Debt Management Performance Assessment

52 items available

Permanent URI for this collection

Items in this collection

Now showing 1 - 10 of 45
  • Thumbnail Image
    Publication
    Cape Verde - Debt Management Performance Assessment (DeMPA)
    (Washington, DC, 2022-04) World Bank
    A World Bank mission undertook applied the Debt Management Performance Assessment (DeMPA) methodology to evaluate the government’s debt management (DM) capacity and institutions in Cabo Verde during March 28 to April 5, 2022. The assessment covers the legal, institutional, and regulatory framework governing DM. The primary counterpart was the Ministry of Finance (MoF) and within it, the Department of the National Treasury / Financial Operations Service which is the main DM office for the central government. The mission identified DM strengths and areas in need of reform, which are useful for measuring progress in DM capacity, supporting policy dialog with the authorities in the context of the second series of the Development Policy Financing operation (DPF). The policy dialogue helped to build on what has changed since the 2016 DeMPA and discussing persisting gaps in government debt management practices. Reducing debt vulnerabilities is an urgent priority for the government of Cabo Verde and would require a combination of debt reprofiling, higher economic growth and fiscal consolidation. With limited space to borrow, it would also require effective Debt Management.
  • Thumbnail Image
    Publication
    Niger - Debt Management Performance Assessment (DeMPA)
    (Washington, DC, 2022-03) World Bank
    This report assesses Niger’s debt management capacity and institutions through the application of the Debt Management Performance Assessment (DeMPA) methodology. Revisiting the five core dimension areas of the DEMPA, there are key features that stand out. First, in governance and debt management strategy benefit from clear legal frameworks for borrowing activities. Implementation needs to be improved, including mainly the assessment of Niger’s debt management strategy. Second, there is a good coordination of debt management strategy with macroeconomic policies due to the clear separation between monetary policy and debt management activities and the use of harmonized debt projections for the budget and the debt management strategy. Third, with respect to borrowing and related financing activities, the Government makes use of market-based instruments on the regional market to fund domestic borrowing requirements, but external debt strategy needs to build on an annual borrowing plan. Fourth, good cash flow forecasting and good cash balance management build on the creation of the Treasury Single Account. Fifth, debt recording, and operational risk management are in need of significant improvements. The report has more detailed overview of these aspects and the progress made since the last DEMPA in 2012.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment Methodology: 2021 Edition
    (World Bank, Washington, DC, 2021-11-25) World Bank
    The Debt Management Performance Assessment (DeMPA) is the World Bank’s diagnostic tool for assessing performance using a comprehensive set of indicators that span the full range of government debt management (DM) functions. Launched in 2007, revised in 2015, the indicators have become an internationally recognized standard in the government DM field and can be applied in all developing countries. The DeMPA offers a sound diagnostic framework that allows a country’s DM processes and institutions to be evaluated against sound international practice, identifying core strengths and weaknesses, and thereby helping strengthen capacity and institutions so that countries can manage their government debt effectively and sustainably. It will assist countries that want to undertake debt management reforms, helping to monitor progress with achieving government DM objectives consistent with international sound practice. The DeMPA is modeled on the Public Expenditure and Financial Accountability (PEFA) indicators, however, it uses a more comprehensive set of indicators, spanning the full range of government debt management (DM) functions, to provide a detailed assessment of government DM. The DeMPA methodology consists of two parts: i) a description of the methodology and ii) an evaluation tool that summarizes key questions that should be assessed in the context of a DeMPA evaluation.
  • Thumbnail Image
    Publication
    Maldives Debt Management Reform Plan
    (World Bank, Washington, DC, 2019-03-01) World Bank
    The first Debt Management Performance Assessment (DeMPA) for Maldives was conducted in 2009, and a second DeMPA was completed in March 2019. The authorities have taken important steps to improve debt management since the first assessment, but many challenges remain. The government has implemented a series of reforms to public financial and debt management, including changes to the legal and institutional framework. Key measures include a complete overhaul of Treasury operations, the implementation of the Integrated Financial Management Information System (IFMIS) across all government entities in the capital, Malé, the establishment of a Treasury Single Account, and the development of cash-flow forecasting procedures. The coverage of the Commonwealth Secretariat Debt Recording and Management System (CSDRMS) has also been expanded, and the CS-DRMS is now used as a central database for almost all debt obligations, except Islamic finance instruments. The results of the 2019 DeMPA shed light on these improvements and indicate areas for further action.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Maldives
    (World Bank, Washington, DC, 2019-03) World Bank
    A World Bank (WB) mission undertook an assessment of the government's debt management(DeM) capacity and institutions in Maldives during March 20-29, 2019, at the request of theMinistry of Finance (MoF). The objective of the mission was to assess the DeM strengths andareas in need of reform through the application of the Debt Management Performance Assessment (DeMPA) methodology. This is the second evaluation for Maldives; the first DeMPA was conducted by the WB in 2009. The MoF has implemented a series of public finance management reforms in legal and institutional arrangements since the last DeMPA. Treasury operations have experienced a complete overhaul, including the rolling out an Integrated Financial Management Information System (SAP) to government entities on Male', establishment of a Treasury Single Account (TSA) and the development of cash flow forecasting procedures. The coverage of the debt management system, the CS-DRMS, has also been expanded and is now used as a central database for almost all debt obligations (excluding Islamic instruments). The DeMPA methodology, revised in 2015, provides a comprehensive set of indicators spanning the full range of DeM functions and is used for in-depth analysis of government debt management functions and institutions. The results of the assessment help the central government authority to take stock of the current DeM situation and design medium term priority reforms. The results of 2019's assessment for Maldives demonstrate many broad-based improvements implemented in Maldives and provide highlights of pending reforms.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Moldova
