Publication:
Portfolio Risk Assessment Using Risk Index

Loading...
Thumbnail Image
Files in English
English PDF (1.59 MB)
1,287 downloads
English Text (64.8 KB)
82 downloads
Date
2021-04-22
ISSN
Published
2021-04-22
Author(s)
Abstract
This Technical Note provides detailed information on the Brazilian risk classification system using the RI approach and the Indian RI system for the initial risk screening of a large portfolio of existing dams. Annex A provides basic information about the RI approach used in Quebec, Canada, for its dam classification system. These RIs are used for prioritization of required remedial works and other safety requirements. It should be noted, however, that RI is also a basic tool for preliminary level risk analyses for portfolios of dams and initial screening of risky dams, which may need to be supplemented by more advanced methods, depending on the type and potential risk of the dams. Because RI largely relies on visual inspection of the dams’ conditions, some critical failure modes could be missed. underestimated, or overestimated. In the higher risk cases, or whenever deemed appropriate, more detailed risk analyses, such as potential failure mode analysis (PFMA), can fill some of the gaps.
Link to Data Set
Citation
World Bank. 2021. Portfolio Risk Assessment Using Risk Index. Good Practice Note on Dam Safety;Technical Note 6. © World Bank, Washington, DC. http://hdl.handle.net/10986/35490 License: CC BY 3.0 IGO.
Report Series
Other publications in this report series
Journal
Journal Volume
Journal Issue
Associated URLs
Citations