Other Infrastructure Study
341 items available
Permanent URI for this collection
9 results
Filters
Settings
Citations
Statistics
Items in this collection
Now showing
1 - 9 of 9
-
Publication
Deforestation Trends in the Congo Basin : Transport
(World Bank, Washington, DC, 2013-04) Megevand, Carole ; Dulal, Hari ; Braune, Loic ; Wekhamp, JohannaThe Congo Basin is among the most poorly served areas in terms of transport infrastructure in the world, and it faces a challenging environment with dense tropical forests crisscrossed by numerous rivers that require construction of numerous bridges. Given such complexities, constructing transport infrastructure as well as properly maintaining it is certainly a key challenge for the Congo Basin countries. Recent studies indicate that investment required per kilometer of new roads is substantially higher than in other regions of Sub-Saharan Africa (SSA) and the same applies for maintenance. The physical capital of transport infrastructure is deteriorated in the Congo Basin. The ratio of classify roads in good and fair conditions range from 25 percent in Republic of Congo to 68 percent in the Central African Republic, which is globally lower than the average for low-income countries (LICs) and resource-rich countries. Other transportation assets (railways and river system) are also limited: the railway network is essentially a legacy of the colonial era and mainly used for mineral transportation, while the river system is basically only marginal. -
Publication
International Experience in Bus Rapid Transit Implementation : Synthesis of Lessons Learned from Lagos, Johannesburg, Jakarta, Delhi, and Ahmedabad
(World Bank, Washington, DC, 2012-01) Kumar, Ajay ; Zimmerman, Samuel ; Agarwal, O.P.It is in this context that this study has been undertaken to document BRT case studies in terms of the political setting, institutions/governance, public involvement and communications, service/operations/management and planning and their relationship to investment performance. The study has been undertaken in recognition of the fact that successful implementation and operation of BRT systems often reflects non-physical actors like leadership, communications, organizational structure, service planning and operating practices rather than the design of transitways, stations, terminals and vehicles. This paper does not seek to compare BRT with other forms of public transport but only seeks to evaluate a sample of BRT systems in terms of the softer issues that have contributed making a BRT system successful or not so successful. -
Publication
The Future of Water in African Cities : Why Waste Water? Integrating Urban Planning and Water Management in Sub-Saharan Africa, Background Report
(World Bank, Washington, DC, 2012-01) Bloch, RobinThis paper is one of a series of analytical studies commissioned by the World Bank's Africa Region and Water Anchor which are intended to identify and address the future challenges of urban water supply, sanitation and flood management in Sub-Saharan Africa's (SSA) cities and towns. Following the terms of reference for the assignment, and as indicated by its title, the paper is directed at understanding and describing the linkages and interdependencies between water management and water security on the one hand, and urbanization, urban planning and development on the other. The paper is structured in six sections. Section one presents an overview of urbanization trends in SSA. This is followed by a discussion in Section two of what can be seen as the corollary of the unprecedented urban population growth now occurring and projected for SSA, large-scale urban expansion, involving potentially massive increases in urban land cover. This expansion has implications, also discussed in section two, for the internal structuring of African cities and towns, and for the planning and development of the overall urban form which is resulting, as well as for the environmental risks cities and towns face now and into the future. This 'poor urban planning' in the present-day has its roots in the inherited practices of colonial-era planning theories and practices, which are described in section three. These still resonate, as discussed in section four, which discusses key constituent aspects of contemporary planning systems in Africa, as illustrated by a number of case studies. In section five, the focus shifts to the current institutional experience with urban water management, again with a number of good practice cases provided. The author then turn in the concluding section seven to the key concern of this issues paper: that of integrating urban planning and water management as the Integrated Urban Water Management (IUWM) approach emerges- or, perhaps to put it better, of finding ways in which such integration can promote the emergence of IUWM. This is a necessary but difficult task, complicated by the reality that, as seen in the quote above, IUWM requires quite considerable coordination within the water sector alone. Moreover, our preceding analysis demonstrates, and this is the core argument of this paper, that seen from the side of the overall urban planning system, the deficiencies, decline and the delegitimizing of the 'traditional' planning system and practices in SSA, and the theory which underpins them, along with the failure to modernize them in a consistent fashion, has led, if anything, to greater fragmentation in the planning and managing of urban development. Land use planning and infrastructure (and other sector) planning, including water, typically occur in an uncoordinated fashion. This makes planning adequately for large-scale urban growth and expansion that much more difficult. -
Publication
Water Supply and Sanitation in the Democratic Republic of Congo : Turning Finance into Services for 2015 and Beyond
(World Bank, Nairobi, 2012) World BankThe African Ministers' Council on Water (AMCOW) commissioned the production of a second round of Country Status Overviews (CSOs) to better understand what underpins progress in water supply and sanitation and what its member governments can do to accelerate that progress across countries in Sub-Saharan Africa (SSA). AMCOW delegated this task to the World Bank's Water and Sanitation Program and the African Development Bank who are implementing it in close partnership with United Nations Children's Fund (UNICEF) and World Health Organization (WHO) in over 30 countries across SSA. This CSO2 report has been produced in collaboration with the Government of the Democratic Republic of the Congo (DRC) and other stakeholders during 2009-10. The analysis aims to help countries assess their own service delivery pathways for turning finance into water supply and sanitation services in each of four subsectors: rural and urban water supply, and rural and urban sanitation and hygiene. The CSO2 analysis has three main components: i) a review of past coverage; ii) a costing model to assess the adequacy of future investments; and iii) a scorecard which allows diagnosis of particular bottlenecks along the service delivery pathway. The CSO2's contribution is to answer not only whether past trends and future finance are sufficient to meet sector targets, but what specific issues need to be addressed to ensure finance is effectively turned into accelerated coverage expansion in water supply and sanitation. In this spirit, specific priority actions have been identified through consultation with government and other sector stakeholders. A regional synthesis report, available separately, presents best practice and shared learning to help realize these priority actions. -
