Other Infrastructure Study

365 items available

Permanent URI for this collection

Items in this collection

Now showing 1 - 10 of 11
  • Publication
    Philippine Transport Infrastructure Development Roadmap Framework Plan: Executive Summary
    (World Bank, Washington, DC, 2014-10) Cambridge Systematics
    Various transport-related agencies and local governments develop their respective transport plans or strategies to address bottlenecks and improve outcomes in the transport sector. However, to be able to bring a more focused or targeted intervention that is more inclusive, these various strategies need to focus on establishing interconnectivity between key urban growth centers and between lagging and fast-growing regions, and creating supporting institutions that promote greater integration. Upon the request of the National Economic and Development Authority, a framework plan was developed to provide policy-makers with a strategic framework to help identify the transport needs of the Philippines and guide in implementing an integrated, more coordinated approach to establishing stronger transport infrastructure linkages to support the country’s inclusive growth agenda. The framework plan was developed under the guidance of a vision and goals developed by stakeholders across the Philippines. This comprehensive vision can be summarized as ‘Bringing us all closer together for prosperity.’ The geographic focus of the Framework Plan includes all of the Philippines outside of Metro Manila. This Framework Plan does not replicate the work being done by the Japan International Cooperation Agency (JICA) for Metro Manila (the JICA study covers Metro Manila with an approximate radius of 100 kilometers and is being conducted to evaluate specific transport infrastructure projects for the Metro Manila area). Future improvements and needs of transportation infrastructure to meet the demand for long-distance transport to and from Metro Manila and to other urban/economic centers in the Philippines are considered; nevertheless, national-level strategies recommended in this study affect all areas of the Philippines.
  • Publication
    Regional Economic Impact Analysis of High Speed Rail in China : Main Report
    (Washington, DC, 2014-06-25) World Bank
    This report reflects a two-stage work flow designed to fulfill the research objectives: stage one defined the methodology, and stages two tested this methodology and transferred the know-how to the China Railway Corporation and its consultants through case studies. Chapter two summarizes the theoretical framework within which regional economic impacts are discussed and quantified. Chapter three reviews current regional economic impact analyses in China. Chapter four summarizes the approach to practical regional impact assessment in other countries and reviews the relevance of the main methods in the Chinese context. Chapter five summarizes the work that has been carried out by the World Bank to date in estimating regional impacts in China. Chapter six develops a practical approach to quantifying the regional economic impacts of future HSR in China, including methods for data collection, surveys and interviews. Chapter seven presents the implementation of the methodology in the case studies and the interpretation of quantified model results. Chapter eight summarizes the conclusions and the recommendations for further work. In addition, appendices one to three provide further details about existing assessment studies and methodologies. Appendices four and five show the interview and survey forms. A separate report provides a step-by-step how-to guide for a regional economic impact assessment using a four zone generic example model, which as a simple numerical example complements the presentation of the case study applications on Changchun-Jilin HSR and the northern part of the Beijing-Shanghai HSR.
  • Publication
    Regional Impacts of High Speed Rail in China : Spatial Proximity and Productivity in an Emerging Economy
    (World Bank, Beijing, 2013-06-30) Jin, Ying; Bullock, Richard; Fang, Wanli
    This paper contains an initial reconnaissance of the situation in Yunfu, prior to the NanGuang project construction. It provides a brief overview of the trajectory of economic development in Yunfu from an economy that was dominated by primary industries to that by secondary industries. The development of local transport infrastructure is reviewed, as is the more detailed structure of local industries, with special emphasis on dominant industrial sectors and the planned industrial parks. The experience of high speed rail development impact elsewhere was drawn upon to reflect on the possible regional economic outcomes that might emerge following the opening of the Nanning-Guangzhou high speed rail. The structure of and the approach to a before and after monitoring study is considered. The remainder of the paper is divided into six parts. Part two gives a brief overview of the economic development in Yunfu municipality since its establishment in 1994. Part three describes local transport links and infrastructure. Part four provides a description of the internal structure of local industries, with special emphasis on the dominant industrial sectors and the planned industrial parks. Part five discusses possible regional economic impacts associated with the forthcoming high-speed rail line and part six summarizes a proposal for the next steps.
