Opportunities for Power Trade in the Nile Basin Final Scoping Study January 2004 Joint UNDP/World Bank Energy Sector Management Assistance Programme (ESMAP) CONTENTS Preface.......................................................................................................................vii Acknowledgments.......................................................................................................ix Abbreviations and Acronyms ......................................................................................xi Units of Measure.........................................................................................................xi Overview of the Study and Types of Power Trade...................................................... 1 Overview and Background .............................................................................. 1 Approach of the Study..................................................................................... 2 Current Situation in the Nile Basin .................................................................. 4 Scope for Power Trade ................................................................................... 5 Potential Benefits ............................................................................................ 9 Ways to Trade Power.................................................................................... 12 Conclusion..................................................................................................... 18 Potential for Power Trade in the Nile Basin .............................................................. 19 Introduction.................................................................................................... 19 Resource Endowment................................................................................... 20 Energy Balances ........................................................................................... 23 Existing Generation and Transmission Facilities........................................... 27 Current Demand­Supply and Supply Costs.................................................. 29 Future Demand and Supply .......................................................................... 36 Summary....................................................................................................... 44 Conclusion..................................................................................................... 45 Scope for Power Trade in the Nile Basin .................................................................. 49 Types and Bases for Trade Including Subregional Perspectives.................. 49 General Descriptions of Study Options to Promote Power Trade................. 52 iii Framework for Developing Power Trade in the Nile Basin ....................................... 67 Summary of Main Findings and Options ....................................................... 67 Water Resources and Power ........................................................................ 68 Power Sector Reform.................................................................................... 71 Market Considerations .................................................................................. 76 Policy Concerns ............................................................................................ 76 Technical Concerns....................................................................................... 77 Institutional Concerns.................................................................................... 80 Commercial Concerns................................................................................... 80 Environmental Concerns............................................................................... 82 Framework for Moving Forward .................................................................... 83 Next Steps..................................................................................................... 87 Conclusion..................................................................................................... 87 Reference Documents .............................................................................................. 89 Energy Potential and Balance of the Nile Basin Countries ....................................... 99 Nile Basin Countries' Generation Expansion Plans ................................................ 105 Boxes Box 1.1: Models of International Power Markets............................................13 Box 1.2: Nordel ..............................................................................................14 Box 1.3: Nord Pool.........................................................................................18 Figures Figure 1.1: Reservoir Volumes in Hydropower Systems................................10 Figure 1.2: Combined Hydro-Thermal Generation for Wet Period .................11 Figure 1.3: Combined Hydro-Thermal Generation for Dry Period..................11 Figure 2.1: Key Economic Indicators of Nile Basin Countries........................21 Figure 2.2: Power Generation Potential by Energy Source in the Nile Basin Countries Excluding Dem. Republic of Congo ....................................22 iv Figure 2.3: Total Hydropower Potential in the Nile Basin Countries (GWh/year)..................................................................................23 Figure 2.4: Final Consumption in the Nile Basin Countries by Fuel and Sector..........................................................................................24 Figure 2.5: Primary Energy Use of Nile Basin Countries (Except Democratic Republic of Congo and Egypt) by Resource ...............................25 Figure 2.6: Production of Electricity in the Nile Basin Countries, except Egypt and Democratic Republic of Congo, by Energy Source, 1997............................................................................................27 Figure 2.7: Demand and Generation in 1999, Excluding Egypt (GWh)..........32 Figure 2.8: Electricity Demand Forecast per Country (Excluding Egypt) (GWh/year)..................................................................................37 Figure 2.9: Total Electricity Demand Forecast in Nile Basin Countries (GWh/year)..................................................................................37 Tables Table 2.1: Key Economic Indicators of the Nile Basin Countries ...................20 Table 2.2: Generation Facilities .....................................................................28 Table 2.3: Consumption.................................................................................30 Table 2.4: Demand­Supply Situation in 1999 (Excluding Egypt)...................31 Table 2.5: Average Sales Price of Electricity per kWh for Consumers, Nile Basin Countries...................................................................................34 Table 2.6: Demand Forecasts for 2005 through 2020....................................36 Table 4.1: Study Options ...............................................................................69 Table 4.2: Status of Power Sector Reform in the Region...............................72 Table A2.1: Energy Resources (in physical units)........................................101 Table A2.2: Commercial Energy Potential (GWh/yr)....................................102 Table A2.3: Developed Commercial Electricity Generation .........................102 Table A2.4: Utilization of Potential (Generation as Share of Potential [%])..103 Table A3.1: Burundi Future Generation Expansion .....................................105 Table A3.2: Burundi Future Generation Expansion (High Scenario)............106 Table A3.3: Democratic Republic of Congo-East Generation Projects Envisaged for the SNEL Development Plan.....................................106 v Table A3.4: Egypt Demand Forecasts .........................................................107 Table A3.5: Egypt Required Capacities before 2004 ...................................107 Table A3.6: Egypt Required Capacities, 2004­06 .......................................107 Table A3.7: Egypt Required Capacities, 2007­10 .......................................108 Table A3.8: Ethiopia Future Generation Expansion.....................................109 Table A3.9: Kenya Future Generation Expansion (Interconnected System).............................................................................................110 Table A3.10: Rwanda Future Generation Expansion...................................111 Table A3.11: Sudan Generation Expansion, NEC Development Plan, 1999­ 2005 Option 1: Combined Cycle and Steam .....................................112 Table A3.12: Tanzania Future Generation Expansion .................................113 Table A3.13: Uganda Future Generation Expansion ...................................114 Maps Map IBRD 32740: Opportunities for Power Trade in Nile Basin Countries ....47 Map IBRD 32744: Opportunities for Power Trade in the Nile Basin, Study Options 4, 5, 6, 8,11a, and 11b...........................................................63 Map IBRD 32742: Opportunities for Power Trade in the Nile Basin, Study Option 14.............................................................................................64 Map IBRD 32743: Opportunities for Power Trade in the Nile Basin, Study Options 15 and 16...............................................................................65 Map IBRD 32741: Opportunities for Power Trade in the Nile Basin, Study Options 20 and 21...............................................................................66 vi Preface Recognizing the scope and urgency of their shared problems, the Nile riparian countries have taken a historic step toward cooperation in the establishment of the Nile Basin Initiative (NBI). Formally launched in February 1999, the NBI is a transitional mechanism that provides an agreed framework to fight poverty and promote economic development. The initiative is guided by a shared vision "to achieve socio-economic development through the equitable utilization of, and benefit from, the common Nile basin water resources" and a set of policy guidelines that provide a basinwide framework for cooperative action. Within the framework of the NBI, since 1991, ESMAP has supported Nile riparain efforts to build consensus for coordinated development of the Nile Basin's potential for electric power. This scoping study, completed in November 2000, is the first major output of that effort and reviews the opportunities for power trade in the Nile Basin countries. Under the NBI, the riparian countries have identified regional electricity trade as an important component of their strategy to promote economic development and cooperation in the region. This study represents an initial overview of the opportunities for power trade among the Nile Basin countries. Based on experience from other regions of the world, the potential benefits of power trade at different stages of market development and barriers to regional power trade are identified. This experience, coupled with a review of the energy resource endowment and the power supply demand pattern of the Nile Basin countries, has provided the basis for identifying opportunities for power trade in the Nile Basin presented in this study. The study also proposes that a more focused and coordinated process for discussing the expansion of power trade in the Nile Basin would advance the development of power supply facilities. The study recommends that this objective be realized through the creation of a basinwide forum of national power experts to facilitate continued dialogue in the region. The scoping study is structured in four chapters: (i) an overview of the power sectors of the 10 Nile Basin countries and different types of power trade; (ii) potential for power trade based on the characteristics of the Nile Basin in terms of resource endowments, energy balances, existing generation and transmission facilities, and present and future demand and supply; (iii) scope for power trade in the Nile Basin; and (iv) framework for developing power trade. vii Acknowledgments This report was prepared by Norconsult and Statnett under the guidance of a World Bank team comprising John Besant-Jones, Lead Energy Economist and Task Team Leader; Barbara Miller, Senior Water Resources Management Specialist; Mangesh Hoskote, Senior Power Sector Specialist; and Diane Minogue, Consultant. The authors would particularly like to thank the Nile Basin Council of Ministers, the NBI Technical Advisory Committee, and the NBI Secretariat for their guidance and support. Our gratitude also goes to the national power experts1 from the Nile Basin countries for providing key power sector data and information, and for their useful comments. The authors also would like to acknowledge Mark Tomlinson, Sector Manager of the Africa Energy Unit (currently Country Director for Nigeria); Praful Patel, Sector Director of Africa Infrastructure (currently Vice President, South Asia Region); and David Grey, Senior Water Advisor, for their guidance in the design and development of this study. The report was edited by Grammarians, Inc. Marjorie K. Araya, from the Energy Sector Management Assistance Programme (ESMAP) supervised its publication, printing, distribution, and dissemination. The maps were edited by Gregory Prakas, Cartography Section of the World Bank. 1Burundi: Desire Nzayanga, Salvator Sunzu-Ntigambirizwa; Democratic Republic of Congo: Mumaka Mbulu, Etienne Tshibangu; Egypt: Atared A. Assad, Kamel Yassin; Ethiopia: Gosaye Mengiste, Mensgesha Shiferaw; Kenya: John Githinji, Albert Mugo; Rwanda: Augustin Hategeka, Claude Kayitenkore; Sudan: Amin Osman Bashari, Amin Sabri Ahmed; Tanzania: Vincent Gondwe, David Ngula; and Uganda: Henry Bidasala, Esimu Michael Elimu. ix Abbreviations and Acronyms CEPGL Communauté économique des pays des grands lacs (Great Lakes Economic Community) ESMAP Energy Sector Management Assistance Programme HVDC High voltage direct current KPLC Kenya Power and Lighting Company NBI Nile Basin Initiative SADC Southern African Development Community SADCC Southern Africa Development Co-ordination Conference SAPP Southern African Power Pool SINELAC Société Internationale d'Electricité des Pays des Grands Lacs TANESCO Tanzania Electric Supply Co. Ltd. UEB Uganda Electricity Board Units of Measure Bcm/y Billion cubic meters per year GWh Giga-Watt h hour kgoe kg oil equivalent kV Kilovolt kVA Kilovolt-Ampere MTOE Million tons of oil equivalent MW Mega-Watt TWh Tera-Watt xi 1 Overview of the Study and Types of Power Trade Overview and Background 1.1 Ten countries share the Nile River: Burundi, Democratic Republic of Congo,2 Egypt, Eritrea, Ethiopia, Kenya, Rwanda, Sudan, Tanzania, and Uganda. The Nile Basin countries are fundamentally interconnected through their common interest in the stewardship of the river and its tributaries. The Nile is the link that has brought the countries together to seek mutually beneficial goals through concrete action under the Nile Basin Initiative (NBI).3 The NBI provides a framework for fighting poverty and promoting economic development in the region, based on the basin countries' shared vision "to achieve sustainable socio-economic development through the equitable utilization of, and benefit from, the common Nile Basin Water Resources." Under the NBI, the basin countries have identified development of regional electricity markets as an important component of their strategy to promote economic development and cooperation in the region. 