Publication:
Libya -- Managing Public Investment After the Revolution: Background, Activities, Results and Proposals

Loading...
Thumbnail Image
Files in English
English PDF (2.32 MB)
389 downloads
English Text (215.42 KB)
44 downloads
Date
2014-06-30
ISSN
Published
2014-06-30
Author(s)
Schiavo-Campo, Salvatore
Ashur, Wesal Ezeddin
Tommasi, Daniel
Editor(s)
Abstract
This report is intended to provide in one single document the background, principal recent and current World Bank activities and the proposed program of technical assistance to the Government in the area of public investment programming and management in post-revolution Libya. Aside from the convenience, both for the Bank and other international partners, of a synthesis of all major assessments and advice provided by the Bank in this central area of public sector management, this report shows the substantial continuity of diagnosis and assistance from the immediate aftermath of the Revolution through mid-2014. The first section recounts the early activities and, against that background, the second section summarizes the activities conducted and initial results achieved during FY2014. The concluding section lists the preliminary agreements with the Government on how to build on those initial results with complementary activities and deepening of a number of initiatives, specifically during FY2015 and with general indications for the subsequent years. The text of the report is limited to a summary of key issues and recommendations, with full details provided in the several annexes.
Link to Data Set
Citation
Schiavo-Campo, Salvatore; Ashur, Wesal Ezeddin; Tommasi, Daniel; Schaeffer, Michael G.. 2014. Libya -- Managing Public Investment After the Revolution: Background, Activities, Results and Proposals. © World Bank. http://hdl.handle.net/10986/24462 License: CC BY 3.0 IGO.
Associated URLs
Associated content
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue

Related items

Showing items related by metadata.

