Other Procurement Study

25 items available

Permanent URI for this collection

Items in this collection

Now showing 1 - 8 of 8
  • Publication
    Green Public Procurement: An Overview of Green Reforms in Country Procurement Systems
    (World Bank, Washington, DC, 2021-11-04) World Bank
    This report provides an overview of international experience in the implementation of Green Public Procurement (GPP). It focuses on the institutional framework that is needed to support the mainstreaming of GPP practices across government. The intention is to equip practitioners with a broad understanding of the issues they need to consider in the design and implementation of GPP reforms. The report draws on a wide range of country examples. It provides links to handbooks and tools for practitioners.
  • Publication
    Benchmarking Public-Private Partnerships Procurement 2017
    (World Bank, Washington, DC, 2016-09-29) World Bank Group
    Many economies are yet to adopt broadly recognized good practices to prepare, procure, and manage Public-Private Partnerships (PPP). The report flags potential improvements that can help governments fill the gap in an effort to provide better PPP procurement and enable better infrastructure service delivery to all. The report benchmarks government capabilities in 82 economies across four key areas: PPP preparation, PPP procurement, unsolicited proposals, and PPP contract management.
  • Publication
    Kyrgyz Republic : Country Procurement Status Review
    (Washington, DC, 2012-08) World Bank
    The Country Procurement Status Review (CPSR) report was prepared on the basis of the findings from a joint World Bank (WB)/Asian Development Bank (ADB) mission that visited the Kyrgyz Republic in February 2012. The main objectives of the CPSR are: (a) to analyze the Kyrgyz public procurement system, including the existing legal framework, organizational responsibilities, control and oversight mechanisms, capacity, and current procedures and practices, as well as how well these work in practice; and (b) based on these analyses and review, to identify key areas for improvement in public procurement and prepare an action plan for implementation of related revisions to the public procurement system. The report has three chapters: (I) Introduction; (II) Assessment of the Public Procurement System; and (III) Recommendations and Action Plan. A summary of the main findings and recommendations is provided in the Executive Summary at the beginning of the report. The detailed assessment of the Baseline Indicators is provided in Annex C. Additional Provisions for National Competitive Bidding under WB-financed operations is provided in Annex D.
  • Publication
    Solomon Islands : Operational Procurement Review
    (Washington, DC, 2012-06) World Bank
    Solomon Islands is a remote, scattered archipelago about 1,900 km northeast of Australia in the South Pacific, with terrain ranging from about 1,000 mountainous islands to low-lying coral atolls stretching in a 1,450 km chain east of Papua New Guinea across the Coral Sea to Vanuatu. The archipelago covers a total area of 725,197 sq km (approx 280,000 sq miles) with the main islands being Choiseul, New Georgia, Santa Isabel, Guadalcanal, Malaita, and Makira. The Solomon Islands are situated among one of the world's most disaster-prone geographic regions in what is known as the circum-pacific belt, earthquake belt or ring of fire. The low-lying coastal regions of the Solomon Islands can also be subject to damage from tsunamis. In addition, the zone in which the Solomon Islands archipelago is located is an area where cyclones are formed. The Solomon Islands is thus subject to many natural Threats, earthquakes, tsunamis, volcanic eruptions, tropical cyclones and windstorms, floods, landslides, and droughts. The objective of this report is to review the Solomon Islands existing national legislation, policies, procedures, practices, institutional arrangements and organizational capacity for public sector procurement to assess both their acceptability for use in national competitive bidding under World Bank-financed projects and, in the process, provide a benchmarking analysis in key thematic areas.
  • Publication
    Pakistan - Federal Procurement Baseline Indicator Systems Assessment
    (World Bank, 2009-06-01) World Bank
    The Baseline Indicators (BLIs) assessment has been conducted by the Development Partners and the Government of Pakistan as a precursor to carrying forward the Government's efforts to upgrade the Country Procurement Systems (CPS) to international standards and to help it assess the level and type of technical assistance required for achieving this objective. The assessment, being the first phase of a comprehensive procurement performance assessment, covered the four pillars as well as all the indicators and sub-indicators in each pillar based on a review of the existing regulatory framework and the institutional and operational arrangements and as provided for in the Organization for Economic Development (OECD) Development Advisory Committee (DAC) guidelines. While the views expressed in the report were the subject of