1.2 The Nile Basin's rich resource endowment for electricity generation remains largely untapped. Most of the potential is in hydropower that could be provided by the Nile and its tributaries; there are several important gas fields as well. Power trade is occurring at modest levels among several basin countries and many are either discussing increased power trade or considering developing power trade in the near future. The Nile basin countries' interest in increasing power trade is part of a global trend, as regional electricity markets continue to grow in emerging markets for three reasons: · Power sector reform--globally, the pace of liberalization of the power sector has considerably increased in recent years leading to greater regional cooperation; 2Only the eastern part of Democratic Republic of Congo is evaluated in this report in relation with the power subsector. This part includes South-Kivu, North-Kivu, Maniema, and the Oriental province. There is also a power grid jointly operated by Burundi, Democratic Republic of Congo, and Rwanda in Kivu province, which is not interconnected to Democratic Republic of Congo's national grid. 3Eritrea attended its first NBI meeting in August 2000 and has indicated it will start participating in an observer capacity. The country was not, however, involved in the NBI during the preparation of this report. 1 2 Opportunities for Power Trade in the Nile Basin · Partnerships--regions that share a single natural resource are finding it difficult to harness the energy potential individually, leading to project development with public-private partnerships; and · Complementarity--the location of supply in one country and demand center in other countries provides complementary and mutually beneficial trading arrangements. 1.3 This scoping study represents an initial effort to provide an overview of the opportunities for power trade among Nile Basin countries. Based on experience from other regions of the world, the potential benefits of power trade at different stages of market development and barriers to regional power trade are identified. This experience, coupled with a review of the energy resource endowment and the power supply demand pattern of the Nile Basin countries, has provided the basis for identifying opportunities for power trade in the Nile Basin in this study. The study also proposes a framework for developing regional power markets. 1.4 This preliminary assessment is presented to promote dialogue among the Nile Basin countries and to provide a sound conceptual basis for these countries to assess the benefits of pursuing regional power trade and the framework for moving forward. 1.5 Detailed analysis of existing information on the present and likely future development of the energy and power sectors of the Nile Basin countries has been conducted. This information has been summarized in a series of country-specific draft data reports. Except in the case of Eritrea, these have been reviewed and updated using information provided by national power-sector experts from each of the Nile Basin countries. Approach of the Study 1.6 This assignment was undertaken as a desk study, based on existing available information; the Nile Basin countries were not visited. Almost all information initially used was taken from World Bank documents. A few exceptions were studies, articles, and information gathered from the Internet or otherwise obtained by the Consultant on his own initiative. A draft scoping study was prepared using these and presented at the Power Trade Working Group meeting in Entebbe, Uganda, in December 1999. This meeting was held under the auspices of the NBI and included two national power-sector experts appointed from each country, one representing the Ministry responsible for the power sector and the other the primary utility in the country. 1.7 The parties agreed during that meeting to update the draft scoping study-- producing a draft final scoping study, which was presented and discussed during a second Power Trade Working Group meeting held in Addis Ababa, Ethiopia, from June 29 through July 1, 2000. The updating of the study was achieved by further work related to information and data relevant for the energy sector and power subsector in each Nile Basin country, with the exception of Eritrea. This work was undertaken by national Overview 3 experts in each country who submitted country-specific data to Norconsult International. Using this background information Norconsult International worked out the revised country-specific draft data reports, which constituted the starting point for the draft final scoping study. With regard to Eritrea, all data and information used in the draft were the same as those applied in the draft scoping study. As already indicated, the draft final scoping study was presented and discussed during the working group meeting in Addis Ababa. Some adjustments and clarifications to the study were agreed on; a few additional study options were also indicated. These modifications have been included in this final scoping study, prepared by Norconsult International after the Addis Ababa working group meeting. This final scoping study is also being translated into French. A complete list of documents used is given in appendix 1. 1.8 The only reference document available for Eritrea was a proposed generation and transmission master plan prepared by a consultant in 1993. The quality of the data for Eritrea is consequently poor, leading Norconsult International to come up with its own estimates when necessary. The data received for other countries are of good quality; however, there have been communication problems with Democratic Republic of Congo- East during recent years and as a result, some estimates regarding power production and consumption were undertaken by Norconsult International using information provided by the Democratic Republic of Congo national expert. 1.9 The revised draft data reports for each Nile Basin country were handed over to the respective national experts at the working group meeting in Addis Ababa. The third of these reports includes reviews of the energy resource endowment, energy markets, and the institutional framework of the energy sector. This represents the first step of the approach in analyzing the energy sector for the final scoping study and is performed at an aggregate level primarily to establish the importance of the energy sector in the overall socioeconomic development of the country, the relative importance of the various energy subsectors, and the potential for energy substitution and conservation and energy imports and exports. Based on available information, an energy balance for each country is also established. 1.10 The fourth chapter of the draft data reports includes a detailed analysis of the power subsector. Existing generation and transmission facilities, present supply and demand, current level of power import and export, and institutional framework are summarized in the final scoping study, based on available information and updated data provided by the national experts. Future development is then outlined, including a discussion of the power demand and generation and transmission projects. 1.11 The main findings from the energy sectors and power subsectors at the national level are aggregated to the regional level and presented in chapter 2. They provide general economic indicators, energy resources and balances, demand forecasts, and important present and future power demand and supply characteristics. A map of the region with a single line diagram showing existing generation and transmission facilities is also presented. A possible division of the region into subregions is discussed with regard to the demand­supply situation and power transmission distances. 4 Opportunities for Power Trade in the Nile Basin 1.12 Types and basis for trade, including subregional perspectives, are discussed in chapter 3 in terms of the assessment of the energy resource endowment, existing generation and transmission facilities, and demand and supply characteristics. This chapter also includes generic descriptions of study options that could promote power trade. It should be emphasized that these options are tentative as they are based on a desk study. A screening and discussion of these options, as well as other options and ideas brought forward by the Nile Basin countries, is now pertinent. 1.13 In chapter 4, a discussion framework for developing power trade among the Nile Basin countries is presented. This includes various considerations of a technical, policy, and institutional nature. Water resources and environmental matters are discussed. Future activities within the NBI are also covered in chapter 4. 1.14 The framework for moving forward assumes that power trade will evolve incrementally and will be designed to be mutually acceptable to Nile Basin countries. The discussion framework includes the establishment of a power form, concepts for the development of power trade in the region, and generic project proposals at basin and subregional levels. Consensus was reached on key elements of a proposed Nile Basin power form during the working group meeting in Addis Ababa. It was also agreed that an initial task of this power form would be to advance this final scoping study. Current Situation in the Nile Basin 1.15 There is only a low level of power trade among some of the Nile Basin countries at this time, including export from the national grid in Uganda to the national grid in Kenya and to isolated load centers in Rwanda and Tanzania. The average power export from Uganda to Kenya, Tanzania, and Rwanda during the period 1997­99 was 167 GWh per year, whereas the figure for 1999 was 174 GWh, or about 20 percent of the total sales in Uganda. A 132 kV transmission line connects the Kenya system to the Uganda system at Tororo substation, where sales from Uganda to Kenya are metered. Uganda has been exporting power to Kenya since 1958, when the Owen Falls Power Station and the Tororo-Nairobi 132 kV transmission line were completed and commissioned. This power export is carried out under the Kenya-Uganda Electricity Agreement, signed in 1955, according to which Uganda Electricity Board (UEB) is supposed to supply 30 MW of electrical power to Kenya Power Company for 50 years. Four supplemental agreements to this one have since been signed to determine the tariff at different times. This export has, however, been below the agreed level for long periods owing to capacity constraints in the power system in Uganda. 1.16 In 1993 UEB entered into an agreement with Tanzania Electric Supply Co. Ltd. (TANESCO)--the UEB­TANESCO Electricity Agreement, 1993. Under this agreement, UEB will supply 9 MW of electrical power to the Bukoba region of Northern Tanzania for 30 years. An agreement between UEB and ELECTROGAZ of Rwanda was entered into in 1995. Under this agreement, UEB will supply 5 MW of electrical power to Overview 5 Rwanda, delivered at the Rwanda­Uganda border. Uganda is engaged in negotiations with its three neighbors to increase power trade. 1.17 Power is also imported from Nakonde in Zambia through a 33 kV line to supply Tunduma, Mobozi, and Ileje in Tanzania. There is also export from Democratic Republic of Congo-East to Rwanda and Burundi, because the three countries have jointly developed two hydropower plants in Democratic Republic of Congo. These are the Ruzizi I and Ruzizi II power plants, which have an aggregate installed capacity of 55 MW and a mean annual production of about 289 GWh, comprising 148 GWh from Ruzizi I and 141 GWh from Ruzizi II. During 1999 Rwanda received approximately 70 GWh whereas the import to Burundi was 50 GWh. 1.18 The Ruzizi II power plant is jointly operated and each of the three countries is entitled to an equal production share. The Ruzizi I power plant is operated by SNEL, the power company in Democratic Republic of Congo. According to an agreement with Democratic Republic of Congo, Rwanda can import 3.5 MW from this power plant. Burundi imports power from Ruzizi I based on payment of SNEL's debts to Burundi. The remaining credit at the end of 1999 was about 180 GWh. 1.19 Rwanda also exports power to the Kisoro border region in Uganda. 1.20 Finally there are interconnections from Egypt to neighboring Libya and Jordan. A 220 kV link between Egypt and Libya commenced operation in December 1998; the Egypt-Jordan interconnection, at 500 kV and 400 kV levels through the Sinai and Aqaba Gulf, respectively, was commissioned in September 1998. Scope for Power Trade Introduction 1.21 This section sets out the conceptual framework for power trade with reference to international experience. Conditions of particular importance to obtain the benefits of power trade are presented. The benefits of cooperation among different power systems are also described. 1.22 Current trade in electricity among Nile Basin countries is characterized by bilateral trade between state-owned utilities. This trading pattern was also the case in other regions of the world until recent years. Traditionally, most electricity utilities around the world were vertically integrated entities performing simultaneously the three primary functions of generation, transmission, and distribution. Most of them were more or less self-sufficient in terms of generation in their respective geographical areas. Interconnections with neighboring countries were developed mainly for short-term, non- firm power exchange based on complementarities among generation systems. A reduction in operating reserves and mutual support during emergencies was achieved as an additional benefit. Despite the development of interconnections, self-sufficiency in supply and capacity reserve margins were usually maintained. 6 Opportunities for Power Trade in the Nile Basin 1.23 The benefits that may be gained from utility-to-utility trade are sufficient reason to examine the possibilities of exploiting the hydropower potentials of the Nile for the mutual benefit of its riparians. Furthermore, power sector reform, with its unbundling of power utilities and establishment of competition in the electricity markets, has moved power trade to new dimensions during recent years in some regions. Additional economic as well as environmental benefits are realized through more efficient use of the combined energy resources and demand of larger markets than represented by one nation. The scope for such benefits and exploitation of variations in hydrological regimes and topography appear substantial for the Nile Basin too, not least if the development of larger low-cost hydropower potentials of the Nile could become viable through the creation of larger power markets. This feature is addressed in more detail in chapters 2 and 3, which present the regional energy situation and options for future power trade among the Nile Basin countries. 