    (World Bank, Washington, DC, 2018-12) World Bank
    The objective of the mission was to assess the debt management strengths and areas in need of reform through the application of the Debt Management Performance Assessment (DeMPA) methodology. The DeMPA mission delivered an evaluation of the legal, institutional and regulatory framework in government debt management.Compared to the previous DeMPA assessment undertaken in 2008, impressive progress is observed in a number of areas. These include the quality and annual update of a medium-term debt management strategy and borrowing plans and procedures for external borrowing. Areas that have digressed or not improved include coordination with fiscal policy and debt sustainability analysis, and cash flow forecasting and cash management.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Dominica
    (World Bank, Washington, DC, 2018-08) World Bank
    The World Bank and the Eastern Caribbean Central Bank (ECCB) undertook a comprehensive assessment of the debt management (DeM) functions of the Government of Dominica (GoD) from June 18 to 22, 2018.The main outcomes of the debt management performance assessment are as follows: The assessment indicates that legal framework includes clear authorization for the Minister of Finance to borrow and issue loan guarantees on behalf of the Government. However, authorization to issue bonds in the regional market is not clearly defined.legal framework is fragmented and does not include borrowing purposes. The Debt Management Unit (DMU) is the principal guarantee entity but the borrowing operations involve more entities and are not well coordinated.Reasonably reliable debt service forecasts are produced by the DMU, but in-house debt sustainability analysis (DSA) is not undertaken. A staff in Macroeconomic Unit within the MoF has received training in the use of DSA framework and plans to undertake the exercise in-house in the coming fiscal year.Cash flows are forecasted on a monthly basis, but not submitted to the ECCB for liquidity management purposes. The Government has access to a well-developed Regional Government Securities Market (RGSM), but the potential has not been fully reaped, since Treasury bills (T-bills) are also issued locally with less advanced techniques, implying significant exposure to operational risks.Monthly detailed cash flow forecasts are prepared by the Accountant General´s Office (AGO) which could be used to guide upcoming budget allocation and short-term T-bill issuance for cash management purposes.The DMU is maintaining complete government debt and guarantees’ records which are updated quickly due to well-developed contacts with creditors and projects.The DMU has developed a draft procedures manual but it does not cover all DeM procedures and it has not been finalized. The DMU staff capacity is not sufficient and the work is not organized with adequate segregation of duties.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Kingdom of Lesotho
    (World Bank, Washington, DC, 2018-07) World Bank
    At the request of the Minister of Finance of Lesotho, a joint World Bank -Macroeconomic and Financial Management Institute of Eastern and Southern Africa (MEFMI) mission visited Maseru, between July 2 to 6, 2018, to undertake a Debt Management Performance Assessment (DeMPA).The objective of the mission was to evaluate current performance against the DeMPA methodology, and to assess progress since 2012, when the first DeMPA was performed.The results of the evaluation, spanning the full range of debt management (DeM) functions, show limited progress. Compared to the previous DeMPA, the current assessment revealed only one upgrade related to the registry and management system for domestic debt of the CBL. Yet, additional actions to improve debt management in Lesotho are currently under discussion (i.e., approval of a new policy framework and public debt law), or have already started such as the publication of a debt statistical bulletin, undertaking of a Medium-Term Debt Strategy (MTDS) analytical exercise as the foundation for a Debt Management Strategy, and introduction of a Cash Management Unit.The assessment also revealed several downgrades associated to weaknesses in debt reporting to parliament, lack of regular information sharing between MoF - CBL and with market participants, as well as lack of secure storage and backup for the debt recording and management system of the MoF. Additional areas of improvement relate to, among others: i) fragmented legal framework; ii) lack of a loan guarantees’ framework; iii) preparation and approval of a formal Debt Management Strategy; iv) weak quality controls for data publication; v) quality of cash flow forecasts; vi) lack of policies and procedures for DeM operations; and, vii) completeness and timeliness of debt records.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Guinea
    (World Bank, Washington, DC, 2018-05) World Bank
    The DeMPA methodology provides a comprehensive set of indicators spanning the full range of DeM functions and used for in-depth analysis of the quality of government debt management functions and institutions. The results of the DeMPA evaluation help the central government authority to take stock of the current DeM situation, assess quality of undertaken reforms and design medium term reforms’ plan. The Guinean economy is recovering well from two recent major shocks: the Ebola epidemic in 2014-2015 and a decline in commodity prices after 2015. After slowing in 2014–2015 to an average of 3.6 percent, growth reached 10.4 percent in 2016, supported by a recovery in mining, good agricultural performance, and more reliable electricity supply. The mining sector accounted for more than half the growth rate, supported by the expansion of bauxite and alumina production and increased demand. The growth momentum is expected to continue with real growth reaching 5.8 percent in 2018 and averaging approximately 5 ½ percent over the medium term, driven by strong performance in mining, construction, and scaled-up investments in infrastructure. Risks to these projections are balanced, with downside potential from socio-political tensions, delays in projects and reform implementation, and upside potential from faster-than-expected mining production capacity coming on stream.
  • Thumbnail Image
    Publication
    Debt Management Performance Assessment: Uganda
    (World Bank, Washington, DC, 2018-03) World Bank
    A joint World Bank-Macroeconomic and Financial Management Institute of Eastern and Southern Africa (MEFMI)-United Nations Conference for Trade and Development (UNCTAD) mission undertook an assessment of the government’s debt management capacity and institutions in Uganda during March 2018. The objective of the mission was to assess the debt management strengths and areas in need of reform through the application of the debt management performance assessment (DeMPA) methodology. The results of the DeMPA evaluation help the authorities to take stock of the current debt management situation and design medium term priority reforms. This report records the DeMPA in Uganda as of March 2018.