no “killer” rationale for public-private partnerships. They can help raise financing when governments face borrowing constraints. They can be more efficient when sound incentives are applied. Existing evaluations suggest public-private partnerships tend to perform often a bit better than public provision. Yet, well-run governments can do as well. Public-private partnerships provide mechanisms to improve the governance of infrastructure ventures where governments are flawed. Once the fiscal troubles are over, the politics of pricing assert themselves again. Tight pricing erodes the profitability of public-private partnerships and the wheel of privatization and nationalization keeps turning, as it has since modern infrastructure services were invented.Publication Private Solutions for Infrastructure in Lesotho : A Country Framework Report(Washington, DC: World Bank, 2004)The report looks at Lesotho, a predominantly mountainous, land-locked, poor country with a small population, limited natural resources, and a very fragile ecology. It has low gross national income, and a significant poverty level. To ameliorate this condition, the government has embarked on a pro-poor, growth strategy that includes public, and private investment in infrastructure. It explores the level of private participation at this phase in the evolution of the reforms, which is considerable, given the country's small size, limited institutional capacity, and lack of public and private investment capital. Telecommunications has recorded the most significant reform of any of the infrastructure sectors. Other than telecommunications, reforms in other sectors have not advanced significantly. Not surprisingly, the report identifies specific lessons learned from the telecommunications sector, and examines their relevance to reform efforts under way in the other sectors. In summary, this report finds that private participation in infrastructure could offer Lesotho three key advantages: 1) augmenting budget resources in cases where the private sector undertakes to finance projects, or services that would not otherwise be funded, 2) improving the quality and efficiency of service delivery, and, 3) accelerating investments in infrastructure. By the same token, the report makes clear that private participation in infrastructure (PPI) carries significant down-side risks that, despite the best of intentions, could lead to negative fiscal impacts, lower than expected service quality, disruptions to service, or more dire consequences. The report presents an action plan with three primary elements: 1) the creation of a PPI Facilitation Unit to assist line ministries in implementing PPI projects; 2) specific priorities pertinent to each respective infrastructure sector; and, 3) cross-cutting reform measures addressing policy, regulatory, and legal actions needed to provide an enabling framework, and facilitating environment for PPI projects.Publication Building Integrated Markets within the East African Community : EAC Opportunities in Public-Private Partnership Approaches to the Region's Infrastructure Needs(Washington, DC, 2014-06-01)There are significant economic gains to be realized if the East Africa sub region improves the overall integration of its markets. But infrastructure development that links markets across countries faces particular challenges, political, institutional, and economic. In the case of East Africa, these challenges have served to hold back investment into regional infrastructure, despite significant recent efforts within the region to develop regional infrastructure investment plans and promote an increased use of Public-Private Partnership (PPP) approaches to mobilize private sector financing and expertise. The report also recommends funding options for regional PPPs. The two main products identified are a Viability Gap Facility (VGF), which would bridge the gap between the commercial viability of a regional PPP and its economic viability; and a Project Development Facility (PDF), which could support the preparation costs of regional PPPs. The VGF could potentially be linked to the EAC Development Fund. Partner States need to be aware when designing these products that they may compete for funds with domestic financing needs. The report also considers the desirability of a regional long-term debt facility, and while there is widespread recognition of the need for longer-term local currency financing, the challenges involved in implementing such a facility are such that this will need to be revisited at a future date.