  • Publication
    Assessing and Reforming Public Financial Management : A New Approach
    (Washington, DC: World Bank, 2004) Allen, Richard; Schiavo-Campo, Salvatore; Columkill Garrity, Thomas
    This study is intended to help underpin a more coordinated, effective approach to assessing and reforming systems for public expenditure, procurement, and financial accountability in developing countries-especially countries that receive international aid for budget support. Such support, also known as adjustment lending, has become far more important in recent years. At the World Bank, for example, it increased from less than 10 percent of total assistance in the 1980s to about 50 percent in fiscal 2002. Many other development agencies are also increasing aid for budget support. This support has been accompanied by and reflects widespread recognition that aid is fungible and that resources can be transferred, so that aid intended for one project can effectively be used to finance another. Thus, efforts to safeguard the integrity of donor resources mean little without safeguards on the use of government resources. Moreover, growing awareness of the destructive effects of corruption -- emphatically underscored by the East Asian financial crisis of 1997-99 -- has given new urgency to donors' need to ensure that aid is not diverted to private ends or misallocated to activities not conducive to fostering growth and reducing poverty. For all these reasons it is important for donors and recipient governments alike that the strengths and weaknesses of national budget systems be well understood and that governments implement reforms where needed, especially in high-risk areas.
  • Publication
    Zimbabwe Public Investment Management Efficiency Review
    (World Bank, Washington, DC, 2012-06-26) World Bank
    The Public Investment Management (PIM) efficiency review is intended to support the Government of Zimbabwe, and in particular the Ministry of Finance, in its efforts to strengthen the efficiency of the public investment system, with the goal of improving the creation, operation and maintenance of public sector capital assets that support service delivery and economic growth. The problems of public investment management are not merely financial but systemic. Budget execution deficit remains a major bottleneck. Due to large backlogs across sectors, capital budget allocation has prioritized completion and rehabilitation of on-going and stalled projects and programs. Currently, public investment projects are mainly financed by the national budget. Regulatory frameworks for public-private partnerships are in place, but sluggish recovery from the private sector has not made it a notable source of financing for capital projects. Foreign loans and grants, and humanitarian aid from donors are not channeled through the official budget. This report is intended to provide the basis for a follow-on discussion with government on possible options and approaches to addressing the identified problems, focusing on those which are the most critical to Zimbabwe's economic recovery and long term development. It is complementary to the action plan, also developed by the team for consideration by the Government of Zimbabwe, which suggests a list of reform actions over the immediate to medium-term to strengthen the regulatory framework and build capacity across central and implementing agencies. The objective of the policy note is to support the Government of Zimbabwe to strengthen the efficiency of PIM system, with an ultimate goal of contributing to improved governance, service delivery, and economic growth. The study will inform a reform and capacity strengthening action plan with the Government as well as subsequent Bank's proposed technical assistance program to strengthen the PIM.
  • Publication
    Timor-Leste : Public Investment Management from Post-Conflict Reconstruction to the 2011-2020 Strategic Development Plan
    (World Bank, Washington, DC, 2011-01) Rab, Habib; Petrie, Murray
    This chapter captures some of the Public Investment Management (PIM) lessons and experiences from Timor-Leste as it tried to meet urgent infrastructure demands in a post-conflict environment, which benefited from a surge in petroleum receipts. It looks at institutional changes using standard features of Public Investment Management systems starting from the immediate post-independence period in 1999 right up to the launch of Timor-Leste s Strategic Development Plan in July 2011. Increased control over domestic resources over this period, thanks to the onset of natural resource rents, gave the government more autonomy over prioritization and management of capital expenditure. It also enabled use of the Capital Budget to pursue multiple objectives including consolidating social stability, stimulating economic activity outside Dili, delivering quick results to address urgent infrastructure needs, and growth of the domestic private sector. The chapter tries to highlight some of the trade-offs that the PIM system faced in trying to meet these different objectives. It finally looks at some of the institutional reforms that the government embarked on in 2011 when the focus was shifting to large investments for long-term growth. This included centralizing selected PIM functions for large projects and decentralizing those functions for smaller projects.
  • Publication
    Capacity Constraints and Public Financial Management in Small Pacific Island Countries
    (World Bank, Washington, DC, 2012-12) Haque, Tobias A.; Knight, David S.; Jayasuriya, Dinuk S.
    Drawing on Public Expenditure and Financial Accountability assessment scores from 118 countries, this paper provides the first comparative analysis of public financial management performance in small Pacific Island Countries (PICs). It applies a Tobit regression model across the full cross-country sample of Public Expenditure and Financial Accountability scores and country variables to identify potential causes for the observed underperformance of Pacific Island countries relative to other countries of similar income. First, the analysis finds small population size to be negatively correlated with Public Expenditure and Financial Accountability scores, with the "population penalty" faced by small Pacific Island countries sufficient to explain observed underperformance. Second, through application of a new capacity index of Public Expenditure and Financial Accountability dimensions, it finds strong evidence in support of the hypothesis that small population size impacts scores through the imposition of capacity constraints: with a limited pool of human capital, small countries face severe and permanent challenges in accessing an adequate range and depth of technical skills to fulfill all functions assessed through the Public Expenditure and Financial Accountability framework. These findings suggest that approaches to strengthening public financial management in small Pacific Island countries should involve: i) careful prioritization of public financial management capacity toward areas that represent binding constraints to development; ii) adoption of public financial management systems that can function within inherent and binding capacity constraints, rather than wholesale adoption of "best practice" imported systems; and iii) consideration of options for accessing external capacity to support public financial management systems on a long-term basis, from regional agencies, the private sector, or donors.
  • Publication
    Kyrgyz Republic Public Expenditure Review Policy Notes : Public Investment Management
    (Washington, DC, 2014-05) World Bank
    Weaknesses in the public investment management (PIM) system may limit the gains from higher public sector investments in the Kyrgyz Republic. Capital spending has averaged 6.4 percent of GDP since 2010, up from 4.6 percent of GDP between 2005 and 2009, with significant investment in the energy sector and roads. Still, it remains unclear to what extent these investment decisions reflect the country's and sector priorities. Few projects, with the exception of donor-financed projects are subject to rigorous appraisal and there is no systematic procedure in place to monitor implementation progress. As a result, projects are often delayed or stalled and cost over-runs are frequent. Donor-financed projects, which comprise the bulk of public investment, are subject to relatively more rigorous project cycle management; however, they too face some of the same weaknesses. The rest of the note is structured as follows: section two provides a diagnosis of the public investment portfolio, including the structure of expenditures, the quality of the data, and a quantitative assessment of the efficacy and effectiveness of the public investment portfolio. The assessment builds on previous work on public investment in the Kyrgyz Republic, in particular the Public Investment Diagnostic undertaken in 2012 under the Capacity Building in Economic Management (CBEM) project. Section three reviews the institutional and administrative framework of PIM in Kyrgyz Republic. This draws largely from the draft Investment Diagnostic Report prepared in December 2012 using the eight key 'must-have' features of a well-functioning public investments framework proposed in Rajaram et.al. (2011). Finally, section four includes a summary of the findings and detailed recommendations on improving PIM.

