Publication:
Public Procurement Reform in Morocco

Loading...
Thumbnail Image
Files in English
English PDF (772.38 KB)
2,019 downloads
English Text (19.91 KB)
60 downloads
Date
2014-03
ISSN
Published
2014-03
Editor(s)
Abstract
Over the last decade Morocco has made important strides in responding to citizen demands for more transparency, accountability, and shared prosperity. This has also extended into the public sector and its varied functions. In Morocco public contracts account for some 17 percent of GDP and are responsible for critical activities in the economy, including delivery of key public services.2 Given its important role, the Government of Morocco (GoM) prioritized public procurement for comprehensive reforms. Starting with 2003 Country Procurement Assessment Report (CPAR) Morocco embarked on a productive dialogue with the World Bank to improve its procurement system and optimize the performance of its public investments.
Link to Data Set
Citation
Lipson, Rachel; Benouniche, Salim; Keita, Abdoulaye; Faridi, Khadija. 2014. Public Procurement Reform in Morocco. MENA knowledge and learning quick notes series;no. 117. © http://hdl.handle.net/10986/20553 License: CC BY 3.0 IGO.
Associated URLs
Associated content
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue

Related items

Showing items related by metadata.

  • Publication
    Pakistan, Sindh Province - Baseline Indicators System : Baseline Procurement Performance Assessment Report
    (World Bank, 2009-09-18) World Bank
    This document provides an assessment of the public procurement system in Sindh province using the baseline indicators system developed by the Development Assistance Committee of the Organization for Economic Cooperation and Development (OECD-DAC). This assessment, interviews and discussions were held with stakeholders from the public and private sectors as well as civil society. Developing country governments and donors have a mutual interest in increasing the effectiveness, efficiency, and transparency of procurement systems. Both have worked together under the auspices of the World Bank and OECD-DAC procurement round table initiative to develop a set of tools and standards to support and guide improvements in procurement systems. These tools include: (i) benchmarking for assessing the structure of public procurement systems, and (ii) monitoring and evaluation of public procurement systems. A key analytical tool developed for benchmarking is the baseline indicators system which comprises four pillars: 1) the legislative and regulatory framework; 2) institutional framework and management capacity; 3) procurement operations and market practices; and 4) integrity and transparency of the public procurement system.
  • Publication
    Ghana - 2007 External Review of Public Financial Management : Volume 2. Public Procurement Assessment Report
    (Washington, DC, 2008-06) World Bank
    The 2007 External Review of Public Financial Management (ERPFM) is the fourth in a series of annual assessments by the development agencies that contribute to the Multi-Donor budgetary support in Ghana. The 2007 ERPFM review has four main findings: 1) the progress in strengthening the Public Financial Management (PFM) system has been commendable. 2) In order to address the drivers of additional public spending in 2006 and 2007 as well as increase the effectiveness of public investment, attention now should focus on high return actions, such as: (i) completing the implementation of the Integrated Personnel and Payroll Database (IPDD2) and other measures aimed at reasserting control over the wage bill; (ii) ensuring continued reduction in energy subsidies through alignment of tariffs with current market conditions, including the international oil market prices; and (iii) the building of capacity to prepare, appraise and implement large infrastructure projects, especially now that the Government is preparing for a major infrastructure investment drive. 3) A strong foundation has been laid for open, competitive and transparent public procurement and a major effort is underway with a view to building understanding of the new system and capacity to manage it. 4) The successful launch of the Ghanaian Eurobond provides the opportunity to reduce the Government's exposure to the domestic bond market, and restore the virtuous cycle of lower public sector indebtedness that was initiated in 2003 with reduction in domestic debt, declining inflation and domestic real interest rates, and rising public and private investment. The External Review of Public Financial Management (ERPFM) on these key findings, first, it covers recent economic performance and outlook and then reviews issues related to the pattern of public spending. After reporting on progress in strengthening public financial management, it summarizes findings of the public procurement assessment. The detailed findings of the public procurement assessment constitute volume two of the 2007 ERPFM. At the end the ERPFM proposes to focus on in the short and medium-term and the baseline scores of Ghana's public procurement system for each of the 54 sub-indicators covered by the Organization for Economic Co-operation and Development - Assistance Committee (OECD-DAC) methodology, respectively.