1.24 There are, however, a number of conditions that need to be considered in order to advance power trade in the Nile Basin area. Experience from other regions of the world4 may illustrate some of them. Power sector reforms 1.25 The sophistication of international power trade differs from region to region, and depends greatly on the level of industrialization and power sector reforms. A common experience is that power trade cannot be seen in isolation from the overall socioeconomic development in general and the power sector restructuring process in particular. Environmental benefits also add substance to power trade initiatives. 1.26 As a rule of thumb, development of international electricity trade is seen as a direct consequence of the ongoing power sector restructuring efforts. This involves vertical unbundling, which unties the distribution function from production and combines transmission with an independent system operation. Regulated third-party access or open access to transmission is introduced. Horizontal unbundling, meanwhile, promotes competition in generation and in distribution. A direct consequence of such restructuring is the search by actors in the market for the cheapest way to access electricity, including imports, if the infrastructure is available. 1.27 It is expected that in the Nile Basin countries, as in other regions of the world, power sector reforms will influence the development of power trade. The framework for power trade in the region, as defined by the institutional framework of the electricity sector including the status of power sector reforms, is presented in chapter 4. 1.28 A particular challenge for the Nile Basin countries is exploiting ways to create regional markets in power, and specifically, deciding whether to establish separate and 4Reference regional markets in power trade include Nordic countries (Nordel); Western European countries (UCPTE); England/Wales-Scotland area; different U.S.-pools such as the New England area (NEPOOL) and the Mid-Continent Area Power Pool (MAPP); the Southern African Power Pool (SAPP); the Greater Mekong area; and the Mercosur area (Argentina, Brazil, Paraguay, and Uruguay). Overview 7 regulated transmission entities. The lack of independent transmission system operators is likely to become a barrier to power trade in the region at some later stage in development. Infrastructure 1.29 Development of power trade requires interconnectors of sufficient capacity. To this end, projects identified in chapter 3 include studies of new interconnectors. In addition, technical standards acceptable to generators and consumers have to be established to ensure acceptable supply security in a regional network. Therefore coordination among national operators is of utmost importance. A power form with representatives from all of the Nile Basin countries could provide the institutional setting for developing such coordination. Institutional requirements 1.30 Bilateral or limited trade of economy energy, such as in the Nile Basin at present, does not require sophisticated institutional frameworks. For greater short-term energy and capacity trade, government support may play a driving role, particularly in the case of government-owned utilities. Development of intensive regional trade could be boosted by pooling arrangements including transit (that is, wheeling) agreements. Where pooling arrangements are set in place, appropriate management structures are required and voting rules need to be introduced to ensure a high degree of consensus on the operation of the pool. Consequently there is a need to develop leadership in regional network development. 1.31 Transmission of electricity, sometimes across national borders, remains a major bottleneck in many regions. Three major conditions seem to be required to overcome this bottleneck. First, transmission should only be a "service" with a specific tariff structure independent from energy prices. Second, as transmission will remain a monopoly within given areas, it should be regulated and international agreements should be discussed among concerned countries so that the transmission regulatory regimes allow international transit. And third, close international coordination between the national control centers of the different transmission companies must be put in place to ensure the technical feasibility of such international transfers of electrical energy. 1.32 Contracts in power trade specify the conditions for supply of energy and transmission services. They can be short-term, affecting the dispatch decisions of the purchaser, or long-term, in which case they also affect investment decisions. The sophistication of trading contracts will depend in part on the ability to monitor trading arrangements. Trade will not develop if contracts cannot be enforced, ensuring payment and reliability. 1.33 Long-term contracts for the supply of bulk power may become a barrier to the introduction of competitive trade in either or both the importing or exporting power market, and approval of such contracts should take account of the cost of foregone competition. For example, a lack of flexibility to reassign part of the generation 8 Opportunities for Power Trade in the Nile Basin purchased under a long-term power purchase agreement will limit the scope for introducing more competition when desirable. Investment climate 1.34 Power trade can develop only in response to overall development requirements in the region--hence a supportive macroeconomic environment is an important element. Financially viable and creditworthy power utilities are required to back investments in a regional grid. Within this framework, the development of regional power markets among the Nile Basin countries presents opportunities to exploit economies of scale when it comes to the development of hydropower resources. Pricing 1.35 Traditionally, the approach to pricing of traded power has been based on the avoided-cost principle with a split of cost savings relative to a situation with no trade. This is typically applicable to bilateral trade arrangements and represents negotiated contracts. The cost of such an administered approach tends to grow with the complexity of trade. A more recent and quite common approach to price setting relies on bids based on marginal cost, as illustrated by cases in England, Chile, and Argentina. 1.36 Nord Pool, the Nordic Power Exchange, represents the most advanced form of power trade. The spot market trade is based on sales and purchase bids from the players. A balance price between purchase and sale bids is established hour by hour. In addition to the spot market trade via Nord Pool, there is a lot of direct bilateral trade between companies. The Nordic case is described in more detail at the end of this chapter. 1.37 It should be noted that England changed its price setting from the marginal cost approach to the Nord Pool bid approach in 2000. The big consumers in Continental Europe also demand the establishment of spot markets according to the Nord Pool approach. 1.38 In many cases of power trade, sophisticated pricing of energy, capacity, and transmission does not exist, though improvements in sophistication are taking place in most regions of the world. Where transmission has not yet been unbundled, transmission services, as a general rule, have not been separately priced. This does not appear to constrain trade in cases of limited exchanges by integrated companies. However, if power sector reforms proceed, the lack of transmission pricing will become a constraint and a system of transparent tariffs for transmission services will have to be introduced to facilitate trade. Cost of power generation 1.39 Whether trade develops will depend on the relative costs of power in neighboring countries. However, comparison of the unit cost of generation and transmission by candidate projects in the region is difficult for a host of reasons, including difficulties in establishing comparable cost estimates, nonconvertibility of currencies, and the need to redesign projects so that their focus shifts from national to regional needs. In order to establish the potential for power trade among the Nile Basin countries, there appears to Overview 9 be a great need to carry out new studies together, in order to establish a common understanding of the cost of alternative supply options. This should also take into account internalized environmental costs and credit for multipurpose benefits accruing to external downstream parties. Environmental concerns 1.40 Environmental and water resource considerations regarding hydropower development in the region are addressed in chapter 4. Potential Benefits 1.41 The potential benefits of power trade among the Nile Basin countries are rooted in cost savings in the supply of power from cooperation as opposed to independent expansion of national power systems. Specifically, such savings may be realized through the following: a reduction in operation costs due to economic power exchange; lower investment costs in additional supply due to least-cost development of energy resources from a regional--as opposed to a national--perspective; spinning reserve requirements as a proportion of peak load; and coincident peak load relative to average load. In addition, these factors enhance robustness in dealing with unexpected events. 1.42 Significant environmental benefits could emerge in this region if regional power trade were developed on a least-cost basis. Such benefits could result from water conservation and land protection effects, and from a reduction in greenhouse gas and other pollutant emissions caused by a shift from thermal to hydropower-based generation. 1.43 Certain power system considerations in relation with these indicated cost savings and environmental benefits are discussed in the following subsections. Hydro-hydro complementarity 1.44 Two (or more) hydropower-based systems are complementary to each other (or one another) in the following cases: · There is a difference in the distribution pattern of water runoff over the year. · There is a difference in hydrology over the years. · There is a difference in reservoir capacity between the systems. 1.45 Such differences often exist when two or more river basins are in question. They result in differences in the marginal cost of power generation by season and by year. From these cost differentials, benefits from power trade can emerge. For example, a system operator can avoid spilling water during wet periods if it can release water as power export. And during dry periods the operator will be able to import power and consequently avoid load shedding or save water. 10 Opportunities for Power Trade in the Nile Basin Hydro-thermal complementarity 1.46 A hydropower-based system has marginal costs of generation based on hydrological parameters. This means that inflow varies over the course of the year and from dry to wet years. Consequently, when the hydropower-based system in some periods has a surplus of energy, water is spilled. In other periods, an energy deficit may in the worst case prevent the hydropower-based system from meeting demand. 1.47 Thermal generation has high variable operating costs relative to a hydropower scheme. Savings in variable operations costs can therefore be achieved by using hydropower when available. 1.48 Figure 1.1 shows typical weekly variations in a year and over a 10-year period for maximum and minimum reservoir volumes in a hydropower plant or system (illustrated by the shaded area). These variations can be exploited through trade for the mutual benefit of the exporter and importer, if the other country has a thermal unit whose output can be replaced when water is available at the hydropower plant. Figure 1.1: Reservoir Volumes in Hydropower Systems 100% Maximumlast10 years 80% 60% 40% 20% Minimumlast 10 years 0% 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 Weekno. 1.49 Figure 1.2 shows the operation of a thermal power system with a hydropower system and how the operation is optimized during a wet period. As the marginal cost of power in the hydropower-based system is virtually zero during a wet period, it is profitable to replace comparatively expensive thermal power with cheap hydropower (illustrated in the diagram as "hydro import") during periods of peak load. Overview 11 1.50 Figure 1.3 shows the same situation during a dry period. In this case, the short-run marginal cost (avoided cost) of hydropower is high (the availability of hydro-energy is relatively low) and it will be profitable to sell some thermal power to the hydropower- based system during off-peak periods. The producer of thermal power will be able to reduce unit-variable operating costs by maintaining the same level of output throughout the 24-hour period. Figure 1.2: Combined Hydro-Thermal Generation for Wet Period MWh/h Load Hydro import Thermal base load 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours Figure 1.3: Combined Hydro-Thermal Generation for Dry Period MWh/h Load Hydro import Thermal Thermal export export Thermal base load 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours 12 Opportunities for Power Trade in the Nile Basin 1.51 Some thermal plants have high start-up costs, while hydropower-based plants or systems have comparatively low start-up costs. To cover a short-term increase in demand, it will often be less expensive for an operator of a thermal-based system to purchase power from a neighboring hydropower-based system than to start up another thermal unit. Mutual assistance in case of disturbances and maintenance 1.52 In case of short-term maintenance or forced outages a system operator can buy power from a neighboring system instead of applying load-shedding or starting generators out of merit order. Reduced reserve capacity 1.53 In an environment without any trading of power, each system has to be self- sufficient. Consequently the combined investments in capacity are higher and system reliability lower than if both systems could benefit from trade. An interconnected system with trading capabilities improves the possibilities for mutual assistance during extreme situations such as an exceptionally dry year, shortage of fuel, or forced outages of units in one system, and thus reduces the need for combined reserve capacity. Economies of scale in new generating capacity 1.54 A small power market cannot benefit from economies of scale in large-scale power generation alternatives because there is not sufficient purchasing power to exploit the full capacity of the project. In other words, a low capacity-utilization factor results in a low return on capital invested--at least in the early years until demand picks up. By combining two or more small power systems through interconnection, the combined power demand can become sufficient to make an investment in a relatively large low-cost hydropower plant economically viable. Ways to Trade Power 1.55 In most regions of the world, power trade has gone through phases, from bilateral trade to third-party access and open access, to fully competitive markets, often termed power pools. Models of power trade in use around the world are outlined in box 1.1 1.56 The Nordic power trade experience could provide valuable lessons for the Nile area. Norway and Sweden opened their electricity markets but maintained public majority ownership in the sector. This proves that a key to successfully increasing electricity trade is to establish an appropriate market structure rather than changing to private ownership. However, creating effective competition among generators is difficult where one or few hold significant market power. Trade, and where possible, a joint marketplace across borders, can reduce the control of large generators. Overview 13 Box 1.1: Models of International Power Markets Vertical Integration (Single Buyer). In a directly to distributors and large consumers. single-buyer market, a single entity, for Under the negotiated third-party access instance a government utility, purchases model, most exchanges would still be based power from all producers on a contractual on long-term contracts. basis. This approach does not require a radical Open Access. An open access market is a separation of integrated utilities or significant regional competitive market in generation power sector reform. The Southern African and distribution allowing any producer to Power Pool began operations using this sell directly to any distributor or bulk framework. consumer. Generation, transmission, and Vertical Integration with Bilateral Wheeling distribution are unbundled. Access to Contracts (Negotiated Third-Party Access). transmission needs to be regulated, and This model implies that the transmission pricing policies compatible, transparent, and system is open to independent power efficient. Nord Pool is an example of such a producers so that they can wheel power competitive power exchange. 