Publication: Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project: Project Performance Assessment Report
Loading...
Date
2022-07-05
ISSN
Published
2022-07-05
Author(s)
Editor(s)
Abstract
Ratings for the Integrated Irrigation Improvement and Management Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, Bank performance was moderately satisfactory, and Borrow performance was moderately satisfactory. Ratings for the Farm-Level Irrigation Modernization Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, and Bank performance was moderately satisfactory. This assessment offers the following lessons: (i) In irrigation systems, such as the Nile Delta’s, that are organized along a hierarchical canal network, irrigation improvement efforts can realize greater impact by applying a systematic approach to rehabilitation, as was done through these two projects, as opposed to addressing different levels of the canal system in isolation. (ii) Efficient implementation of irrigation improvement works requires coordinating and sequencing activities that fall under the mandate of many different entities, which are often beyond the authority of the project implementing agency. (iii) Effecting behavior changes in on-farm water use, agronomic practices, and diversification to higher-value crops requires support beyond improvements to the irrigation water delivery system. (iv) Successfully reforming the institutions that manage irrigation and drainage services, both water users and government agencies, requires greater attention to incentives for collaboration. (v) In a context such as the Nile Delta, where overall efficiency of the irrigation system is already high, there is little scope for addressing water savings at the basin level through infrastructure improvement.
Link to Data Set
Citation
“World Bank. 2022. Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project: Project Performance Assessment Report. © World Bank. http://hdl.handle.net/10986/37906 License: CC BY 3.0 IGO.”
Associated URLs
Associated content
Other publications in this report series
Journal
Journal Volume
Journal Issue
Collections
Related items
Showing items related by metadata.
Publication Arab Republic of Egypt : Integrated Water Resources Management Plan(Washington, DC, 2005-06)The challenges facing the water sector in Egypt are enormous and require the mobilization of all resources and the management of these resources in an integrated manner. Changes in the way water resources are currently allocated and managed are inevitable. Accordingly, a National Water Resources Plan for Egypt (NWRP) was launched. The NWRP is a comprehensive document which describes how Egypt will safeguard its water resources in the future, both with respect to quantity and quality, and how it will use these resources in the best way from a socio-economic and environmental point of view. The NWRP needs to be augmented by a transitional strategy including further reform interventions which ensure smooth and enhanced streamlining with Integrated Water Resources Management principles and approaches. The current integrated water resources management plan (IWRM Plan) has been prepared to serve the later concerns and is intended to be a complementary, action-oriented, implementation framework to the NWRP. It addresses the gaps in NWRP and provides for additional measures and provisions which facilitate the transition towards an integrated management approach within the water sector. The IWRM Plan assesses the current water resources management setup and practices along with the ongoing reform efforts led by the MWRI. The Plan identifies the actions agreed upon as major interventions to pursue an effective integrated framework for water management over the next 15 years. Thirty Nine actions falling under 11 major categories are proposed: Institutional reform and strengthening; policies and legislations; physical interventions; capacity building; technological and information systems; water quality; economic and financial framework; research; raising awareness for IWRM; monitoring and evaluation; and trans-boundary cooperation.Publication How to Develop Sustainable Irrigation Projects with Private Sector Participation(World Bank, Washington, DC, 2016-02-01)This is a handbook designed to guide governments, public authorities and other interested stakeholders in the process of designing and tendering sustainable Public-Private Partnership (PPP) arrangements in the irrigation sector. It takes a practical, step-by-step approach in describing what a government needs to do in preparing and implementing a PPP irrigation scheme from inception. The handbook takes account of the various stages of the irrigation value chain and how to handle private sector participation in irrigation schemes of different sizes and types. It assumes that governments have already made the underlying policy decision to embark on a PPP in irrigation, and therefore does not dwell on the rationale for undertaking a PPP. The handbook’s practical aspects are contained in four, stand-alone chapters that follow an over-arching Executive Summary and an Introduction. The chapters are deliberately numbered to coincide with the four steps that a government should take in establishing an irrigation PPP: Preparation, Structuring, Procurement Management, and Implementation. In addition, each chapter concludes with a practical Checklist to help executives keep track of the necessary tasks in each step on the way to establishing a sustainable PPP operation. The chapters are designed to be read as stand-alone guides, out of an understanding that institutions using the book may already have completed prior steps. Nevertheless, it would be prudent for users to acquaint themselves with the entire handbook so as to develop a holistic view of the requirements for a full PPP project. Chapter One: Preparation is divided into two parts, A and B (each with its own concluding Checklist). Part A reviews the scope for introducing PPPs into the irrigation sector, identifying the issues that policymakers should consider from the outset in order to make the private sector’s involvement feasible with a specific irrigation project.Part B discusses the irrigation as a business. It contains a variety of case studies—the first time