discussions at the stakeholders' workshop, they do not necessarily represent the views of the Government of Pakistan. The result indicates that compared to the standard required for a transparent, efficient and effective procurement system, the existing system in Pakistan needs to be improved substantially. The highest achieved rating is for pillar one, the legislative and regulatory framework, which is an amalgam of specific legislation and sub-legislation impacting the procurement activity of the government and the older legislative instruments affecting the overall operations of the public and/or the private sectors. The Public Procurement Regulatory Authority (PPRA) is the apex body of the institutional framework (pillar two) governing the public procurement arena. The Pakistan Engineering Council (PEC) was involved as a member of the Kazi committee to prepare a standard bidding document and standard General Conditions of Contract (GCC) for all engineering contracts. Improvements in improving the procurement market and operations (pillar three) can only happen when substantial progress has been achieved in reforming pillars one and two of the procurement framework. Integrity and efficiency in the public procurement system (pillar four) is the ultimate goal of all procurement systems and is not easily achieved. This, therefore, requires changes not only within the specific procurement related legislation, but also across a raft of other legislation to ensure an overall enabling environment. Coupled to this is the need to motivate decision makers and civil society to actively participate in ensuring the implementation of the revised legislation. This will require several years, but the effort could be started at an early stage of the reform process.
  • Publication
    West Bank and Gaza : Country Procurement Issues Paper
    (Washington, DC, 2008-06) World Bank
    The main aim of the CPIP is to assess the current state of pubic procurement in West Bank and Gaza in the form of a ''snap shot'' and accordingly, to provide a partial assessment, broadly along the lines of the OPCS paper that would address the following objectives. First, to assess the latest progress with regard to the procurement reform recommended by the 2004 CPAR and the commitment of the Palestinian Authority (PA) to pursue the reform. Next, to report on the link between public sector procurement and the local private sector, in terms of competitiveness, performance, constraints, and commercial practices affecting public procurement. Finally, compile a set of recommendations that would strengthenprocurement arrangements and functions under future Bank-financed operations in the WB&G. These could also serve as basis to suggest specific improvements in current procurement processes, as well as next steps towards the achievement of a procurement system that meets internationally recognized standards.
  • Publication
    Nepal : Electronic Government Procurement Readiness Assessment and Roadmap
    (World Bank, Washington, DC, 2007-10) World Bank
    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public procurement, provided comment on the degree of readiness of nine key components related to e-GP: leadership, human resource planning, procurement planning and management, procurement policy, legislation and regulation, Internet and electronic infrastructure, standards, private sector integration, and current e-GP systems and initiatives. The assessment found: adequate evidence that an e-Tendering system is in place but is little used; some evidence that procurement legislation and procurement planning is in place and being supported, and that some procurement training has been conducted; and limited evidence that leadership, human resource planning, procurement management, regulation, and Internet infrastructure services are in place and being supported. The Roadmap sets out the features for a comprehensive e-GP service including e-Tendering, e-Purchasing, e-Reverse Auctioning, and a Procurement Information and Management System.
  • Publication
    Maldives : Electronic Government Procurement Readiness Assessment and Roadmap
    (Washington, DC, 2007-05) World Bank
    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and private sectors, who provided advice or comment on the degree of readiness of nine key components related to e-GP: government leadership, human resource planning, procurement planning and management, procurement policy, procurement legislation and regulation, Internet and electronic infrastructure, standards, private sector integration, and current e-GP systems and initiatives. The assessment found: adequate evidence that Internet and electronic infrastructure are in place and supported, little evidence that government leadership, planning and management, procurement regulation, standards, private sector integration, or e-GP systems are in place and being supported; no evidence that human resource planning, procurement legislation, or procurement policy were in place. This report outlines a strategy to make ready and implement electronic government procurement policies, infrastructure, and initiatives.