1.57 When Norway introduced a new energy act in 1991 and opened its market to free competition (as the first Nordic country to do so), this unilateral reform affected the electricity exchanges among the countries of the network, especially with Sweden. Trade resumed and even expanded upon implementation of a similar reform in Sweden. Apparently, parallel developments in power sector reform of countries with power trade are preferable to maintain balance. The development of competitive markets in the region took a long time and went through all the phases mentioned. (Box 1.2 describes Nordel, the Nordic body of cooperation for energy system operators.) 1.58 The same lesson is being experienced in the Southern African Power Pool (SAPP), which was established in 1995 through the Inter-Governmental Memorandum of Understanding signed by 7 of the 11 members of the Southern African Development Community (SADC). The members of SAPP are all vertically integrated national utilities undergoing various degrees of power sector reform. This power pool is the product of a long-term, coordinated regional approach to the power sector in southern Africa under the sponsorship of the SADC and its predecessor, the Southern Africa Development Co- ordination Conference (SADCC), established in 1980. 1.59 International power markets do tend to evolve over time as economies grow and demand increases, and as reforms in the power sector facilitate infrastructure and national market development. In addition, trading partners build confidence in working together to gain benefits and solve problems. However, there is no rule that says a regional market has to go through all phases as experienced in most regions. 14 Opportunities for Power Trade in the Nile Basin Box 1.2: Nordel Nordel is a body for cooperation Fostering international cooperation; among system operators in the and Nordic countries. The association Maintaining contacts with other also serves as a forum for technical actors, organizations, and the cooperation and coordination among authorities within the power sector. these countries' system operators Nordel's highest decisionmaking and actors. This informal body is the annual meeting, which organization has paved the way for encompasses leading individuals the competitive market now in from the Nordic system operators as operation. well as representatives of other Nordel's primary goal is to create participants in Nordel's work. prerequisites for and develop an The association has no budget. Its efficient Nordic electricity market. It executive body is the Executive gives advice and recommendations. Board, composed of one In August 1998, the association representative of the system adopted new bylaws, which were operators in each country, as well as accommodated to the new conditions two representatives of the other that prevail on the joint Nordic actors. The Executive Board makes market. initiatives and decisions on topical issues and implements the decisions Nordel's tasks fall mainly into the taken at Nordel's Annual Meeting. following categories: Much of Nordel's work is carried System development and rules for out by committees and working network dimensioning; groups made up of technical System operation, reliability of specialists from the various sectors operation, and exchange of information; involved in cooperation within Nordel. Establishing principles of pricing for network services; No trading 1.60 This scenario is characterized by a monopolistic system, in which the power subsector in each country is organized in one or a few vertically integrated companies. There is either no interconnection or only weak interconnections among the power grids of these companies. The customer can only obtain electricity from one utility. There is no national or international trading among the utilities, all of which are self-contained, and all costs can be passed to the end user or are covered by government funds. Overview 15 Trading with occasional (non-firm) power from utility to utility 1.61 This variation is also characterized by a monopolistic system, in which the power subsector in each country is organized in one or a few vertically integrated companies. There may also be some independent power producers. 1.62 Power may be traded among utilities occasionally, on a national as well as international basis. The transaction is often approved over the phone and can be started and concluded at any time. The utilities responsible for trade across national borders often apply the "mean price principle," which means that the average of the marginal costs calculated for an hour of operation in the various systems forms the basis for the price of power transmitted over the border. In such a monopolistic system, consumers and power producers can only do business with one utility. Trading with firm power from utility to utility 1.63 This one is also characterized by a monopolistic system in which the power subsector in each country is organized in one or a few vertically integrated companies. There is a monopoly market where consumers and power producers can only do business with one utility. There may also be some independent power producers. 1.64 Firm power can be traded from major utility to major utility. Important parameters are price, quantity, and time of use, and the trade is regulated by long-term contracts. There will often be a mix of firm power contracts and non-firm power contracts of varying duration. Mutual support contracts related to operating reserve, emergency energy, control area services, and scheduled outage energy are also possible. The latter will often be based on "gentleman's' agreements"--that is, the support is reimbursed in energy and not in cash. In case of transmission limitations, firm power contracts have priority over non-firm contracts. Eligible third-party access 1.65 This scheme has an environment in which large independent power producers and large consumers can trade with others and not only with the utility. The power subsector in each country is still organized in one or more vertically integrated companies. Transmission facilities are open to negotiated or regulated third-party access for large producers and consumers. Vertically integrated companies have to keep separate accounts for these players. 1.66 This market structure is typical in an early stage of sector unbundling, including privatization and competition in the power subsector. Decentralized trading--open access trading 1.67 Decentralized trading is characterized by a system with open access both for consumers and producers. Within their franchise areas, distribution companies have the obligation to connect all end-users and to offer distribution services on nondiscriminatory terms. Thus the consumers are free to buy power wherever and from whatever supplier they want. Consumers and power producers are allowed to trade, and they buy 16 Opportunities for Power Trade in the Nile Basin transmission capacity from a grid company. This gives open access on equal terms to everyone to transmit power through all transmission and distribution networks. Power can be traded bilaterally, in a common spot market or a combination of those. Experience of the Nordic countries History 1.68 The Nordic countries have cooperated in the area of electricity for more than 80 years, in the early years in a very limited fashion through bilateral trade mostly between Norway and Sweden. 1.69 Since 1963, when Nordel was established, the Nordic countries have cooperated more closely to exploit their combined energy resources and thereby ensure that the supply of electricity is environmentally friendly, efficient, and reliable. 1.70 The cooperation faced a new challenge when, in 1991, Norway adopted a new, market-oriented energy act. Norway was the first of the Nordic countries to deregulate its electricity market, open it for competition, and establish a power exchange. Sweden and Finland followed, and in Denmark the electricity market opened fully for all customers in 2002. 1.71 In 1995, the Nordic ministers of energy agreed to increase cooperation to develop a common electricity market. One area of concern was the dominant position of some of the generating companies of these countries. A common electricity market would significantly reduce their dominance and guarantee better competition. Following the deregulation and development of a regional power market, experience shows that unbundling of the electricity sector is taking place faster than most experts expected beforehand. Process of deregulation 1.72 A first step in Norway's deregulation process was to separate the grid activities from the electricity production. The grid thus became a "neutral, natural monopoly" subject to regulation by public authorities. This established a neutral and nondiscriminatory transmission grid, which is available to all players--in other words, open access. 1.73 By opening the entire network (also the regional and local distribution networks) and introducing a separate network tariff (point of access tariff) for grid supply and consumption, competition among players in the electricity market is established. 1.74 A system operator is appointed for each electricity system in the Nordic grid: Statnett in Norway, Svenska Kraftnet in Sweden, and Fingrid in Finland and Denmark. Eltra and Elkraft (since 1998). The transmission system operators bear the responsibility for ensuring the physical framework for a well-functioning electricity market and own and operate the high-voltage grid and the main interconnections to neighboring countries. The transmission system operators do not own generating plants themselves, excluding some capacity for emergency use. Overview 17 1.75 The transmission system operators have to ensure that the system always is in balance--that is, that production plus import corresponds to consumption plus export at any second around the clock. Accordingly, the transmission system operators must make sure that the system disposes of sufficient regulating power and reserve capacity, which can eliminate imbalances due to forced outages, unexpected fluctuations in consumption, and fluctuations in, for instance, the production of wind and solar energy. 1.76 Normally the transmission system operators purchase reserve capacity and regulating power directly from the market players or on a special regulating power market. The transmission system operators may require that certain units be regulated up or down in case of system imbalances. 1.77 The transmission system operators also plan and carry out the necessary expansion of the transmission network, including the connections to neighboring areas, in time and in accordance with market requirements. Thus the transmission system operators must ensure that the number of transfer constraints in the system are as low as possible. 1.78 The transmission system operators treat all players neutrally and in a nondiscriminatory way. They make information available to all the players on transport capacity in the network, as well as transfer bottlenecks, forced and scheduled outages, and the prices of transport services (tariffs). Market 1.79 The Nordic electricity market combines direct trading between players (bilateral trade) and trading via the Nordic Power Exchange, Nord Pool (see box 1.3). The trade, which takes place via the power exchange, is still increasing. 1.80 The primary source of electricity production differs considerably among the Nordic countries, as it does in the Nile Basin countries. In Norway, nearly all electricity is generated from hydropower. Sweden and Finland use a combination of hydropower, nuclear power, and thermal power. Denmark mainly uses conventional fossil fuel­based thermal power, but wind power is increasingly used. 1.81 Several interconnections (overhead lines or submarine cables) link the Nordic countries to one another as well as to other countries in continental Europe. In the years ahead, several planned cable projects are expected to bring the Nordic countries even closer to the continent. 18 Opportunities for Power Trade in the Nile Basin Box 1.3: Nord Pool Nord Pool--the Nordic Power delivery during the next 24-hour Exchange--is the world's only period. multinational exchange for trading The spot market's system price is electric power. Established in 1993, the reference price for settling Nord Pool is owned by two national power trade on Nord Pool's futures grid companies: Statkraft SF in market and also serves as a price Norway, Svenska Kraftnet in signal in the Nordic countries. Sweden. It is intended that Fingrid of Finland become part owner as The futures market is a purely well. financial market for price hedging, risk management, and trade in The main products of the power forward and future power contracts. exchange are spot trading, financial Increasingly, the trend is that both contracts, and clearing services. Nordic and European financial The physical market offers trade in institutions trade forward contracts power contracts for physical on the power exchange. Conclusion 1.82 The scope for power trade in the Nile Basin countries appears to be significant. Experience from other regions of the world, however, indicates that the extent to which such trade will materialize depends on a number of factors including the region's general economic development, existing power sector infrastructure, energy resource endowment, and institutional framework, including power sector restructuring. 