Users also downloaded

Showing related downloaded files

  • Publication
    Argentina Country Climate and Development Report
    (World Bank, Washington, DC, 2022-11) World Bank Group
    The Argentina Country Climate and Development Report (CCDR) explores opportunities and identifies trade-offs for aligning Argentina’s growth and poverty reduction policies with its commitments on, and its ability to withstand, climate change. It assesses how the country can: reduce its vulnerability to climate shocks through targeted public and private investments and adequation of social protection. The report also shows how Argentina can seize the benefits of a global decarbonization path to sustain a more robust economic growth through further development of Argentina’s potential for renewable energy, energy efficiency actions, the lithium value chain, as well as climate-smart agriculture (and land use) options. Given Argentina’s context, this CCDR focuses on win-win policies and investments, which have large co-benefits or can contribute to raising the country’s growth while helping to adapt the economy, also considering how human capital actions can accompany a just transition.
  • Publication
    Lebanon Economic Monitor, Fall 2022
    (Washington, DC, 2022-11) World Bank
    The economy continues to contract, albeit at a somewhat slower pace. Public finances improved in 2021, but only because spending collapsed faster than revenue generation. Testament to the continued atrophy of Lebanon’s economy, the Lebanese Pound continues to depreciate sharply. The sharp deterioration in the currency continues to drive surging inflation, in triple digits since July 2020, impacting the poor and vulnerable the most. An unprecedented institutional vacuum will likely further delay any agreement on crisis resolution and much needed reforms; this includes prior actions as part of the April 2022 International Monetary Fund (IMF) staff-level agreement (SLA). Divergent views among key stakeholders on how to distribute the financial losses remains the main bottleneck for reaching an agreement on a comprehensive reform agenda. Lebanon needs to urgently adopt a domestic, equitable, and comprehensive solution that is predicated on: (i) addressing upfront the balance sheet impairments, (ii) restoring liquidity, and (iii) adhering to sound global practices of bail-in solutions based on a hierarchy of creditors (starting with banks’ shareholders) that protects small depositors.
  • Publication
    Classroom Assessment to Support Foundational Literacy
    (Washington, DC: World Bank, 2025-03-21) Luna-Bazaldua, Diego; Levin, Victoria; Liberman, Julia; Gala, Priyal Mukesh
    This document focuses primarily on how classroom assessment activities can measure students’ literacy skills as they progress along a learning trajectory towards reading fluently and with comprehension by the end of primary school grades. The document addresses considerations regarding the design and implementation of early grade reading classroom assessment, provides examples of assessment activities from a variety of countries and contexts, and discusses the importance of incorporating classroom assessment practices into teacher training and professional development opportunities for teachers. The structure of the document is as follows. The first section presents definitions and addresses basic questions on classroom assessment. Section 2 covers the intersection between assessment and early grade reading by discussing how learning assessment can measure early grade reading skills following the reading learning trajectory. Section 3 compares some of the most common early grade literacy assessment tools with respect to the early grade reading skills and developmental phases. Section 4 of the document addresses teacher training considerations in developing, scoring, and using early grade reading assessment. Additional issues in assessing reading skills in the classroom and using assessment results to improve teaching and learning are reviewed in section 5. Throughout the document, country cases are presented to demonstrate how assessment activities can be implemented in the classroom in different contexts.
  • Publication
    World Development Report 2006
    (Washington, DC, 2005) World Bank
    This year’s Word Development Report (WDR), the twenty-eighth, looks at the role of equity in the development process. It defines equity in terms of two basic principles. The first is equal opportunities: that a person’s chances in life should be determined by his or her talents and efforts, rather than by pre-determined circumstances such as race, gender, social or family background. The second principle is the avoidance of extreme deprivation in outcomes, particularly in health, education and consumption levels. This principle thus includes the objective of poverty reduction. The report’s main message is that, in the long run, the pursuit of equity and the pursuit of economic prosperity are complementary. In addition to detailed chapters exploring these and related issues, the Report contains selected data from the World Development Indicators 2005‹an appendix of economic and social data for over 200 countries. This Report offers practical insights for policymakers, executives, scholars, and all those with an interest in economic development.
  • Publication
    Dominican Republic Poverty Assessment 2023
    (Washington, DC: World Bank, 2023-11-08) World Bank
    In recent decades, economic growth in the Dominican Republic (DR) has been steady. However, growth has not occurred in such a way as to make the benefits widely and evenly available. In fact, although the DR economy grew faster than that of other LAC countries before the Covid-19 pandemic, its poverty rates and social outcomes remain broadly similar to them. This report seeks to explain this conundrum, as well as to expand the knowledge base to improve the effectiveness of ongoing poverty reduction policies in the DR. The Poverty Assessment draws primarily on new analytical work conducted in the DR, structured around four background notes on: (i) trends in monetary poverty and inequality, as well as the key drivers of those changes; (ii) nonmonetary poverty and its spatial dimensions; (iii) social assistance programs and their role in mitigating poverty; and (iv) climate change and its interaction with poverty. By helping to reduce the evidence gap in each of these areas, our analysis hopes to inform government policies and the national dialogue on poverty reduction. In addition, the note integrates existing analytical work and evidence produced inside and outside the Bank, including from its operations in the country.