Publication: Infrastructure Monitor 2024
Loading...
Files
368 downloads
158 downloads
148 downloads
46 downloads
82 downloads
Date
2025-04-28
ISSN
Published
2025-04-28
Author(s)
Editor(s)
Abstract
The Infrastructure Monitor report covers global trends in private investment in infrastructure to inform investors, policy-makers and other practitioners. The objective is to deliver global insights on global infrastructure trends across key topics such as investment volumes, performance, blended finance, and ESG drivers, facilitating the monitoring of private infrastructure investment and its performance. These insights aim to support policymakers, investors, and other stakeholders in developing sustainable, resilient, and inclusive infrastructure while fostering effective partnerships with the private sector. Acknowledging the significant infrastructure data gap — with notable variations in coverage, quality across countries and income groups, and differences in the availability of regional breakdowns — our approach leverages the best available aggregated data from leading infrastructure databases to generate market insights while also providing context on its limitations. 2025 will be the fifth version of the report, the first under the World Bank.
Link to Data Set
Citation
“World Bank. 2025. Infrastructure Monitor 2024. © World Bank. http://hdl.handle.net/10986/43120 License: CC BY-NC 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Publication The Democratic Republic of Congo's Infrastructure(World Bank, Washington, DC, 2010-03)The Africa Infrastructure Country Diagnostic (AICD) has gathered and analyzed extensive data on infrastructure in around 40 Sub-Saharan countries, including the Democratic Republic of Congo (DRC). The results have been presented in reports covering different areas of infrastructure ICT, irrigation, power, transport, water and sanitation and different policy areas, including investment needs, fiscal costs, and sector performance. This report presents the key AICD findings for the DRC, allowing the country's infrastructure situation to be benchmarked against that of its African peers. Given that the DRC is a fragile state trying to catch up with other low-income countries (LICs) in the region, both fragile-state and LIC African benchmarks will be used to evaluate the DRC's situation. Detailed comparisons will also be made with immediate regional neighbors in Central Africa. Several methodological issues should be borne in mind. First, because of the cross-country nature of data collection, a time lag is inevitable. The period covered by the AICD runs from 2001 to 2006. Most technical data presented are for 2006 (or the most recent year available), while financial data are typically averaged over the available period to smooth out the effect of short-term fluctuations. Second, in order to make comparisons across countries, indicators had to be standardized to place the analysis on a consistent basis. This means that some of the indicators presented here may be slightly different from those that are routinely reported and discussed at the country level. During the period from 2001 to 2005, per capita economic growth in DRC was on average 2.1 percent higher than during the period from 1991 to 1995. Despite this improvement, growth levels, which oscillated between 4 and 8 percent in the early 2000s, still fell short of the sustained 7 percent per year needed to meet the Millennium Development Goals (MDGs). Improved telecommunications infrastructure has been the main driver of this change, contributing 1.1 percentage points to the country's per capita growth rate. Deficiencies in power infrastructure, on the other hand, held back per capita growth by 0.25 percentage point over this period.Publication Results and Performance of the World Bank Group 2013 : An Independent Evaluation. Volume 1. Main Report(World Bank, Washington, DC, 2014)The global extreme poverty rate has fallen by half since 1990, but progress within the developing world has been uneven. Extreme poverty remains widespread in most low-income countries while many middle-income countries also continue to have substantial levels with many people there who have escaped extreme poverty remaining poor and vulnerable. Nor has there been robust progress in sharing prosperity: in many developing countries rapid growth has been accompanied by rising inequality, often with a geographic and ethnic dimension as progress in isolated areas has lagged behind. This appendix describes select elements of the evaluation systems in the World Bank, the International Finance Corporation (IFC), and the Multilateral Investment Guarantee Agency (MIGA) that are the basis for this report. They illustrate commonalities as well as differences in evaluation practices across the institutions. The World Bank, IFC, and MIGA differ in the instruments and approaches they use to achieve development results. Each institution has an evaluation system tailored to its needs. In each organization, the evaluation system comprises different components, self-evaluation, independent evaluation, and validation of self-evaluation.Publication Building Integrated Markets within the East African Community : EAC Opportunities in Public-Private Partnership Approaches to the Region's Infrastructure Needs(Washington, DC, 2014-06-01)There are significant economic gains to be realized if the East Africa sub region improves the overall integration of its markets. But infrastructure development that links markets across countries faces particular challenges, political, institutional, and economic. In the case of East Africa, these challenges have served to hold back investment into regional infrastructure, despite significant recent efforts within the region to develop regional infrastructure investment plans and promote an increased use of Public-Private Partnership (PPP) approaches to mobilize private sector financing and expertise. The report also recommends funding options for regional PPPs. The two main products identified are a Viability Gap Facility (VGF), which would bridge the gap between the commercial viability of a regional PPP and its economic viability; and a Project Development Facility (PDF), which could support the preparation costs of regional PPPs. The VGF could potentially be linked to the EAC Development Fund. Partner States need to be aware when designing these products that they may compete for funds with domestic financing needs. The report also considers the