1.83 The potential for power trade as defined by the existing infrastructure, the energy resource endowment, candidate power projects, and expected growth in electricity demand are addressed in the next chapter. 2 Potential for Power Trade in the Nile Basin Introduction Contents of the chapter 2.1 This chapter presents characteristics of the Nile Basin that are relevant to identifying the potential for power trade in the region. To this end, the country-specific information in the draft data reports has been combined to show regional totals. The regional data and analysis are presented in this chapter as well as chapters 3 and 4. The draft data reports also contain an overview of the water resources and the environmental and physical development features of the Nile River and its basin. The geographic setting was briefly described in those reports and will not be repeated here. 2.2 This chapter starts with a brief overview of the economic setting of the 10 Nile Basin countries, followed by a description of energy resource endowments, with emphasis on the potential for power production. The regional energy balance is then presented with comments on the structure of energy consumption and energy supply/conversion by energy carrier. 2.3 The power sector presentation includes a description of existing generation and transmission facilities. Map IBRD 32740 showing power plants and the transmission network for the region is presented at the end of the chapter for easy reference and overview of existing facilities. A summary of available supply costs has also been included, along with a discussion on future demand and supply and the scope for power trade. Interesting study options are outlined here and further discussed in chapter 3. Finally, possible groups of countries or natural subregions within the Nile Basin in the context of the power subsector and power trade specifically are also outlined. Economic setting 2.4 The Nile Basin countries vary in size, demographic characteristics, and topography--and to some extent, economy. Most, however, have a very low production level of goods and services in common, and consequently are classified as least- developed countries. Table 2.1 shows the countries' land area, population, GDP per capita, access to electricity, and electricity use in 1999. Data for all countries except 19 20 Opportunities for Power Trade in the Nile Basin Eritrea are up to date. The data for Eritrea are old and the electricity use figure is estimated by Norconsult International. The table's figures for Democratic Republic of Congo represent the whole country; however, only the eastern part of the country and the power grid common with Burundi and Rwanda are relevant for this study. It has not been possible to find representative figures only for this part of the country. Table 2.1: Key Economic Indicators of the Nile Basin Countries Country Land area Population GDP Access to Electricity (1,000 km2) (million) per capita electricity Use (USD) (%) (kWh p.c.) Burundi 28 6.3 140 2 17 Congo, Dem. Rep. 2,350 50.3 100 1-6 110 Egypt 1,000 63.5 1,200 98 900 Eritrea 94 4.0 230 -- 43 Ethiopia 1,222 61.7 124 10 21 Kenya 583 28.7 279 9 153 Rwanda 26 8.0 230 2 25 Sudan 2,506 33.0 263 15 70 Tanzania 945 30.5 130 10 75 Uganda 241 22.0 330 5 36 --. Not available. Source: Power experts of the Nile Basin countries. 2.5 Egypt is more developed than the other countries of the Nile Basin, both in terms of the economy in general and access to and use of electricity specifically. Another difference is the size of the countries, both in terms of land area and population. GDP per capita, electricity use, and access to electricity are shown in figure 2.1. Resource Endowment Regional overview 2.6 The energy resource endowment of the region is largely undeveloped, but has the potential to create supply far in excess of its current energy needs. These sources include biomass, hydropower, hydrocarbons, and geothermal resources as shown in the tables in Appendix 2. 2.7 Data on the reproductive capacity of the forests in the region are incomplete and do not provide a representative picture. Information available on forest reserves indicates a stock of wood fuel in excess of 30 billion m3, with Democratic Republic of Congo accounting for about 80 percent of the total. Potential for Power Trade 21 Figure 2.1: Key Economic Indicators of Nile Basin Countries 1400 100 90 1200 80 1000 GNP per capita, 1998 (left y-axis) 70 capita kWh per capita (left y-axis) 60 800 per Access to electricity 1999 (right y-axis) 50 kWh population 600 of and 40 % USD 400 30 20 200 10 0 0 Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Dem. Rep. Source: Power experts of Nile Basin countries. 2.8 The technically exploitable hydropower potential is estimated at about 150,000 MW, with Democratic Republic of Congo accounting for 100,000 MW. Excluding Democratic Republic of Congo, the total hydropower potential of the region is more than 46,000 MW. 2.9 Reserves of crude oil have only been discovered in Democratic Republic of Congo, Egypt, and Sudan, with a total resource endowment of 624 million tons of oil equivalents (MTOE). 2.10 The region appears to be gas prone, with proven reserves of natural gas in Democratic Republic of Congo, Egypt, Sudan, Ethiopia, and Tanzania. The estimated recoverable reserves of natural gas are 1,475 billion cubic meters or approximately 1,300 MTOE. The gas reserves are to an increasing extent being exploited, notably in power generation in Egypt. In Tanzania, the Songo-Songo field off-shore of Dar es Salaam is being developed and will eventually feed installed thermal capacity in the capital. Recent studies for development of the Calub field in Ethiopia have also been made. The region also has proven reserves of methane, found in Lake Kivu. There are indications of coal bed methane as well, but information on proven reserves is not available in the source material of this study. 22 Opportunities for Power Trade in the Nile Basin 2.11 Coal reserves have been identified in Democratic Republic of Congo, Egypt, Ethiopia, Kenya, and Tanzania, with a combined total of somewhat less than 500 million tons. The coal reserves are in many cases of a low grade, with high ash content. 2.12 Geothermal resources are available primarily in Ethiopia and Kenya, with commercially exploitable potentials in some of the other Nile Basin countries. The region's total identified exploitable potential of geothermal resources is estimated at 2,540 MW. Electricity generation potential 2.13 In order to indicate the potential of electricity generation by the primary sources of energy in the region, the commercial resource endowment has been converted to a possible annual power generation by applying a set of assumptions. For the hydropower potential, estimates from country reports have been applied when available. Otherwise, a load factor of 50 percent has been assumed, except Egypt for which 75 percent has been used. For all hydrocarbon resources--that is, crude oil, natural gas, and coal--a depletion period of 40 years of the reserves has been assumed and thermal plant efficiencies of 35, 58, and 33 percent for oil, gas, and coal, respectively, have been applied. Geothermal generation is based on resource estimates available and a load factor of 0.75. Resulting from the above exercise, the energy potential for electricity generation in the region is 1,000 TWh/year, or equal to a sustainable generation for the next 40 years of almost 15 times the present generation in the area. Excluding Democratic Republic of Congo, the power generation potential of the Nile Basin countries for about half a century is probably about 550 TWh/year, of which natural gas and hydropower represent approximately even shares of 40 percent each (figure 2.2). Figure 2.2: Power Generation Potential by Energy Source in the Nile Basin Countries Excluding Dem. Republic of Congo Source: Power experts of Nile Basin countries. Potential for Power Trade 23 2.14 The long-term sustainable potential of hydropower alone (excluding Democratic Republic of Congo) is calculated at 209 TWh/year (see figure 2.3, which shows the share of Democratic Republic of Congo as well). Figure 2.3: Total Hydropower Potential in the Nile Basin Countries (GWh/year) 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Dem. Rep. Source: Power experts of Nile Basin countries Energy Balances Energy use 2.15 Energy consumption of Nile Basin countries is about 85 million tons of oil equivalents (MTOE) per year.5 On average, this is equivalent to an annual consumption of only 300 kg of oil per person for the entire population of some 300 million people in the region. 2.16 Most of the energy consumed is from traditional fuels--wood fuel, peat, crop residues, and dung used for cooking and heating by households. The technologies applied are open fire and primitive stoves. As a result of this consumption pattern, the usage efficiency of energy content in the fuels is probably only about 10­20 percent in most cases. And since two-thirds of the total energy used in the region is from traditional fuels, the energy use among the Nile Basin countries is extremely inefficient. Since commercial 5Energy data for the region combined are only tentative. See the table note in appendix 2.2. 24 Opportunities for Power Trade in the Nile Basin fuel use is inefficient as well,6 the usage efficiency of energy in the Nile Basin countries is on average not more than 100 kg oil equivalent (kgoe) per person. 2.17 With the exception of Egypt, traditional energy consumption patterns have by and large been maintained by people moving from rural to urban areas. Consequently the pace of forest resource consumption around urban areas, either directly as wood fuel or indirectly as charcoal to reduce transportation costs, has exceeded the forests' reproductive capacity. Exacerbated by forest clearing for the growing population in need of arable land, deforestation is taking place around many of the urban centers in the region. Switching fuel use to commercial energy carriers, notably electricity, could save the forests and would in many cases prove economically feasible, but is not taking place to a great extent owing to lack of cash income and affordable financing. 2.18 The annual consumption of commercial fuels by the Nile Basin countries is about 30 MTOE. Petroleum products account for 70 percent of this total, electricity 20 percent, and natural gas 10 percent. The use of energy by sector is illustrated in figure 2.4. Figure 2.4: Final Consumption in the Nile Basin Countries by Fuel and Sector Source: Power experts of Nile Basin countries 6Measured in terms of useful energy, the relative importance of commercial fuels increases substantially, as the efficient use of energy in traditional fuels is much lower than for commercial fuels. For petroleum products (mostly used in transportation and industry) efficient use typically ranges from 30 to 40 percent and reaches 100 percent for efficient electricity use. Potential for Power Trade 25 2.19 Traditional fuels are almost entirely consumed by "other sectors" including rural and urban households. Only 6 percent of traditional fuels are used by industry. The main users of petroleum products are transportation, industry and residential households, with 40 percent, 35 percent and 15 percent of total petroleum products consumption, respectively. Electricity is consumed by industries with 50 percent and households with 45 percent. Natural gas is only used in Egypt, where around 60 percent of total production from domestic natural gas fields are supplied for power generation, and the remaining are either 20 percent for industry, 10 percent for transformation losses or 5 percent for households. 2.20 Egypt's energy situation is quite different from that of the other Nile Basin countries. Ninety-five percent of all energy the country consumes is from hydrocarbons and hydropower--in other words, commercial fuels. Furthermore, the consumption of commercial fuels by Egypt accounts for more than 75 percent of total commercial fuels used in the region. The country's energy pattern thus dominates the regional picture of commercial energy consumption. Adjusting for this, and also excluding Democratic Republic of Congo (as the energy balance available is outdated and is for the country as a whole and not for the Kivu Province with which this study is concerned), the representative consumption pattern of the Nile Basin countries excluding Egypt and Democratic Republic of Congo are shown in figure 2.5. Figure 2.5: Primary Energy Use of Nile Basin Countries (Except Democratic Republic of Congo and Egypt) by Resource 60,000 50,000 40,000 30,000 000 EOT20,000 10,000 0 Biomass etc. Coal Crude oil Petroleum Natural Gas Hydro Geotherm. Electricity products Solar etc. -10,000 Indigenous production Imports Exports incl. marine bunkers and stock changes Source: Power experts of Nile Basin countries. 26 Opportunities for Power Trade in the Nile Basin 2.21 The figure clearly demonstrates that the Nile Basin countries, except Egypt, are predominantly subsistence agrarian societies with a small industrial sector often located in enclaves around urban areas. Excluding Egypt and Democratic Republic of Congo, traditional fuels represent close to 90 percent of total energy consumed (88 percent in 1996), petroleum products account for 10 percent, and electricity only 1 percent. Measured by usage efficiency, the relative importance of petroleum and electricity increases as the efficient use of the energy content in these resources is higher than for traditional fuels. Particularly for electricity, usage efficiency is high. The energy balances data thus easily can mislead one to underestimate the importance of electricity in the region. Nonetheless, in all the Nile Basin countries except Egypt, the extent of electrification is very modest: Less than 10 percent of the population--and in the least electrified country, Burundi, only 2 percent--has access to electricity. Energy supply and conversion 2.22 The primary energy supply of the region was 112 MTOE in 1996, breaking down as follows: indigenous production (129 MTOE) and imports (9 MTOE) minus exports, which included marine bunkers (26 MTOE). The bulk of the region's energy exports are exports of crude oil and refined products from Egypt. Excluding Egypt and Democratic Republic of Congo for reasons explained above, the energy supply picture of the region is as presented in figure 2.5. 