Fail-Safe Management : Five Rules to Avoid Project Failure

Loading...
Thumbnail Image
Files in English
English PDF (2.34 MB)
4,064 downloads
English Text (210.53 KB)
439 downloads
Date
2013-05
ISSN
Published
2013-05
Author(s)
Hamilton, Billy C.
Abstract
Project failures are not confined to the development world. In 2004 Hartman and Ashrafi found that the project failure rate is above 60 percent for construction, engineering, and other technology projects, despite all the advances in project management theory and practice. This book's interest, however, is in the very large percentage of projects not subject to events beyond the control of project managers. In this regard, attention to the possibility of failure is the best guarantee of success. Understandably, public managers may be uncomfortable with such an inherently negative approach to managing public projects, which are, after all, designed and intended to produce a public good or to solve a public problem. The point is not to be pessimistic but realistic in managing public projects. Anticipating and solving problems can avert compounding those problems and the failures that result. And this book delivered five rule to avoid project failure: i) make it about the how; ii) keep your champions close but your critics closer; iii) informal networks matter-work with them; iv) unclog the pipes; and v) build the ship as it sails.
Link to Data Set
Citation
Zall Kusek, Jody; Hamilton, Billy C.. 2013. Fail-Safe Management : Five Rules to Avoid Project Failure. © Washington, DC: World Bank. http://hdl.handle.net/10986/15770 License: CC BY 3.0 IGO.
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Associated URLs
Associated content
Citations