desirability of a regional long-term debt facility, and while there is widespread recognition of the need for longer-term local currency financing, the challenges involved in implementing such a facility are such that this will need to be revisited at a future date.Publication Indonesia - Investing in the future of Papua and West Papua : Infrastructure for sustainable development(World Bank, 2009-10-01)The remote and sparsely populated provinces of Papua and West Papua face a time of great change. Monetary transfers from Jakarta have grown extraordinarily in recent years, by more than 600 percent in real terms and 1300 percent in nominal terms since 2000, greatly increasing demand for goods and services. The high price of imports in the interior is producing pressure to improve roads in order to lower transport costs. Pressure is mounting to open up the interior of the region to commercial interests that would like to extract resources: copper, gold, coal, petroleum, natural gas, and, above all, timber. Investment in infrastructure, especially in road transport, is seen as the means to make dreams of development a reality. Building infrastructure in Papua and West Papua also is challenging because of physical (i.e. topographical and geological) conditions. Much of the region has either poorly drained peat soils or steep slopes with thin soils subject to landslides and erosion. Most of Papua and West Papua also receive heavy seasonal rainfall. The cost of building a good, well-planned road into the highlands is Indonesian Rupiah (IDR) 6 to 10 billion per kilometer, far more than has been budgeted in the past. Combined with the low population density (a region three times the size of Java has a population smaller than that of Lombok), this means that it takes bigger networks of roads and power to serve the population. Moreover, such infrastructure has been inadequately maintained. As a result, especially outside urban areas, there is too little to show for past investments in roads, water supply systems, or power generating capacity. The aim of this report is: (i) to lay out the challenges that faces infrastructure planners and implementers in the central, provincial, and Kabupaten and Kota governments in a clear manner; and (ii) provide those planners and implementers with recommendations, based on the best information available, on how to mitigate the effects of these challenges.Publication Zambia Growth, Infrastructure, and Investments : Role for Public Private Partnership(Washington, DC, 2008-06-26)The main purpose of this paper is to document and discuss infrastructure gaps, investment needs, and policy challenges in improving infrastructure services, with an emphasis on the role of Public Private Partnerships to access needed resources for investments in the various sub-sectors for accelerated growth and poverty reduction in Zambia. Zambia has made substantial progress in extending some infrastructure services, including telecom and roads, to its citizens. However, service delivery in other areas, such as water and sanitation, and electricity has been poor. With Zambia's annual growth increasing and demand for infrastructure services escalating, infrastructure bottlenecks are becoming more acute. This paper is targeted at two main audiences: the first is the broader universe of policymakers, planners, regulators, and technical specialists directly concerned with the delivery of infrastructure services. For these readers, the note provides an overview of the physical, financial, social, and institutional conditions of the country that cut across subsectors. It compares Zambia's infrastructure performance in terms of access rates, affordability, quality, and financial viability of its services to those observed in comparable countries. The second and related audience is the authorities. The note provides them with a sense of the foregone growth opportunities stemming from policy imperfections, an assessment of investment needs for accelerated growth, and how public private partnership can play a role in resource mobilization for the investment needs. The paper takes stock of the most relevant infrastructure issues in the key sectors: energy, water and sanitation and telecommunications.
Users also downloaded
Showing related downloaded files
Publication The Container Port Performance Index 2023(Washington, DC: World Bank, 2024-07-18)The Container Port Performance Index (CPPI) measures the time container ships spend in port, making it an important point of reference for stakeholders in the global economy. These stakeholders include port authorities and operators, national governments, supranational organizations, development agencies, and other public and private players in trade and logistics. The index highlights where vessel time in container ports could be improved. Streamlining these processes would benefit all parties involved, including shipping lines, national governments, and consumers. This fourth edition of the CPPI relies on data from 405 container ports with at least 24 container ship port calls in the calendar year 2023. As in earlier editions of the CPPI, the ranking employs two different methodological approaches: an administrative (technical) approach and a statistical approach (using matrix factorization). Combining these two approaches ensures that the overall ranking of container ports reflects actual port performance as closely as possible while also being statistically robust. The CPPI methodology assesses the sequential steps of a container ship port call. ‘Total port hours’ refers to the total time elapsed from the moment a ship arrives at the port until the vessel leaves the berth after completing its cargo operations. The CPPI uses time as an indicator because time is very important to shipping lines, ports, and the entire logistics chain. However, time, as captured by the CPPI, is not the only way to measure port efficiency, so it does not tell the entire story of a port’s performance. Factors that can influence the time vessels spend in ports can be location-specific and under the port’s control (endogenous) or external and beyond the control of the port (exogenous). The CPPI measures time spent in container ports, strictly based on quantitative data only, which do not reveal the underlying factors or root causes of extended port times. A detailed port-specific diagnostic would be required to assess the contribution of underlying factors to the time a vessel spends in port. A very low