  • Publication
    Mongolia : Improving Public Investments to Meet the Challenge of Scaling Up Infrastructure
    (Washington, DC, 2013-01) World Bank
    The objective of this report is to analyze in depth the current public investment management system and to assess whether or not it is able to meet this challenge of delivering good quality projects in the priority areas in a macro-economically sustainable manner; and to recommend what needs to be done to improve the system so that it is able to effectively transform natural resource revenues into sustainable capital assets. In making its recommendations, this report focuses on some of the details that need to be laid out in implementing regulations in order to make the Fiscal Stability Law (FSL), Budget Law of Mongolia (IBL), and Public Procurement Law of Mongolia (PPLM) work. The report also suggests amendments to some of the existing laws that pose a risk to meeting the four objectives. In proposing policy options, the report is conscious of the political economy of reform and, wherever possible, analyzes the compatibility of the technical solutions with the political interests of policy-makers.
  • Publication
    Lao PDR - Labor Standards and Productivity in the Garments Export Sector : A Survey of Managers and Workers
    (Washington, DC, 2012-07) World Bank
    This report describes labor practices in the Lao garments export sector as seen by both management and labor. The main objective of this report is to present the differing perspectives on working conditions between managers and workers, and to explore ways in which the Lao garment sector could break out of this unsustainable situation. More specifically, insights on management practices, working conditions and worker motivation, as well as industry technology and workflow practices, are drawn from the survey and recommendations made on what firms, industry, government and development partners can do to boost productivity in the sector. This study seeks to investigate further possible factors contributing to low-productivity including management practices, working conditions and worker motivation, as well as industry technology and workflow practices. In order for the garment sector to progress, this study points to possibilities to increase worker wellbeing, reduce turnover and improve productivity through mutually reinforcing actions. Possible interventions include: a transition support program and improved labor market information systems to support labor force entry; better worker representation and dispute resolution mechanisms; and, a factories improvement program that would include monitoring/certification systems to provide incentives for firms to improve conditions as a means of accessing elusive premium buyers.
  • Publication
    Powering Up Productivity in Rural Lao PDR : Stimulating Small and Medium Enterprises to Use Electricity for Income Generation
    (World Bank, Washington, DC, 2011-06) Tuntivate, Voravate Tig
    This study s broad goal was to identify opportunities for promoting productive uses of electricity in existing as well as among new small and medium enterprises (SMEs) in the rural villages of Lao PDR to generate income for rural people and promote economic development. To this end, the study team conducted a market analysis of current businesses and services, as well as major agro-processing and other income-generating activities in (i) six selected central and southern provinces connected to grid-based electricity and (ii) 10 rural villages of a remote northern district that rely on renewable energy based, off-grid power supply. Based on the survey results, the study team identified opportunities for the SMEs to switch to or adopt electricity for productive purposes; major obstacles faced by the SME owners in utilizing electricity more fully; and suggested ways to overcome these barriers, including the facilitating role of EdL (Electricité du Laos, the country s national utility company. This study relied on a social marketing survey conducted in February 2011 as the primary data source. It also drew from literature reviews and information gathered from government agencies and international organizations. Three sets of field surveys were conducted. The first set focused on rural villages with access to grid electricity whose main crop is rice; the surveys covered three central (Bolikhamxai, Khammouan, and Savannakhet) and three southern (Salavan, Champasak, and Attapue) provinces. The second set focused on rural villages with access to grid electricity whose main crop is coffee; the surveys covered the same three southern provinces (Salavan, Champasak, and Attapue). Finally, the third set focused on 10 rural villages in the Muang Mai district of Phongsaly province (Sobnaon, Houayvangkao, Nakang, Houaychik, Naxong, Sobhoun, NamNga, Xongneua, Sensaat, Nakham), which are served by an isolated grid system
  • Publication
    Indonesia - Investing in the future of Papua and West Papua : Infrastructure for sustainable development
    (World Bank, 2009-10-01) World Bank
    The remote and sparsely populated provinces of Papua and West Papua face a time of great change. Monetary transfers from Jakarta have grown extraordinarily in recent years, by more than 600 percent in real terms and 1300 percent in nominal terms since 2000, greatly increasing demand for goods and services. The high price of imports in the interior is producing pressure to improve roads in order to lower transport costs. Pressure is mounting to open up the interior of the region to commercial interests that would like to extract resources: copper, gold, coal, petroleum, natural gas, and, above all, timber. Investment in infrastructure, especially in road transport, is seen as the means to make dreams of development a reality. Building infrastructure in Papua and West Papua also is challenging because of physical (i.e. topographical and geological) conditions. Much of the region has either poorly drained peat soils or steep slopes with thin soils subject to landslides and erosion. Most of Papua and West Papua also receive heavy seasonal rainfall. The cost of building a good, well-planned road into the highlands is Indonesian Rupiah (IDR) 6 to 10 billion per kilometer, far more than has been budgeted in the past. Combined with the low population density (a region three times the size of Java has a population smaller than that of Lombok), this means that it takes bigger networks of roads and power to serve the population. Moreover, such infrastructure has been inadequately maintained. As a result, especially outside urban areas, there is too little to show for past investments in roads, water supply systems, or power generating capacity. The aim of this report is: (i) to lay out the challenges that faces infrastructure planners and implementers in the central, provincial, and Kabupaten and Kota governments in a clear manner; and (ii) provide those planners and implementers with recommendations, based on the best information available, on how to mitigate the effects of these challenges.