  • Publication
    Afghanistan - Electronic Government Procurement Readiness Assessment and Roadmap
    (Washington, DC, 2007-06) World Bank
    The overriding objective of a national public procurement system is to deliver efficiency and value for money in the use of public funds, while adhering to fundamental principles of non- discrimination, equal treatment, and transparency. Procurement is therefore at the core of the Public Finance Management (PFM) system and contributes greatly to several of its objectives, including efficiency, transparency, and accountability. In respect of public procurement, the 2005 review of Afghanistan's PFM system identified a weak legal framework, lack of ownership, lack of capacity and the lack of a monitoring mechanism as the key issues in the area of procurement. Since then, following the recommendations of the PFM review report, the country has made substantial progress in improving its public procurement environment. The purpose of this report is to provide a roadmap which sets out the incremental steps which may be taken to introduce Electronic Government Procurement (E-GP) tools according to the speed and development of the reform agenda. The report will be disseminated to the stakeholders through a workshop, planned for July 2007. The workshop will discuss the challenges in implementation of an e-GP strategy both in terms of its components as well as the transition path to implementation.
  • Publication
    The World Bank Group and Public Procurement--An Independent Evaluation : Appendixes to Volume 2
    (Washington, DC: World Bank, 2014) Independent Evaluation Group
    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential element of the poverty reduction focus of the Bank. Good procurement in Bank projects is also associated with better development outcomes. Equally, sound public procurement in client countries is a prerequisite for the success of the Bank's newly introduced program for results lending instrument. The Bank seeks to ensure that its funds are used for the purpose intended and that they support development effectively and efficiently. Thus, the twin issues that underpin this Independent Evaluation Group (IEG) evaluation are first, how effectively has the World Bank helped build well-functioning public procurement systems in client countries and second, how well have Bank procurement policies and procedures for its investment lending supported the development effectiveness of Bank lending? The evaluation parallels an intensive review by Bank management of the institution's procurement function, motivated by the need to respond to a range of internal and external changes in the Bank's procurement environment. Several evaluations point to the value of coordination between procurement and public expenditure reforms, but also to the difficulties of realizing such coordination. Finally, there are queries related to the adaptability of current Bank procurement guidelines to new contexts, such as public-private partnerships (PPPs); technology loans; and small, fragile, or conflict-affected states. These questions have also contributed to the evaluation's design and coverage.
  • Publication
    NWFP Province Pakistan : Procurement Systems Performance Assessment
    (Washington, DC, 2007-05) World Bank
    The North West Frontier Province (NWFP) is the third largest province of Pakistan. The developing countries and bilateral and multilateral donors having a concern for increasing the effectiveness, efficiency and transparency of procurement systems, under the auspices of the joint World Bank and OECD Development Assistance Committee (DAC) Procurement Round Table initiative, worked together to develop a set of tools and standards that provide guidance for improvements in procurement systems and the results they produce. Among these tools are included: (i) Benchmarking for the assessment of the structure of the public procurement systems; and (ii) Monitoring and Evaluation of the public procurement systems. With regard to the first deliverable a tool comprising a set of baseline indicators for the assessment of a country system has been developed. This tool comprising four pillars explained through twelve (12) indicators.