such studies have been documented—with discussion of lessons learned, PPP types, transfer of investment functions in developing countries, competitive bidding, and third party involvement among the subjects covered. Chapter Two: Structuring a PPP sets out the various tasks that must be completed to structure a sustainable PPP contract. Chapter Three: Managing Procurement examines how to select a private contractor, which involves such factors as the fiscal commitments to the PPP, to what extent the process should be competitive and how that might be conducted and managed, and what issues are peculiar to PPPs in irrigation.Chapter Four: Implementation highlights management of the contract and establishment of those management structures, monitoring, penalties and grantor’s rights, use of performance bonds, enforcement of customer payments, dealing with changes to the contract, and contract expiry and asset handover. The overall structure of the handbook is illustrated below. The handbook is supported by three annexes: Annex 1 explains how to use the Excel Options Assessment Tool, , and Annex 2 provides case studies of 29 existing or emerging irrigation PPPs.Publication Methodology for Ranking Irrigation Infrastructure Investment Projects(Washington, DC, 2010)The Government of Uzbekistan is aware that the irrigation and drainage infrastructure constructed under the Former Soviet Union - serving some 4.3 million hectare of cultivable land for agriculture as well as many villages for drinking water - is in urgent need of repair and/or rehabilitation. Also, given multiple competing demands of investment project proposals (as many as 180) on the nation's limited, annual investment budget earmarked for this purpose, it realized the need for a national strategy aimed at modernizing the water sector including a medium-term investment plan. It has thus asked the World Bank to undertake, over a two-year period beginning in mid-2007, a study that is designed to provide solutions to the twin problems of how to approach the rehabilitation of the irrigation and drainage sub-sector and which of the many competing projects to prioritize. To overcome this problem as well as the general lack of readily available, comparable data of proposals, the technical working group used the Investment project data sheet to gather relevant information from sub-basin authorities throughout the country with the instruction to fill in the required information. Initial progress with data collection proved extremely slow and cumbersome as the habit of looking at projects in an integrated manner, i.e. costs as well as benefits, had not been previously practiced in Uzbekistan. Given the foregoing, throughout the study period increasing emphasis was placed on formal as well as informal training in project preparation techniques of technical working group personnel and interested Ministry of Agriculture and Water Resources and Ministry of Economy personnel.Publication An Impact Evaluation of India's Second and Third Andhra Pradesh Irrigation Projects : A Case of Poverty Reduction with Low Economic Returns(Washington, DC : World Bank, 2008)Irrigation has made a major contribution to poverty reduction in the past decades, enabling higher yields and better nutrition. Despite these achievements, large-scale irrigation schemes have usually yielded low returns and attracted negative publicity because of their adverse environmental and social impacts. As a result, the Bank has largely switched its support for irrigation away from new construction toward rehabilitation and policy reform. This evaluation supports the need for reform but shows that there are substantial benefits from further investment in infrastructure. This study analyzes these issues through an impact evaluation of one of the last "old generation" of projects in which the Bank directly supported creation of a new irrigation scheme: India's Second and Third Andhra Pradesh Irrigation Projects (AP II and AP III). Together these projects created a new command area, the Srisailem Right Branch Canal (SRBC), and rehabilitated an existing one that had been constructed with Bank assistance, the Sriramasagar Project.Publication Emerging Public-Private Partnerships in Irrigation Development and Management(World Bank, Washington, DC, 2007-05)The objective of this paper is to identify the possible role and opportunities for the private sector to participate with governments and farmers in developing and managing irrigation and drainage (I&D) infrastructure. Over the last 50 years, irrigated agriculture has been vital to meeting fast-rising food demand and has been key to poverty reduction. In the coming years the strong demographic demand for food is expected to continue, and intensified irrigated agriculture will have to provide close to 60 percent of the extra food. However, in recent years, the pace of irrigation expansion has been slowing, there has been less improvement in productivity, and water availability for irrigation is increasingly constrained. Governments have long led the expansion of large-scale irrigation, but performance has been suboptimal, and reforms that have been introduced have proved slow to improve efficiency and water service. Faced with this challenge, the I&D sector has been wrestling with three deep-seated problems: low water use efficiency, a high reliance on government financing, and poor standards of management and maintenance. Much of the search for improved investment and institutional models in I&D has been driven by the need to resolve these three problems. One solution that has been tested over the last two decades has been Participatory Irrigation Management (PIM) involving water user associations (WUAs) in the financing and management of schemes. This solution had its logical culmination in irrigation management transfer, the handover of responsibility for scheme operation and maintenance (O&M) to farmers and their organizations. This solution promised to relieve governments of both the fiscal burden and the responsibility for asset management and maintenance and to improve efficiency by empowering farmers. PIM has made impressive strides. However, efficiency has risen only marginally, and there are many schemes where O&M is beyond farmers' capacity.