Users also downloaded
Showing related downloaded files
Publication Media and Messages for Nutrition and Health(World Bank, Washington, DC, 2020-06)The Lao People’s Democratic Republic (Lao PDR) has experienced rapid and significant economic growth over the past decade. However, poor nutritional outcomes remain a concern. Rates of childhood undernutrition are particularly high in remote, rural, and upland areas. Media have the potential to play an important role in shaping health and nutrition–related behaviors and practices as well as in promoting sociocultural and economic development that might contribute to improved nutritional outcomes. This report presents the results of a media audit (MA) that was conducted to inform the development and production of mass media advocacy and communication strategies and materials with a focus on maternal and child health and nutrition that would reach the most people from the poorest communities in northern Lao PDR. Making more people aware of useful information, essential services and products and influencing them to use these effectively is the ultimate goal of mass media campaigns, and the MA measures the potential effectiveness of media efforts to reach this goal. The effectiveness of communication channels to deliver health and nutrition messages to target beneficiaries to ensure maximum reach and uptake can be viewed in terms of preferences, satisfaction, and trust. Overall, the four most accessed media channels for receiving information among communities in the study areas were village announcements, mobile phones, television, and out-of-home (OOH) media. Of the accessed media channels, the top three most preferred channels were village announcements (40 percent), television (26 percent), and mobile phones (19 percent). In terms of trust, village announcements were the most trusted source of information (64 percent), followed by mobile phones (14 percent) and television (11 percent). Hence of all the media channels, village announcements are the most preferred, have the most satisfied users, and are the most trusted source of information in study communities from four provinces in Lao PDR with some of the highest burden of childhood undernutrition.Publication Mexico Poverty and Equity Assessment(Washington, DC: World Bank, 2025-02-20)This Mexico Poverty and Equity Assessment reviews the evidence about poverty and equity in Mexico over the last two decades, compares it to comparable international experience, and identifies a set of critical areas of policy intervention to answer the opening question. The report aims at contributing to an open conversation in Mexico about how to achieve this essential policy objective. This report postulates three main policy areas needed for poverty eradication in Mexico: inclusive growth, efficient social policy, and infrastructure to confront vulnerability. The report includes four sections, the first three of which collect evidence about poverty, social deprivations, and vulnerability and how the evolution of these three correlates to patterns of economic growth, social protection policy and territorial development. The fourth section provides some quantitative benchmarks of what it would take to eradicate extreme poverty in Mexico. Poverty in Mexico is defined not only in monetary terms, but also in a multidimensional manner that includes social deprivations. These are social deprivations that often define formal-vs-informal employment, so policy changes that close these carencias, as they are called in Mexico, will also reduce the informality gap. This report documents the evolution of poverty, social deprivations, and vulnerability to poverty. It explains the main forces that have driven this evolution and advises that many of these forces may not operate the same in the future as they did in the past. It provides the basis to argue that short to medium term extreme poverty eradication requires newer policy actions in terms of inclusive growth, more efficient social policy, and investments in physical and social infrastructure to reduce vulnerability. The report indicates that short to medium term eradication to extreme poverty is a major, but within reach, development challenge for Mexico.Publication Making Procurement Work Better – An Evaluation of the World Bank’s Procurement System(Washington, DC: World Bank, 2024-12-06)This evaluation assesses the results, successes, and challenges of the World Bank 2016 procurement reform. Procurements acquire the works, goods, and services necessary to achieve the World Bank’s project development outcomes. The World Bank’s procurement processes must ensure that clients get the best value for every development dollar. In 2016, the World Bank reformed its procurement system for Investment Project Financing and launched a new procurement framework aimed at enhancing the Bank’s development effectiveness through better procurement. The reform sought to reduce procurement bottlenecks impeding project performance and modernize procurement systems. It emphasized cutting edge international good practice principles and was intended to be accompanied by procurement capacity strengthening to help client countries. This evaluation offers three recommendations to scale up reform implementation and enhance portfolio and project performance: (i) Improve change management support for the reform’s implementation. (ii) Strategically strengthen country-level procurement capacity. (iii) Consistently manage the full spectrum of procurement risks to maximize project success.Publication Remarks at the United Nations Biodiversity Conference(World Bank, Washington, DC, 2021-10-12)World Bank Group President David Malpass discussed biodiversity and climate change being closely interlinked, with terrestrial and marine ecosystems serving as critically important carbon sinks. At the same time climate change acts as a direct driver of biodiversity and ecosystem services loss. The World Bank has financed biodiversity conservation around the world, including over 116 million hectares of Marine and Coastal Protected Areas, 10 million hectares of Terrestrial Protected Areas, and over 300 protected habitats, biological buffer zones and reserves. The COVID pandemic, biodiversity loss, climate change are all reminders of how connected we are. The recovery from this pandemic is an opportunity to put in place more effective policies, institutions, and resources to address biodiversity loss.Publication Economic Recovery(World Bank, Washington, DC, 2021-04-06)World Bank Group President David Malpass spoke about the world facing major challenges, including COVID, climate change, rising poverty and inequality and growing fragility and violence in many countries. He highlighted vaccines, working closely with Gavi, WHO, and UNICEF, the World Bank has conducted over one hundred capacity assessments, many even more before vaccines were available. The World Bank Group worked to achieve a debt service suspension initiative and increased transparency in debt contracts at developing countries. The World Bank Group is finalizing a new climate change action plan, which includes a big step up in financing, building on their record climate financing over the past two years. He noted big challenges to bring all together to achieve GRID: green, resilient, and inclusive development. Janet Yellen, U.S. Secretary of the Treasury, mentioned focusing on vulnerable people during the pandemic. Kristalina Georgieva, Managing Director of the International Monetary Fund, focused on giving everyone a fair shot during a sustainable recovery. All three commented on the importance of tackling climate change.