Users also downloaded

Showing related downloaded files

  • Publication
    The Journey Ahead
    (Washington, DC: World Bank, 2024-10-31) Bossavie, Laurent; Garrote Sánchez, Daniel; Makovec, Mattia
    The Journey Ahead: Supporting Successful Migration in Europe and Central Asia provides an in-depth analysis of international migration in Europe and Central Asia (ECA) and the implications for policy making. By identifying challenges and opportunities associated with migration in the region, it aims to inform a more nuanced, evidencebased debate on the costs and benefits of cross-border mobility. Using data-driven insights and new analysis, the report shows that migration has been an engine of prosperity and has helped address some of ECA’s demographic and socioeconomic disparities. Yet, migration’s full economic potential remains untapped. The report identifies multiple barriers keeping migration from achieving its full potential. Crucially, it argues that policies in both origin and destination countries can help maximize the development impacts of migration and effectively manage the economic, social, and political costs. Drawing from a wide range of literature, country experiences, and novel analysis, The Journey Ahead presents actionable policy options to enhance the benefits of migration for destination and origin countries and migrants themselves. Some measures can be taken unilaterally by countries, whereas others require close bilateral or regional coordination. The recommendations are tailored to different types of migration— forced displacement as well as high-skilled and low-skilled economic migration—and from the perspectives of both sending and receiving countries. This report serves as a comprehensive resource for governments, development partners, and other stakeholders throughout Europe and Central Asia, where the richness and diversity of migration experiences provide valuable insights for policy makers in other regions of the world.
  • Publication
    Argentina Country Climate and Development Report
    (World Bank, Washington, DC, 2022-11) World Bank Group
    The Argentina Country Climate and Development Report (CCDR) explores opportunities and identifies trade-offs for aligning Argentina’s growth and poverty reduction policies with its commitments on, and its ability to withstand, climate change. It assesses how the country can: reduce its vulnerability to climate shocks through targeted public and private investments and adequation of social protection. The report also shows how Argentina can seize the benefits of a global decarbonization path to sustain a more robust economic growth through further development of Argentina’s potential for renewable energy, energy efficiency actions, the lithium value chain, as well as climate-smart agriculture (and land use) options. Given Argentina’s context, this CCDR focuses on win-win policies and investments, which have large co-benefits or can contribute to raising the country’s growth while helping to adapt the economy, also considering how human capital actions can accompany a just transition.
  • Publication
    World Development Report 2006
    (Washington, DC, 2005) World Bank
    This year’s Word Development Report (WDR), the twenty-eighth, looks at the role of equity in the development process. It defines equity in terms of two basic principles. The first is equal opportunities: that a person’s chances in life should be determined by his or her talents and efforts, rather than by pre-determined circumstances such as race, gender, social or family background. The second principle is the avoidance of extreme deprivation in outcomes, particularly in health, education and consumption levels. This principle thus includes the objective of poverty reduction. The report’s main message is that, in the long run, the pursuit of equity and the pursuit of economic prosperity are complementary. In addition to detailed chapters exploring these and related issues, the Report contains selected data from the World Development Indicators 2005‹an appendix of economic and social data for over 200 countries. This Report offers practical insights for policymakers, executives, scholars, and all those with an interest in economic development.
  • Publication
    Classroom Assessment to Support Foundational Literacy
    (Washington, DC: World Bank, 2025-03-21) Luna-Bazaldua, Diego; Levin, Victoria; Liberman, Julia; Gala, Priyal Mukesh
    This document focuses primarily on how classroom assessment activities can measure students’ literacy skills as they progress along a learning trajectory towards reading fluently and with comprehension by the end of primary school grades. The document addresses considerations regarding the design and implementation of early grade reading classroom assessment, provides examples of assessment activities from a variety of countries and contexts, and discusses the importance of incorporating classroom assessment practices into teacher training and professional development opportunities for teachers. The structure of the document is as follows. The first section presents definitions and addresses basic questions on classroom assessment. Section 2 covers the intersection between assessment and early grade reading by discussing how learning assessment can measure early grade reading skills following the reading learning trajectory. Section 3 compares some of the most common early grade literacy assessment tools with respect to the early grade reading skills and developmental phases. Section 4 of the document addresses teacher training considerations in developing, scoring, and using early grade reading assessment. Additional issues in assessing reading skills in the classroom and using assessment results to improve teaching and learning are reviewed in section 5. Throughout the document, country cases are presented to demonstrate how assessment activities can be implemented in the classroom in different contexts.
  • Publication
    Lebanon Economic Monitor, Fall 2022
    (Washington, DC, 2022-11) World Bank
    The economy continues to contract, albeit at a somewhat slower pace. Public finances improved in 2021, but only because spending collapsed faster than revenue generation. Testament to the continued atrophy of Lebanon’s economy, the Lebanese Pound continues to depreciate sharply. The sharp deterioration in the currency continues to drive surging inflation, in triple digits since July 2020, impacting the poor and vulnerable the most. An unprecedented institutional vacuum will likely further delay any agreement on crisis resolution and much needed reforms; this includes prior actions as part of the April 2022 International Monetary Fund (IMF) staff-level agreement (SLA). Divergent views among key stakeholders on how to distribute the financial losses remains the main bottleneck for reaching an agreement on a comprehensive reform agenda. Lebanon needs to urgently adopt a domestic, equitable, and comprehensive solution that is predicated on: (i) addressing upfront the balance sheet impairments, (ii) restoring liquidity, and (iii) adhering to sound global practices of bail-in solutions based on a hierarchy of creditors (starting with banks’ shareholders) that protects small depositors.