2.23 Typically, biomass is harvested locally for domestic use. The traditional fuels in biomass represent 60 percent of total primary energy supplied in the region. When Egypt and Democratic Republic of Congo are excluded, the share increases to 90 percent. 2.24 Among commercial fuels, petroleum and petroleum products dominate the picture, representing more than 80 percent of total modern fuels supply. Hydropower represents 10 percent and geothermal 5 percent. Coal is a primary source of energy in the region to a very little extent. 2.25 Petroleum products are provided directly through imports or through imports of crude oil refined locally. A small portion of petroleum products is re-exported. The dependence on imports of petroleum and petroleum products by the Nile Basin countries, except Egypt, exposes the region to fluctuations in the international oil price. The landlocked countries in the interior also face a long on-shore haul for their supplies of petroleum products, which adds cost and insecurity in supplies. This exposure is a reason for Nile Basin countries to exploit possibilities of indigenous energy production so that they can secure supplies and minimize impacts of external decisions beyond their control. 2.26 Hydropower represents a small portion of primary energy supplied (only 1 percent), but dominates generation of electricity. Out of a total electricity production in the Nile Basin countries (excluding Egypt and Democratic Republic of Congo) of some Potential for Power Trade 27 12.7 TWh in 1997, approximately 75 percent was from hydropower. The rest was from conventional thermal power plants (20 percent) and geothermal generation (5 percent).7 Existing Generation and Transmission Facilities Power generation 2.27 Figure 2.6 shows how much electricty is produced in the Nile Basin countries excluding Egypt and Democratic Republic of Congo. Inventories of existing generation facilities are presented in the country-specific draft data reports. These include information on installed capacity, type of generation, year of commissioning, and so on. Annual energy production is also given for hydropower generation facilities. For most countries or projects this is average or mean annual production, but for some countries only firm energy production was given, and these data were used in such cases. All information is updated and refers to 1999 (except for Eritrea as previously mentioned). The Ruzizi II power plant in Democratic Republic of Congo is run jointly by Burundi, Democratic Republic of Congo, and Rwanda, and installed capacity and annual energy production are shared equally. Table 2.2 summarizes thermal and hydropower for each country and total installed capacity for the supply of isolated networks (insignificant for most of the countries). Figure 2.6: Production of Electricity in the Nile Basin Countries, except Egypt and Democratic Republic of Congo, by Energy Source, 1997 Source: Power experts of the Nile Basin countries. 7National data from country reports combined with energy balance data. The energy balance data underreport the electricity generated--10 TWh in 1996 compared to 12.7 TWh in 1997 from national data. 28 Opportunities for Power Trade in the Nile Basin Power transmission 2.28 Information related to power transmission has also been updated. Brief descriptions of transmission facilities are given in the country-specific draft data reports. Table 2.2: Generation Facilities Country National network Installed Isolated Total Annual capacity (MW) networks country production Thermal Hydro Total installed installed national capacity capacity network (MW) (MW) hydro (GWh) Burundi 6 37 43 4 47 160 Congo, Dem. Rep. 0 37 37 55 92 195 East Egypt 12,047 2,810 14,857 484 15,341 12,210 Eritrea 30 0 30 0 30 0 Ethiopia 26 372 398 59 457 1,822 Kenya 282 595 877 9 886 2,826 Rwanda 2 34 36 0 36 145 Sudan 331 307 638 135 773 1,443 Tanzania 203 557 760 29 789 2,698 Uganda 0 196 196 2 198 1,275 Total 12,927 4,945 17,872 777 18,649 22,774 Source: Norconsult International Study Nile Basin power grid and regional overview 2.29 All existing generation and transmission facilities are indicated in map IBRD 32740 at the end of this chapter. This map gives an overview of the structure of the existing transmission and generation facilities in the Nile Basin countries. It is digitized and can easily be updated if desired. 2.30 There is at present an interconnected network covering Democratic Republic of Congo-East, Burundi, and Rwanda. As indicated in table 2.2, this represents less than 1 percent of the generating capacity in the region. There is, however, a long tradition for common operation of this network. The major part of the generating capacity in this grid is hydropower; thermal facilities are used for emergency purposes for the most part. 2.31 The national power grid in Tanzania, which represents about 4 percent of the installed capacity in the region, is isolated from all other basin countries. It contains both hydropower and thermal facilities; hydropower is the most important source, with about 73 percent of the total installed capacity. Potential for Power Trade 29 2.32 There is a comparatively strong interconnection between Kenya and Uganda, whose grids are interconnected between Tororo and Lessos substations through a 132 kV transmission line. These two countries account for about 7 percent of the total installed capacity in the region. The distance from the Kenya-Uganda system to the grid in Tanzania is about 200 kilometers and somewhat more to the Democratic Republic of Congo-Kivu­Burundi­Rwanda grid. Uganda supplies the Bukoba region in northern Tanzania. The peak load is up to 9 MW, according to the supply agreement between UEB and TANESCO. There is also power exchange between Uganda and Rwanda. The national grid in Uganda is almost entirely based on hydropower, whereas the grid in Kenya contains both hydropower and thermal generation facilities, of which hydropower is the most important with approximately 68 percent of the total. 2.33 The Ethiopian grid represents about 2.5 percent of the installed capacity and is isolated. Almost all generation facilities are hydropower. Distances to the grids in Sudan and Eritrea are about 500 kilometers, whereas the distances to the grids in Kenya and Uganda are approximately double that. 2.34 The grid in Sudan is also isolated with a distance to the Egyptian grid of approximately 800 kilometers. The grid in Eritrea is simple and is about 300 kilometers from the Sudanese grid. The Eritrean grid is entirely based on thermal generation, whereas the generating facilities in Sudan are almost equally divided between thermal and hydropower generation. 2.35 The grid in Egypt represents more than 80 percent of the installed capacity in the region and is well developed with a strong 500 kV transmission line from Aswan to Cairo. The hydropower generating facilities in this grid make up about 19 percent of the country's total generating capacity. Current Demand­Supply and Supply Costs Historic and current demand 2.36 Table 2.3 provides the following information on a country-by-country basis: the period for which statistics were available for the first desk study, average annual growth rates during the same periods, and consumption in the national network for 1999 (the figures for Egypt and Kenya represent fiscal year 1998/99). The historic consumption figures for the period covered by the first desk study have been updated to include information for 1997, 1998, and 1999. The data for Democratic Republic of Congo-East is also far from satisfactory, owing to communication problems in that part of the country as previously mentioned. Additional consumption in isolated networks is also indicated as a percentage of the consumption in the national grid. 2.37 The consumption in Democratic Republic of Congo-East for the centers covered by the main grid has been estimated at approximately 100 GWh for 1999 based on statistics from 1997 and 1998. The generating facilities not that do not belong to the main grid in this part of Democratic Republic of Congo are significant in size; their 30 Opportunities for Power Trade in the Nile Basin corresponding generation is therefore of importance, but the statistical data do not allow any quantification. 2.38 The calculation of the 1.5 percent consumption in isolated networks for Ethiopia is based on average annual generation in these networks. Table 2.3: Consumption Country Years with Average Domestic Consumption Each statistics growth consumption in isolated country's (%) in national networks share network, (%) (%) 1999 (GWh/yr) Burundi 85­97 2.5 102 6.9 0.15 Congo, Dem. Rep. 80­88 17.4 100 n.a. 0.15 East Egypt 88/89­ 5.7 56,504 1.0 85.36 97/98 Eritrea 83­92 1.0 171 n.a. 0.26 Ethiopia 80­95 7.2 1,306 1.5 1.97 Kenya 92/93­ 4.0 3,695 0.6 5.58 97/98 Rwanda 85­92 6.2 131 0.0 0.20 Sudan 85­91 2.7 1,510 12.0 2.28 Tanzania 80­97 7.0 1,960 3.0 2.96 Uganda 86­97 11.2 714 0.1 1.08 Total 66,193 100.00 Source: Norconsult International Study 2.39 Consumption figures for Sudan and Tanzania were not available for 1999. Production figures were, however, available for both countries for 1999 and consumption has been calculated based on these, assuming the same percentage of losses as for 1998. 2.40 An important aspect is each country's share of the total consumption. Egypt alone has more than 85 percent, whereas Burundi, Democratic Republic of Congo-East, Eritrea, and Rwanda together have less than 1 percent of the total. Kenya is the second-largest with 5.58 percent. Current demand/supply situation Current situation 2.41 The year 1999 was chosen to represent the "current situation" in this study. Production and consumption figures were available for all countries except Eritrea for Potential for Power Trade 31 this year, with the insignificant reservation about the figures for Sudan and Tanzania (already explained). The figures for Eritrea were estimated by Norconsult International using weak data. For Kenya and Egypt the figures refer to fiscal year 1998/99. Table 2.4 lists the figures for all Nile Basin countries. Table 2.4: Demand­Supply Situation in 1999 (Excluding Egypt) Country Thermal Hydro Losses Domestic Export Import Generation Generation (GWh/ consumption (GWh (GWh/ (GWh/ (GWh/ year) (GWh/ year) /year) year) year) year) Burundi 0 121 39 102 0 20 Congo, Dem. Rep. 0 156 20 100 36 0 East Egypt 52,694 15,287 9,015a 56,504 0 0 Eritrea 202 0 31 171 0 0 Ethiopia 29 1,595 313 1,306 0 0 Kenya 1,201 3,274 884 3,695 0 140 Rwanda 0 182 66 131 1 16 Sudan 1,059 1,227 776 1,510 0 0 Tanzania 90 2,162 292 1,960 0 0 Uganda 0 1,364 463 714 174 1 Total 55,275 25,368 11,899 66,193 211 177 a. This figure does not include auxiliaries consumption Source: Power experts of Nile Basin countries. 2.42 The table's figure for hydropower supply of 121 GWh for Burundi is composed of 91 GWh of generation by domestic facilities and 30 GWh of production from Ruzizi II. The figure for import of 20 GWh to Burundi is production from Ruzizi I, whereas the figure of export of 1 GWh from Rwanda represents export to Kisoro in Uganda. The figure for export for Democratic Republic of Congo of 36 GWh is export from Ruzizi I to Burundi and Rwanda. The figure for import to Kenya of 140 GWh is import from Uganda. The figure for hydropower supply of 182 GWh for Rwanda is composed of 128 GWh of generation by domestic facilities and 54 GWh for production from Ruzizi II. The figure for import to Rwanda of 16 GWh represents production from Ruzizi I. The figure of 174 GWh for export from Uganda is export to Kenya, Tanzania, and Rwanda. (The export and import figures do not correspond because the export is partly to isolated areas, whereas all imports given in the table are to the main networks only.) This information is also shown in figure 2.7 for all countries except Egypt. 32 Opportunities for Power Trade in the Nile Basin Figure 2.7: Demand and Generation in 1999, Excluding Egypt (GWh) 5000 4000 3000 2000 1000 0 Burundi Congo, Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Dem. Rep.-Kivu Generation Hydro Generation Thermal Consumption Losses Source: Power experts of Nile Basin countries. 2.43 It is important to note that Burundi, Democratic Republic of Congo-East, Rwanda, and Uganda had only hydropower generation in 1999. Eritrea had only thermal generation. Kenya had about 75 percent hydropower generation, whereas Egypt had approximately 78 percent thermal generation. Sudan and Tanzania had 54 percent and 96 percent, respectively, of hydropower generation in their national networks. Demand­supply balances 2.44 With regard to demand­supply balances, the Democratic Republic of Congo-East, Burundi, Rwanda grid should (based on 1999) need a total supply of 458 GWh, composed of domestic consumption of 333 GWh and losses of 125 GWh. The annual average production from the hydropower facilities in this grid is exactly the same (458 GWh) and this consequently indicates a deficit in generating capacity. Rwanda has at present insufficient supply and it can be assumed that this is also the case for Democratic Republic of Congo-East. This indicates that supply in the near future may be insufficient even with the addition of the third unit of Ruzizi II, which is scheduled for commissioning in 2001. 2.45 Tanzania has experienced several periods of load shedding during recent years. With the commissioning of the new thermal generation facilities of Ubungo and the Kihansi power plant this situation has improved and the current supply should be sufficient during a normal hydrological year. Potential for Power Trade 33 2.46 Uganda has faced capacity problems in connection with the export to Kenya during recent years. This indicates that there has been a deficit in generating capacity in Uganda. The energy production in 1999 of 1,364 GWh was also higher than the firm annual energy production from the existing facilities, which currently is estimated at 1,275 GWh. The ongoing rehabilitation of Owen Falls will improve the situation from 2001 onward. 2.47 The 1999 consumption and losses for Ethiopia are about 1,600 GWh, whereas the annual energy production for the hydropower facilities is estimated at about 1,700 GWh. There is consequently no surplus at present. Commissioning of new hydropower facilities in 2001 and 2003 with annual productions of 331 GWh and 624 GWh, respectively, will improve the supply situation considerably. 2.48 Peak demand for the Sudan grid has been between 350 MW and 375 MW for the last few years, with the available capacity somewhat below 420 MW. This indicates that there is no significant surplus when reserve margins are taken into consideration. 2.49 The information received also indicates that neither Kenya nor Egypt have any significant surplus capacity, at least when reserve margins are taken into consideration. With regard to Eritrea, the information in the documents studied is too outdated to be used for an assessment of possible surplus or deficit. 