Users also downloaded
Showing related downloaded files
Publication Europe and Central Asia Economic Update, Fall 2024: Better Education for Stronger Growth(Washington, DC: World Bank, 2024-10-17)Economic growth in Europe and Central Asia (ECA) is likely to moderate from 3.5 percent in 2023 to 3.3 percent this year. This is significantly weaker than the 4.1 percent average growth in 2000-19. Growth this year is driven by expansionary fiscal policies and strong private consumption. External demand is less favorable because of weak economic expansion in major trading partners, like the European Union. Growth is likely to slow further in 2025, mostly because of the easing of expansion in the Russian Federation and Turkiye. This Europe and Central Asia Economic Update calls for a major overhaul of education systems across the region, particularly higher education, to unleash the talent needed to reinvigorate growth and boost convergence with high-income countries. Universities in the region suffer from poor management, outdated curricula, and inadequate funding and infrastructure. A mismatch between graduates' skills and the skills employers are seeking leads to wasted potential and contributes to the region's brain drain. Reversing the decline in the quality of education will require prioritizing improvements in teacher training, updated curricula, and investment in educational infrastructure. In higher education, reforms are needed to consolidate university systems, integrate them with research centers, and provide reskilling opportunities for adult workers.Publication Business Ready 2024(Washington, DC: World Bank, 2024-10-03)Business Ready (B-READY) is a new World Bank Group corporate flagship report that evaluates the business and investment climate worldwide. It replaces and improves upon the Doing Business project. B-READY provides a comprehensive data set and description of the factors that strengthen the private sector, not only by advancing the interests of individual firms but also by elevating the interests of workers, consumers, potential new enterprises, and the natural environment. This 2024 report introduces a new analytical framework that benchmarks economies based on three pillars: Regulatory Framework, Public Services, and Operational Efficiency. The analysis centers on 10 topics essential for private sector development that correspond to various stages of the life cycle of a firm. The report also offers insights into three cross-cutting themes that are relevant for modern economies: digital adoption, environmental sustainability, and gender. B-READY draws on a robust data collection process that includes specially tailored expert questionnaires and firm-level surveys. The 2024 report, which covers 50 economies, serves as the first in a series that will expand in geographical coverage and refine its methodology over time, supporting reform advocacy, policy guidance, and further analysis and research.Publication World Development Report 2011(World Bank, 2011)The 2011 World development report looks across disciplines and experiences drawn from around the world to offer some ideas and practical recommendations on how to move beyond conflict and fragility and secure development. The key messages are important for all countries-low, middle, and high income-as well as for regional and global institutions: first, institutional legitimacy is the key to stability. When state institutions do not adequately protect citizens, guard against corruption, or provide access to justice; when markets do not provide job opportunities; or when communities have lost social cohesion-the likelihood of violent conflict increases. Second, investing in citizen security, justice, and jobs is essential to reducing violence. But there are major structural gaps in our collective capabilities to support these areas. Third, confronting this challenge effectively means that institutions need to change. International agencies and partners from other countries must adapt procedures so they can respond with agility and speed, a longer-term perspective, and greater staying power. Fourth, need to adopt a layered approach. Some problems can be addressed at the country level, but others need to be addressed at a regional level, such as developing markets that integrate insecure areas and pooling resources for building capacity Fifth, in adopting these approaches, need to be aware that the global landscape is changing. Regional institutions and middle income countries are playing a larger role. This means should pay more attention to south-south and south-north exchanges, and to the recent transition experiences of middle income countries.Publication World Development Report 1987(New York: Oxford University Press, 1987)This report, consisting of two parts, is the tenth in the annual series assessing development issues. Part I reviews recent trends in the world economy and their implications for the future prospects of developing countries. It stresses that better economic performance is possible in both industrial and developing countries, provided the commitment to economic policy reforms is maintained and reinforced. In regard to the external debt issues, the report argues for strengthened cooperation among industrial countries in the sphere of macroeconomic policy to promote smooth adjustment to the imbalances caused by external payments (in developing countries). Part II reviews and evaluates the varied experience with government policies in support of industrialization. Emphasis is placed on policies which affect both the efficiency and sustainability of industrial transformation, especially in the sphere of foreign trade. The report finds that developing countries which followed policies that promoted the integration of their industrial sector into the international economy through trade have fared better than those which insulated themselves from international competition.Publication Classroom Assessment to Support Foundational Literacy(Washington, DC: World Bank, 2025-03-21)This document focuses primarily on how classroom assessment activities can measure students’ literacy skills as they progress along a learning trajectory towards reading fluently and with comprehension by the end of primary school grades. The document addresses considerations regarding the design and implementation of early grade reading classroom assessment, provides examples of assessment activities from a variety of countries and contexts, and discusses the importance of incorporating classroom assessment practices into teacher training and professional development opportunities for teachers. The structure of the document is as follows. The first section presents definitions and addresses basic questions on classroom assessment. Section 2 covers the intersection between assessment and early grade reading by discussing how learning assessment can measure early grade reading skills following the reading learning trajectory. Section 3 compares some of the most common early grade literacy assessment tools with respect to the early grade reading skills and developmental phases. Section 4 of the document addresses teacher training considerations in developing, scoring, and using early grade reading assessment. Additional issues in assessing reading skills in the classroom and using assessment results to improve teaching and learning are reviewed in section 5. Throughout the document, country cases are presented to demonstrate how assessment activities can be implemented in the classroom in different contexts.