Publication:
Attitudinal and Socio-Demographic Effects on Willingness to Pay for Water Services and Actual Payment Behaviour

No Thumbnail Available
Date
2010
ISSN
1573-062X
Published
2010
Editor(s)
Abstract
Improving revenue collection rates and minimising the levels of 'bad debts' is currently a top priority for managers of water utilities in low-income countries. This study used empirical data from a cross-sectional survey of 505 utility customers in eight urban centres in Uganda to show that customer attitude towards prompt payment, perceived ease or difficulty of paying on time (perceived control), as well as social pressure, strongly influence intentions to pay, which in turn directly affects actual prompt bill payment behaviour. The findings also show that gender, income, occupation of the household head and tenure status have statistically significant direct relationships with intentions, but their effects are much smaller compared to the joint influence of attitudes, perceived control and perceived social pressure. Moreover, the effects of gender and occupation are completely mediated by perceived control and social pressure respectively. These results have implications for improving revenue collection through customer-focused initiatives.
Link to Data Set
Associated URLs
Associated content
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Citations

Related items

Showing items related by metadata.

  • Publication
    Determinants of Customer Decisions to Pay Utility Water Bills Promptly
    (2010) Mugabi, J.; Kayaga, S.; Smout, I.; Njiru, C.
    Cost recovery is a prerequisite for sustainable water service provision. For water utilities, one of the key determinants of overall cost recovery efficiency is the ability to recover payment, within a reasonable timeframe, for all the water bills sent to customers. This study used empirical data, obtained through a cross-sectional survey in eight small urban centres in Uganda, to establish the determinants of customer decisions to pay utility water bills promptly. Regression analysis on the data showed that customer attitude towards prompt payment, perceived ease or difficulty of paying on time (perceived control), as well as social pressure, strongly influence intentions to pay, which in turn directly affects actual prompt bill payment behaviour. The results also show that attitudes towards prompt payment are informed by perceptions of benefits and sacrifices associated with the behaviour, while social pressure is perceived to come from family members, neighbours and the utility itself. Perceived control was found to reflect both internal and external impediments to prompt bill payment, many of which relate to service issues that are within the control of water utility managers.
  • Publication
    Evaluating the Institutional Sustainability of an Urban Water Utility : A Conceptual Framework and Research Directions
    (Elsevier, 2013-12) Kayaga, Sam; Mugabi, Josses; Kingdom, William
    Institutional sustainability (IS) is critical to translating infrastructure investments into actual service delivery. This paper examines IS for urban water utilities, and how its progress could be tracked. Common conceptualisations of IS in extant literature were found inadequate from an evaluation stand point. We conceptualize IS as a capacity rather than a financial issue, and, consistent with a process-based approach, we propose a new evaluation tool – the water utility maturity (WUM) model – which is flexible and considers different levels of IS. The WUM model, which requires further validation/verification, was piloted in two water utilities in South Asia with positive feedback.
  • Publication
    Better Use of Capital to Deliver Sustainable Water Supply and Sanitation Services
    (World Bank, Washington, DC, 2018-11) Kingdom, Bill; Lloyd-Owen, David; Tremolet, Sophie; Kayaga, Sam; Ikeda, John
    The costs of meeting the SDG WASH targets will be several times higher than investment levels during the MDG era (2000–15). The immense scale of the financing gap calls for innovative solutions. In addition to mobilizing more funding another approach is to deliver the needed infrastructure more efficiently and effectively and thus reduce the financing gap. Capital expenditure efficiency (CEE)—the efficient and effective use of capital—is less documented compared to operational efficiency. Although improving operating efficiency is frequently highlighted and readily evaluated, the scope for capital cost efficiencies is poorly understood, frequently overlooked, and difficult to evaluate, even though the scale of savings can be significant—in fact, capital and operating costs are equally important when considering full cost recovery. This study compiles case studies that show the "art of the possible" in CEE. The report is not encyclopedic—many more examples could surface from a comprehensive study. It also doesn’t quantify the savings possible through increasing CEE. However, almost all the examples show capital savings of 25 percent or more compared to traditional solutions. This alone this should give policy makers, donors, and utility managers pause for thought and encourage them to develop CEE in their sectors, projects, or utilities. A 25 percent improvement in CEE would allow existing investments to deliver a 33 percent increase in benefits.
  • Publication
    Improving Water Services in a Post-Conflict Situation : The Case of the Management Contract in Kosovo
    (World Bank, Washington, DC, 2010-03) Marin, Philippe; Mugabi, Josses; Mariño, Manuel
    Countries emerging from a devastating conflict need to rapidly restore access to basic water and sanitation services for their population. While donors usually stand ready with generous reconstruction packages, the conflict may have left local institutions ill equipped to make good use of those resources. The traditional solution, involving technical assistance delivered by international consultants, has often proved disappointing. An alternative is to bring in a professional operator for a few years through a management contract. In postwar Kosovo the sizable improvements achieved under a three year management contract for water services in the Gjakove-Rahovec area suggest that it can be a promising approach for post-conflict situations.
  • Publication
    Evaluation of Water Services Public Private Partnership Options for Mid-sized Cities in India
    (World Bank, Washington, DC, 2015-06) Ehrhardt, David; Gandhi, Riddhima; Mugabi, Josses; Kingdom, William
    Successful mid-sized cities will be vital to India’s growth and prosperity in the coming decades. Indian cities are home to over 375 million people now, and their population is likely to double by 2035. Yet water supply in most mid-sized cities falls short of Government of India benchmarks for service, efficiency and cost recovery. In many of them water flows in the pipes for 2 hours a day or less, its quality is poor, and it is provided by utilities that cannot even cover their operating costs. Following a brief introduction to the three city case studies (section two), the report lays out the Indian water sector’s unique challenges, and using case examples to substantiate findings (section three). The challenges include day-to-day operational issues associated with running a utility, as well as policy and planning issues that affect the utility’s governance and investment planning to meet current and future demand. The results of a financial viability gap analysis, applied to Bhubaneswar and Coimbatore reveal the magnitude of improvements required, and the key drivers that affect the utilities’ financial performance (section four). These complex challenges make traditional PPP models, Management Contracts, Concessions and Leases, less amenable for use in mid-size Indian cities. As section five describes, this is because the traditional models are too risky for the operator or government or too limited in scope to create lasting improvements. The remaining sections focus on explaining the design and procurement strategy for the two innovative PPP models, the phased performance based contract and the Joint Venture (JV) Partnership (section six and seven). These models have the potential to deliver better results than the traditional PPPs and business as usual scenarios. This is because in addition to reforming dysfunctional utilities into focused and accountable organizations, they are able to respond to information uncertainty, include strong incentives, have clear sources of funding, and promote capital efficiency.

Users also downloaded

Showing related downloaded files

No results found.