2.50 Based on the material available for this study, the main conclusion is that there is either reasonable balance or deficit in generating capacity in all of the power systems. It should be kept in mind that this conclusion has been reached through a desk study at scoping level and without any detailed power system analysis, including detailed studies of energy and capacity requirements, reserve margins, and the like. This reservation is of particular relevance for the more comprehensive power systems, especially Egypt. Cost of generation 2.51 The cost of supplying additional power in the Nile Basin countries varies considerably in the estimates available in the source material. Egypt has the lowest cost of incremental bulk supply based on cheap natural gas from domestic sources. Uganda and Tanzania can also provide competitive candidate hydropower projects for supply of electricity, if a sufficiently large market can be established. The unit cost of generation for Ethiopia's hydropower potential needs to be reevaluated as the range of costs available to the Consultant varies greatly. Also, the redesign of schemes to multipurpose needs in a regional context might lead to a reduction in the cost of electricity generation compared to that in the current single-purpose designs. The cost of electricity generation in the region's landlocked countries relying on thermal power is high because of long transportation distances. Thermal generation based on imported fuels is also sensitive to world market fluctuations in the oil price. 2.52 The variation in electricity supply cost among candidate projects in the Nile Basin countries represents a significant potential for power exchange that, if developed, can greatly benefit two or more countries in the area compared to the no-trade scenario. 34 Opportunities for Power Trade in the Nile Basin 2.53 The candidate projects' unit cost of generation was studied and used when assessing the options for power trade presented later in the report. These cost estimates need to be updated to become comparative across countries, however. They need, for instance, to refer to a common base year, apply comparable assumptions of cost estimates, and use a discount rate that reflects the opportunity cost of capital in a regional setting. Further work on these unit costs is recommended and is an integral part of the study options detailed in chapter 3. Electricity tariffs and average sales prices 2.54 The average sales price of electricity to consumers in the Nile Basin countries, as reported by the national energy experts, shows variations that, by and large, reflect the differences in the cost of generation. Egypt has by far the lowest sales price, 3.7 USc/kWh (1998). Burundi, Ethiopia, and Sudan sell electricity to their consumers at an average price of about 6 USc/kWh. Somewhat higher prices, around 8 USc/kWh, are prevalent in Uganda and Kenya. The highest electricity prices are found in Tanzania and Rwanda--on average 10 USc/kWh or higher. (See table 2.5.) 2.55 The tariffs applied in the region are in most cases below what is required to cover the cost of supplies and own-financing of expansions, with the possible exception of Rwanda and Tanzania. Table 2.5: Average Sales Price of Electricity per kWh for Consumers, Nile Basin Countries Country U.S. Cents 1997 1998 1999 (Local Currency) Burundi USc (FBU) 8 (28.77) 7 6 (32.1) (30.5) Congo, Dem. Rep. USc 3.9 Egypt USc (PT/kWh) 3.7 (12.8) 3.7 (12.8) Eritrea Ethiopia Usc 6 Kenya Usc 7.94a Rwanda USc (FRW) 12.7 (42) (42) 10.9 (42) Sudan USc (LS) 5.3 (105) Tanzania USc 9.8 10.1 Uganda Usc (Ushs) 7 7.9 (88.3) a. 1998/99; KPLC Annual Report. Note: Blank cells indicate that data have not been reported. Potential for Power Trade 35 Source: Power experts of Nile Basin countries. 2.56 Additional information, broken down by country, on tariffs and electricity prices was gleaned from the source material of this study and is presented below. Data available are not necessarily consistent across countries, as assumptions made in calculations may vary. (This caveat could, for instance, apply in the definition of average sales prices.) 2.57 In Burundi, the average sales price of electricity was about 27 FBu/kWh in 1999. Measured in fixed prices, the average sales price dropped from 15 FBu/kWh on average during 1990­95 to 6 FBu/kWh in 1999. The tariff is far below what is required to recover the cost of supplies. Consequently the operations of REGIDESO generate a substantial financial deficit. 2.58 In Egypt, about 78 percent of the Egyptian Electricity Authority's (EEA) sales in fiscal year 1996/97 were to the distribution companies at an average price of 2.9 USc/kWh, with an overall average sales price including EEA's sales to the industrial users at about 2.8 USc/kWh. The average consumer retail tariff, by comparison, was about 4.2 USc/kWh in 1999. Commercial consumers are paying the highest tariffs compared to residential customers and large industries. The average tariff for commercial customers is about 8.4 USc/kWh as compared to 2.5 USc/kWh for residential consumers and 1.9 USc/kWh for large industries. 2.59 Ethiopia embarked on a stepwise adjustment of electricity tariffs in the early 1990s in order to bring sales prices toward Long-Run Marginal Cost (LRMC). However, even with the stipulated program, average sales prices would not reach more than 72 percent of LRMC. 2.60 In Kenya the average sales price by the existing 1996 tariffs was calculated at about 8.7 USc/kWh, while the financial tariff that would meet specified financial requirements for KenGen and Kenya Lighting and Power Company (KPLC) is 9.1 USc/kWh--that is, a tariff increase of 5 percent is required to meet financial targets. The actual average sales price, as reported in the update of this study, is 8 USc/kWh. 2.61 In Tanzania, the low voltage sales tariffs range from 5.5 USc/kWh for consumption up to 450 kWh per month, and to 18 USc/kWh for consumption above 5,000 kWh per month. 2.62 In Uganda, the low voltage sales tariffs are between 9.0 USc/kWh (up to 450 kWh per month) and 8.4 USc/kWh (for consumption above 5,000 kWh per month). The average sales tariff was 7.9 USc/kWh in 1999. 2.63 The negotiated tariffs for supply of power by Uganda Electricity Board to Kenya Power Company in effect since July 1993 and valid until October 13, 1999 are 8.0 USc/kWh for supplies during the day and 6.0 USc/kWh for night supplies. 36 Opportunities for Power Trade in the Nile Basin Future Demand and Supply Demand forecasts 2.64 Table 2.6 shows demand forecasts for the years 2005, 2010, 2015, and 2020. Some average growth rates are also shown. The forecasts below are relevant for the main grids in the respective countries. The forecasts have been provided by the national experts and are in most cases up to date. With regard to Egypt, it is only the 2005 forecast that has been provided by the national expert and the Consultant has prepared his own forecasts for 2010, 2015, and 2020. The forecast for Democratic Republic of Congo-East is outdated. With regard to Eritrea, Norconsult International has prepared forecasts using rather weak data, as previously described. Table 2.6: Demand Forecasts for 2005 through 2020 .Country Forecast Avg. incr. Forecast Forecast Forecast Avg. incr. 2005 2005 2010 2015 2020 2020 (GWh) (%) (GWh) (GWh) (GWh) (%) Burundi 156 6.0 195 253 335 5.0 Congo, Dem. 331 16.0 405 653 917 8.7 Rep. East Egypt 86,333 8.5 109,000 145,000 191,220 5.7 Eritrea 251 6.7 320 407 518 4.9 Ethiopia 2,011 7.5 2,640 3,367 4,285 5.3 Kenya 5,724 7.6 7,747 10,435 14,007 5.3 Rwanda 234 10.0 314 420 562 6.5 Sudan 4,246 18.8 6,417 9,550 14,212 10.2 Tanzania 4,346 14.2 5,709 7,384 9,442 7.1 Uganda 1,975 14.3 3,003 4,134 5,559 8.3 Total 105,607 135,750 181,603 241,057 Source: Norconsult International Study 2.65 The demand forecasts for each country, except Egypt, are also shown in figure 2.8. Total demand for the entire region is shown in figure 2.9. Potential for Power Trade 37 Figure 2.8: Electricity Demand Forecast per Country (Excluding Egypt) (GWh/year) 16000 14000 12000 Sudan 10000 Kenya Tanzania Ethiopia 8000 Uganda Rwanda DRC 6000 Eritrea Burundi 4000 2000 0 2000 2005 2010 2015 2020 Year Source: Power experts of the Nile Basin countries Figure 2.9: Total Electricity Demand Forecast in Nile Basin Countries (GWh/year) 300000 250000 Burundi 200000 Eritrea DRC Rwanda Uganda 150000 Ethiopia Tanzania Kenya Sudan 100000 Egypt 50000 0 2000 2005 2010 2015 2020 Year Source: Power experts of the Nile Basin countries 38 Opportunities for Power Trade in the Nile Basin Future demand­supply balances 2.66 National power subsector generation expansion plans form the basis for the information used in this subsection. These plans assume only power exchange among the countries at current levels. Consequently balances between demand and supply, including reserve margins, are essentially envisaged to be covered by indigenous generating facilities. The only exception is Tanzania, which has included some import from Zambia during the planning period. This shows that all of the Nile Basin countries plan future development of the power subsector in the traditional way, without any major new interconnections enabling increased exchange and trade of power. Democratic Republic of Congo-East­Burundi­Rwanda grid 2.67 Burundi, Rwanda, and Democratic Republic of Congo-East all envisage hydropower generation for their future development. Their master plans include indigenous projects. Rwanda has also one thermal power station. As previously stated, there are indications of a deficit in available energy from the hydropower-based generation facilities. As the demand for the three countries in year 2005 is estimated at about 700 GWh, this will require additional energy generation in the order of 400 GWh, when the committed commissions of the third unit of Ruzizi II have been done in 2001. 2.68 The expansion plan for Rwanda indicates a deficit until 2005, when there is expected to be a reasonable balance if the Nyabarongo hydropower project is commissioned. 2.69 The reference scenario expansion plan for Burundi indicates reasonable balances of energy and capacity if the envisaged hydropower projects are implemented. There is some surplus in the years in which the new projects are commissioned. This is definitely the case for the high-expansion scenario, if the 90 MW hydropower project, Singuvyaye, is commissioned in 2004. This will result in a significant surplus during the first few years thereafter. 2.70 The Democratic Republic of Congo has possible hydropower projects in the eastern regions of the country. All three countries have comparatively small power markets and power exchange among them in conjunction with the development of the domestic projects could be advantageous. This could, for example, turn out to be the case for the Kabu 16 project in Burundi or the Nyabarongo project in Rwanda. 2.71 Two regional projects have also been studied for the purpose of joint development according to the reference documents. These projects are the Ruzizi III and Rusumo Falls with indicated installed capacities of 82 MW and 60 MW, respectively. (These are proposed as study options 1 and 2 in chapter 3.) It is obvious that increased exchange of power is economic in the development of both regional and domestic projects. 2.72 The Consultant's information on the operation and dispatch capabilities of this network is limited. It is known, however, that it has been in operation for a number of years, starting with the development of the Ruzizi I and Ruzizi II power plants. These power plants are operated by Société Nationale d'Electricité du Congo (SNEL, Potential for Power Trade 39 Democratic Republic of Congo's power company) and Société Internationale d'Electricité des Pays des Grands Lacs (SINELAC), respectively. The operation of Ruzizi I and II and the power exchange are based on their implementation agreements. With the increased importance of the efficient operation of this grid in the future, a study of this exchange could be useful. (This is defined as study option 3 in chapter 3.) 2.73 A general strengthening of the Democratic Republic of Congo- East/Burundi/Rwanda grid is definitely of importance. There are some plans for a new interconnection between Rwegura in Burundi and Kigoma in Rwanda. (This is noted as study option 4 in chapter 3.) 2.74 An interconnection between the Democratic Republic of Congo- East/Burundi/Rwanda grid and the Tanzanian grid might have operational advantages and also enable more optimal planning, taking the size of some of the projects in this area into consideration. Another advantage of this is that some of the load centers in northern Tanzania would end up closer to the source of generation. This would be of particular relevance if the Rusumo Falls project is developed. (This proposal is study option 5 in chapter 3.) 2.75 Another interesting matter to pursue is the possibility of supplying isolated centers in Tanzania from the Democratic Republic of Congo-East/Burundi/Rwanda grid or from Uganda, which is explored as study option 6 in chapter 3. Tanzanian grid 2.76 As already indicated, there is a reasonable balance in generating capacity in this grid with the commissioning of the Ubongo and Kihansi projects. The demand forecasts, however, require a generation of more than 5,000 GWh already in year 2005 and the balance is supposed to be covered by new and existing thermal generating facilities as well as import from Zambia. 2.77 The demand supply balances indicate reasonable margins, if the projects in the generation expansion plan are implemented. In addition to thermal facilities, two comparatively large hydropower developments--the Ruhudji and Rumakali projects with 358 MW and 222 MW, respectively--are envisaged for the years 2010 and 2014. There is, of course, some surplus during the first years after these have been commissioned, which could be used for net export of power in a normal hydrological year if transmission facilities were available. Net export and/or reduced reserve margins might also be possible in other years, if transmission facilities to neighboring countries were developed. 2.78 Tanzania has a considerable hydropower potential. Projects with an aggregate installed capacity of about 2,400 MW and an average annual production of more than 10,000 GWh have been studied at least to master plan level. Only two of these, representing 580 MW, are included in the current national master plan, as the rest is supposed to be covered by import from Zambia and thermal generation. The unit cost of generation for these candidate hydropower projects is competitive and there is consequently a potential for net exports to neighboring countries, for instance Kenya or 40 Opportunities for Power Trade in the Nile Basin the Democratic Republic of Congo-East/Burundi/Rwanda grid, if the development of some of these projects is advanced. Transmission distances from the Tanzanian grid to these two power grids are also reasonable. Further studies with the objective of assessing benefits and ranking candidate hydropower projects in Tanzania with a view to increasing power export could be of interest. (This is indicated as study option 7 in chapter 3.) Kenyan grid 2.79 For this power system there is also a balance between demand and supply, both in the near future and throughout the planning period, if the projects in the generation expansion plan are implemented. This plan has only a small part of indigenous hydropower projects envisaged for future development. Kenya is supposed to add 1,600 MW of generating capacity up to year 2017, of which 15 percent is hydropower. The generating facilities in the national power system will consequently become more and more thermal-based in the future. About 900 MW of this planned thermal generation expansion is based on diesel. 