ranking or a significant change in ranking may warrant special attention, for which the World Bank generally recommends a detailed diagnostic.Publication Global Economic Prospects, June 2025(Washington, DC: World Bank, 2025-06-10)The global economy is facing another substantial headwind, emanating largely from an increase in trade tensions and heightened global policy uncertainty. For emerging market and developing economies (EMDEs), the ability to boost job creation and reduce extreme poverty has declined. Key downside risks include a further escalation of trade barriers and continued policy uncertainty. These challenges are exacerbated by subdued foreign direct investment into EMDEs. Global cooperation is needed to restore a more stable international trade environment and scale up support for vulnerable countries grappling with conflict, debt burdens, and climate change. Domestic policy action is also critical to contain inflation risks and strengthen fiscal resilience. To accelerate job creation and long-term growth, structural reforms must focus on raising institutional quality, attracting private investment, and strengthening human capital and labor markets. Countries in fragile and conflict situations face daunting development challenges that will require tailored domestic policy reforms and well-coordinated multilateral support.Publication Global Economic Prospects, January 2025(Washington, DC: World Bank, 2025-01-16)Global growth is expected to hold steady at 2.7 percent in 2025-26. However, the global economy appears to be settling at a low growth rate that will be insufficient to foster sustained economic development—with the possibility of further headwinds from heightened policy uncertainty and adverse trade policy shifts, geopolitical tensions, persistent inflation, and climate-related natural disasters. Against this backdrop, emerging market and developing economies are set to enter the second quarter of the twenty-first century with per capita incomes on a trajectory that implies substantially slower catch-up toward advanced-economy living standards than they previously experienced. Without course corrections, most low-income countries are unlikely to graduate to middle-income status by the middle of the century. Policy action at both global and national levels is needed to foster a more favorable external environment, enhance macroeconomic stability, reduce structural constraints, address the effects of climate change, and thus accelerate long-term growth and development.Publication Digital Progress and Trends Report 2023(Washington, DC: World Bank, 2024-03-05)Digitalization is the transformational opportunity of our time. The digital sector has become a powerhouse of innovation, economic growth, and job creation. Value added in the IT services sector grew at 8 percent annually during 2000–22, nearly twice as fast as the global economy. Employment growth in IT services reached 7 percent annually, six times higher than total employment growth. The diffusion and adoption of digital technologies are just as critical as their invention. Digital uptake has accelerated since the COVID-19 pandemic, with 1.5 billion new internet users added from 2018 to 2022. The share of firms investing in digital solutions around the world has more than doubled from 2020 to 2022. Low-income countries, vulnerable populations, and small firms, however, have been falling behind, while transformative digital innovations such as artificial intelligence (AI) have been accelerating in higher-income countries. Although more than 90 percent of the population in high-income countries was online in 2022, only one in four people in low-income countries used the internet, and the speed of their connection was typically only a small fraction of that in wealthier countries. As businesses in technologically advanced countries integrate generative AI into their products and services, less than half of the businesses in many low- and middle-income countries have an internet connection. The growing digital divide is exacerbating the poverty and productivity gaps between richer and poorer economies. The Digital Progress and Trends Report series will track global digitalization progress and highlight policy trends, debates, and implications for low- and middle-income countries. The series adds to the global efforts to study the progress and trends of digitalization in two main ways: · By compiling, curating, and analyzing data from diverse sources to present a comprehensive picture of digitalization in low- and middle-income countries, including in-depth analyses on understudied topics. · By developing insights on policy opportunities, challenges, and debates and reflecting the perspectives of various stakeholders and the World Bank’s operational experiences. This report, the first in the series, aims to inform evidence-based policy making and motivate action among internal and external audiences and stakeholders. The report will bring global attention to high-performing countries that have valuable experience to share as well as to areas where efforts will need to be redoubled.Publication Business Ready 2024(Washington, DC: World Bank, 2024-10-03)Business Ready (B-READY) is a new World Bank Group corporate flagship report that evaluates the business and investment climate worldwide. It replaces and improves upon the Doing Business project. B-READY provides a comprehensive data set and description of the factors that strengthen the private sector, not only by advancing the interests of individual firms but also by elevating the interests of workers, consumers, potential new enterprises, and the natural environment. This 2024 report introduces a new analytical framework that benchmarks economies based on three pillars: Regulatory Framework, Public Services, and Operational Efficiency. The analysis centers on 10 topics essential for private sector development that correspond to various stages of the life cycle of a firm. The report also offers insights into three cross-cutting themes that are relevant for modern economies: digital adoption, environmental sustainability, and gender. B-READY draws on a robust data collection process that includes specially tailored expert questionnaires and firm-level surveys. The 2024 report, which covers 50 economies, serves as the first in a series that will expand in geographical coverage and refine its methodology over time, supporting reform advocacy, policy guidance, and further analysis and research.