Publication: Building Capacity : Experiences from Post-Disaster Aceh and Nias

Thumbnail Image
Files in English
English PDF (2.85 MB)
380 downloads

English Text (198.82 KB)
121 downloads
Date
2012-12
ISSN
Published
2012-12
Author(s)
MDF-JRF Secretariat
Abstract
The Multi Donor Fund for Aceh and Nias (MDF) and the Java Reconstruction Fund (JRF) have played significant roles in the remarkable recovery of Aceh, Nias and Java, following some of the worst disasters in Indonesia in recent years. The MDF and the JRF, which is patterned after it, are each considered a highly successful model for post-disaster reconstruction. This paper discusses the value of a phased approach to post-disaster reconstruction as a successful means to manage short-term expectations while delivering long-lasting, results of high quality. The natural disasters of late 2004 and early 2005 left a trail of human loss and destruction in Aceh and Nias. In such a scenario, capacity building efforts related to individual and community level investments yielded large returns. Aceh and Nias have emerged from the reconstruction experience in a better position to address these challenges as a result of the capacity building achieved through the recovery process.
Citation
MDF-JRF Secretariat. 2012. Building Capacity : Experiences from Post-Disaster Aceh and Nias. MDF-JRF working paper series;no. 2. © World Bank, Jakarta. http://openknowledge.worldbank.org/handle/10986/17635 License: CC BY 3.0 IGO.
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Citations