Publication
Public-Private Partnership in Telecommunications Infrastructure Projects : Case of the Democratic Republic of Congo
(Washington, DC, 2011-01) World BankThis paper outlines the role of government in infrastructure Public-Private Partnerships (PPP) in the telecommunication industry in the Democratic Republic of Congo. It also summarizes the state of Congo's telecommunication infrastructure, the advantages of Open Access Network (OAN) as a Broadband PPP Business Model, as well as risks allocated to the implementation of the project and proposes the World Bank Group risk mitigation instruments. -
Publication
More Fiscal Resources for Infrastructure? Evidence from East Africa
(World Bank, Washington, DC, 2007-06) Briceño-Garmendia, Cecilia ; Foster, VivienThis paper evaluates the extent of fiscal resource availability for infrastructure in four East African countries and explores the main options for its expansion. A number of major channels will be examined. The first is the extent to which expenditure is well allocated across sectors, sub-sectors, expense categories, jurisdictions and geographic areas. The second is the extent to which there is scope for improving efficiency by enhancing the operational performance of state owned enterprises (SOEs), restoring adequate levels of maintenance, or improving the selection and implementation of investment projects. The third is the extent to which user charges are applied and set at levels consistent with cost recovery. The fourth is the extent to which private sector participation has been fully exploited as a vehicle for raising investment finance. While it is difficult to evaluate these things very precisely, a number of proxy indicators are used to shed light on the matter. -
Publication
Kenya : Transport Sector Memorandum, Volume 3. Annexes
(Washington, DC, 2003-01-31) World BankThis Memorandum is intended to initiate discussion regarding the appropriate infrastructure strategy and policy direction which will lead to a sustainable transport sector which provides access for people and goods within Kenya and integrates Kenya into the global economy. Unless these two objectives are achieved, the prospects for substantial and continuing social and economic development in Kenya are limired. Large segments of Kenya's population will remain isolated in the rural areas, and the economy will continue as a producer of primary commodities and basic manufactues for domestic and perhaps regional consumption. The report states as the first and most important action to reverse the deterioration in the transport sector, a very major change in the philosophic approach of politicians to the sector is needed. They have to start to treat infrastructure as integral to the economic rather than the political process. Beyond this overarching change in approach, the following should also be considered as needed steps for implementing the strategy: increase private sector investment and management in the ports, airports, railways, and roads systems; reduce the role of the public sector in day-to-day management while retaining core functions for all modes of transportation and increasing public funding; and in terms of financing, rely on performance contracting under either maintenance concessions or long-term performance-based contracts. -
Publication
Kenya : Transport Sector Memorandum, Volume 1. Strategy
(Washington, DC, 2003-01) World BankThis Memorandum is intended to initiate discussion regarding the appropriate infrastructure strategy and policy direction which will lead to a sustainable transport sector which provides access for people and goods within Kenya and integrates Kenya into the global economy. Unless these two objectives are achieved, the prospects for substantial and continuing social and economic development in Kenya are limired. Large segments of Kenya's population will remain isolated in the rural areas, and the economy will continue as a producer of primary commodities and basic manufactues for domestic and perhaps regional consumption. The report states as the first and most important action to reverse the deterioration in the transport sector, a very major change in the philosophic approach of politicians to the sector is needed. They have to start to treat infrastructure as integral to the economic rather than the political process. Beyond this overarching change in approach, the following should also be considered as needed steps for implementing the strategy: increase private sector investment and management in the ports, airports, railways, and roads systems; reduce the role of the public sector in day-to-day management while retaining core functions for all modes of transportation and increasing public funding; and in terms of financing, rely on performance contracting under either maintenance concessions or long-term performance-based contracts. -
Publication
Kenya : Transport Sector Memorandum, Volume 2. Sector Papers
(Washington, DC, 2003-01) World BankThis Memorandum is intended to initiate discussion regarding the appropriate infrastructure strategy and policy direction which will lead to a sustainable transport sector which provides access for people and goods within Kenya and integrates Kenya into the global economy. Unless these two objectives are achieved, the prospects for substantial and continuing social and economic development in Kenya are limired. Large segments of Kenya's population will remain isolated in the rural areas, and the economy will continue as a producer of primary commodities and basic manufactues for domestic and perhaps regional consumption. The report states as the first and most important action to reverse the deterioration in the transport sector, a very major change in the philosophic approach of politicians to the sector is needed. They have to start to treat infrastructure as integral to the economic rather than the political process. Beyond this overarching change in approach, the following should also be considered as needed steps for implementing the strategy: increase private sector investment and management in the ports, airports, railways, and roads systems; reduce the role of the public sector in day-to-day management while retaining core functions for all modes of transportation and increasing public funding; and in terms of financing, rely on performance contracting under either maintenance concessions or long-term performance-based contracts.