  • Publication
    Transport Development Priorities in Papua and West Papua
    (World Bank, 2009-10-01) World Bank
    The province of Papua of the Republic of Indonesia was provided special autonomy under law 21-2001 in recognition of the fact that 'the management and use of the natural wealth of Tanah Papua has not yet been optimally utilized to enhance the living standard of the natives, causing a deep gap between the Papua province and the other regions, and violations of the basic rights of the Papuan people.' The goal of special autonomy was to help Papua and Papuans catch up to the rest of Indonesia in terms of living standards and opportunities. Yet, now almost a decade later, and after the split into two provinces: Papua and West Papua, progress toward this goal has been slow. In recognition of this, the Indonesian central government issued presidential instruction 5-2007 on the acceleration of development of Papua and West Papua instructing all relevant technical ministries to devote special attention to the two provinces and to coordinate their programs with the governors of both provinces. Transport is a key piece of the development puzzle and is a high priority for all levels of government in Papua and West Papua. Yet, despite this, and large amounts of investment channeled toward the sector, the people of Papua and West Papua are not receiving substantially better transportation services than they were before special autonomy. This report aims to set out a set of priorities that transport development must follow in Papua and West Papua if investments are to be productive and remain useful for their entire design life.
  • Publication
    Southern Mongolia Infrastructure Strategy
    (Washington, DC, 2009) World Bank
    This report is concerned with the development of the infrastructure which is required in order to support proposed mines in Southern Mongolia. In order for the mines to be developed, it will be necessary to provide towns for the new inhabitants, road and rail links to provide supplies and to transport the mines' products to markets, and electricity for the mines' operations. Water resources need to be investigated and supplied to the mines and towns. And as all of the development advances, consideration needs to be given to mitigating any negative environmental and social impacts. The geographic focus of the report varies according to the particular topic. The mines are all located in a region which this report defines as 'Southern Mongolia', and which includes the images of Omnogovi, Dornogovi, Govisumber and Dundgovi. The majority of the important new mines are located in Omnogovi, and the analysis of housing and social impacts is concentrated in areas close to these mines. In terms of time, the report concentrates on the most important priorities for government action up to 2015. Nevertheless, consideration is given to a longer time-horizon when considering the potential environmental and water resource demands likely to arise as a result of the region's development. The report is not concerned with the longer-term actions required for broader economic development of the region, including the development of value-added industries associated with the mining industry. To get to long-term objectives, it is necessary to start with the short term. This report assumes that the Government will permit development of the mines in the near future.
  • Publication
    An Expressway Development Strategy for Vietnam
    (Washington, DC, 2008-12) World Bank
    Vietnam's rapid economic growth continues to create new demands for transport infrastructure and services. Bottlenecks to business activities caused by infrastructure constraints are already appearing in several areas. High rates of urbanization, rising traffic accidents, new capacity constraints, and a large increase in asset preservation requirements to meet the fast expansion of transport assets presents further challenges to the sector. To address these infrastructure bottlenecks, and to gradually remove the transport constraints on industry, Vietnam is embarking on an ambitious expressway development program. To date the transport sector has facilitated this growth principally through the rehabilitation and widening of existing arterial roads. The national road network has expanded to 17,000 km, the overall condition has improved with 66 percent of the network being in good and fair condition and 84 percent of the network is now paved. If traffic growth rates continue at their current rate these constraints could adversely impact future economic development. The successful development of an expressway system is a significant physical and financial commitment which will require a number of changes to laws, regulations, institutions and operations of the network.