2.80 There is, consequently, a scope for increased import of hydropower from neighboring Uganda or Tanzania, if the price is competitive, with the result of reduced oil-based thermal generation. This is the case in the short term, owing to the nature of the existing generating facilities. This option may be even more important in the future because a significant part of the new generating facilities is diesel-based. 2.81 Hydropower production in Kenya is at present planned with the purpose of avoiding spill and maximizing energy production in the country's system. A result of this is that hydropower production is evenly distributed over the year and that the reservoirs are almost empty at the start of the rainy season during a normal hydrological year. Interconnection with Tanzania or more reliable supply from Uganda might allow a different operational strategy. The monthly distribution of flows, given in chapter 2 of the draft data reports, shows that the projects in Tanzania and the existing hydropower plants in Kenya to some extent are complementary as the latter have two annual peaks--that is, high flows during October­December--when Tanzania is in its dry season. The distribution of flows for the power plants in Uganda is also most favorable to trade. This is important from the point of view of power system operation. A possible interconnection of the power grids in Kenya and Tanzania could therefore be of interest as the distance between the two power systems is reasonable if sufficient amounts of power are being transmitted. (This is proposed as study option 8 in chapter 3.) 2.82 The current plan of deregulation in Kenya stipulates that KenGen will provide generation from its own installations and power purchase agreements with independent power producers. A transmission company, KPLC, will buy power from KenGen and supply it to consumers. In this set-up, there is a scope for greater competition in distribution and thereby more efficient supply to consumers. (This appears as study option 9 in chapter 3.) Potential for Power Trade 41 Ugandan grid 2.83 As previously indicated, the Ugandan grid has faced capacity problems during recent years. This will be improved in the near future, when the first phase of the Owen Falls extension, which comprises units 11 and 12, is commissioned. According to the generation expansion plan, this was supposed to take place in 2000. The installed capacity at Owen Falls power station will then be 260 MW. The second phase of the extension, which comprises another 120 MW, was scheduled for 2001. The total addition will then be 260 MW of capacity and 750 GWh of power generation. The total energy generation will then be about 2,000 GWh. Even with this expansion, there is a deficit both in energy and capacity during the years 2000­03. 2.84 The construction of the Bujagali hydropower plant is still under discussion. If the project is implemented, this will add another 250 MW and approximately 1,600 GWh of firm power to the system. A surplus of about 800 GWh and 140 MW can occur when Bujagali is commissioned. There could consequently be some scope for increased power export, depending on the hydrology. This export potential will be significantly increased if the Karuma hydropower project is commissioned in 2005, as indicated in the generation expansion plan, as the surplus then would be about 1,800 GWh and 320 MW. Another comparatively large hydropower development, the Kalagala project, is scheduled for commissioning in 2008. There will, consequently, be reasonable margins and/or some scope for net export during the years 2004 through 2015, if the generation expansion plan is implemented. 2.85 Other new hydropower projects have also been studied to master plan level in Uganda. These represent an installed capacity of approximately 800 MW and an annual firm energy generation of about 5,000 GWh. There is, consequently, a significant scope for increased export to Kenya and other neighboring countries also in the medium to long term, if some of these projects are implemented, as their unit cost of generation is competitive. 2.86 An important characteristic here is that the monthly distribution of flows from existing and future projects in Uganda is favorable to power exchange between Uganda and Kenya. The flow of the Victoria Nile in Uganda is evenly distributed over the year, whereas the flow in the Tana River in Kenya has two typical peaks, March through May and October through December. 2.87 A study to assess possible advantages and ranking of hydropower projects in Uganda with a view to increase export to neighboring countries could be of interest. (This is proposed as study option 10 in chapter 3.) 2.88 Given this background, it is likely that increased power export from Uganda to Kenya could be favorable and that investments in increased transmission capacity between the two countries could be feasible. (This is proposed as study option 11 in chapter 3.) 42 Opportunities for Power Trade in the Nile Basin Ethiopian grid 2.89 As previously stated, there is a balance, without any significant margins, in the Ethiopian interconnected network. According to the country's future generation expansion plan new hydropower projects with an installed capacity of about 250 MW and annual generation of almost 1,000 GWh have been committed and are scheduled for commissioning before 2004. The generation required in 2003 is, according to the previously presented forecast, about 2,100 GWh and there is a reasonable margin or a small surplus both in energy and capacity in that year. The Tekeze Stage 1 hydropower project is scheduled for commissioning in 2006, which would result in a surplus of about 800 GWh and 350 MW in the interconnected system in that year. 2.90 In the power subsector development master plan, it is envisaged that hydropower projects will only cover future supply. Ethiopia has a considerable hydropower potential. Projects studied at least to master plan level represent around 1,900 MW of installed capacity and an average annual energy production of 8,000 GWh. This is above the needs for the national power system in this planning period and consequently there is a scope for power export to neighboring countries, if the implementation of some of these projects is advanced. There are also other candidate hydropower projects. 2.91 A proper assessment of the unit cost of generation for potential power projects in Ethiopia for possible export of power is very important in relation to indicating the scope for power export and trade. Some of the data currently available to the Consultant indicate a relatively high cost of generation, whereas other data show much more favorable costs. Given the wide range and conflicting nature of these data, it is not possible to adequately assess the relative cost of generation without further study, which is proposed as study option 12 in chapter 3. 2.92 Additionally, the unit cost of generation from the candidate hydropower projects in Ethiopia is purely based on hydropower development. Multipurpose use of the water resources would add other benefits, reduce the power generation cost and possibly justify development of transmission facilities and power trade in the future. (This is proposed as study option 13 in chapter 3.) 2.93 There may be advantages of interconnection between the power systems in Ethiopia and Sudan. Sudan has a combined hydropower and thermal-based system, whereas the system in Ethiopia is hydropower-based. Interconnection of Roseires in Sudan with the power system in Ethiopia has been studied and found technically feasible without major reinforcements of existing transmission facilities. According to that study, the advantages would be better utilization of surplus hydropower energy and flexibility in the timing of new generation capacity. An update would be of interest in terms of power trade. (This is proposed as study option 14 in chapter 3.) 2.94 The idea of interconnecting the Ethiopian power system with the grids in Kenya and Uganda was discussed during the working group meeting in Entebbe, Uganda. Transmission distances will be about 1,000 kilometers, which is considered relatively long. However, studies for the assessment of technical characteristics, costs, and benefits Potential for Power Trade 43 at prefeasibility level could be worth considering. (These are proposed as study options 15 and 16, for Kenya and Uganda, respectively, in chapter 3.) Eritrean grid 2.95 The statistical information made available to the Consultant for Eritrea is outdated and does not allow any assessment of the demand/supply balance. Eritrea will continue to rely on thermal power. There could consequently be a scope for power export from Ethiopia to Eritrea, thereby substituting comparatively expensive thermal power in Eritrea with hydropower from Ethiopia in the future, even if the current power market most likely is too small to justify any major investments in such transmission facilities. 2.96 There are proven gas reserves in Eritrea, which could be used for export to Sudan or Ethiopia. Sudanese grid 2.97 As previously mentioned, there does not seem to be any surplus in the Sudanese power system. According to the development plan from 1999 to 2005, there is a certain deficit in generating capacity during the first part of this period. 2.98 Different generation expansion plans have been worked out. As for all other countries these are for the purpose of supplying the national power systems only. There are plans to add about 2,000 MW up to the year 2013. These expansion plans all include one large hydropower project, the Merowe project with a capacity of 1,250 MW. 2.99 The various expansion plans include different thermal alternatives--that is, combined cycle and steam, steam turbines, and gas turbines--with installed capacity of about 800 MW. An option with combined cycle and steam has been chosen. Different stages of the Merowe hydropower project are, according to this plan, scheduled for the period 2007­11. Tender documents for the Merowe project have been worked out. The project, however, is still awaiting financing and a final decision on project implementation has not yet been taken. A study of the importance and effect of the Merowe project in a regional perspective could be of interest. (This is proposed as study option 17 in chapter 3.) 2.100 Sudan has a technically feasible hydropower potential of about 5,000 MW. A significant part of this is located in the southern part of the country, and the estimated potential of the White Nile between Juba and Nimoli is approximately 2,000 MW. Hydropower projects in this area could, if developed, be considered for interconnection with the Nile Equatorial Lakes power grid in the future. (This is proposed as study option 18 in chapter 3.) There are also considerable hydropower potentials in the other parts of the country, which could be considered for interconnection with Egypt and development of the Eastern Nile grid in general. (This proposal is presented as study option 19 in chapter 3.) 2.101 The operation of hydropower projects in Sudan is to a great extent dependent on irrigation requirements. The distance between existing Roseires, in the Sudanese grid, and the Ethiopian grid is about 500 kilometers and an interconnection is not unrealistic in 44 Opportunities for Power Trade in the Nile Basin terms of power transmission. This possible power exchange should be based on the advantage of combining the hydropower-based system in Ethiopia with the mixed system in Sudan. (This refers to study option 14 in chapter 3, mentioned above). Egyptian grid 2.102 As mentioned earlier, the Egyptian power system is well developed and represented about 84 percent of the total generation in the region in 1999. A generation expansion plan up to the year 2010 was provided for this study. The total new generating capacity in this period is 12,439 MW, of which 3,370 MW is before the year 2004. This is composed of 450 MW of wind energy, 750 MW of solar/gas energy, 1,464 MW of hydropower/pumped storage, and various types of thermal generation. The addition of new generating capacity is somewhat higher than the corresponding load growth. 2.103 A 220 kV interconnection between Egypt and Libya commenced operation in December 1998. Another project, the Egypt-Jordan interconnection, was commissioned in September 1998. These developments indicate that Egypt is oriented toward power exchange with Mediterranean countries and perhaps with Europe. 2.104 Interconnections with the grids in Sudan and/or Ethiopia could, however, materialize in the medium to long term. With the distances in question, Direct Current (DC) connections are possible options. (These are proposed as study options 20 and 21 in chapter 3, for Ethiopia and Sudan, respectively.) Summary 2.105 To recap, there are two areas in the Nile Basin where power trade is currently undertaken. The first of these comprises Democratic Republic of Congo-East, Burundi, and Rwanda. The second area includes Uganda and Kenya. Uganda also supplies small isolated centers in Rwanda and Tanzania. It was discussed in the previous section that there also is a scope for Tanzania to be interconnected to Kenya in view of transmission distances, hydropower complementarity, and power markets. 2.106 Studies for the interconnection of the grid in Tanzania and the Democratic Republic of Congo-East­Burundi­Rwanda grid have been undertaken in connection with the possible development of the Rusumo Falls hydropower plant. According to this study, such an interconnection is technically feasible. It is also possible that other isolated centers in the northwestern part of Tanzania could be served, either from the Democratic Republic of Congo-East/Burundi/Rwanda grid or from Uganda. Consequently the grid in Tanzania could be interconnected with grids in Kenya/Uganda and with the Democratic Republic of Congo-East/Burundi/Rwanda grid. If these views materialize, power trade could be undertaken in this whole area--which could be referred to as the Nile Equatorial Lakes region and include Burundi, Democratic Republic of Congo/East, Kenya, Rwanda, Tanzania, and Uganda. 2.107 The remaining countries--Ethiopia, Eritrea, Sudan, and Egypt--could be called the Eastern Nile region. The power grids in these countries are all isolated, except that of Potential for Power Trade 45 Egypt, which recently has established interconnections with other Mediterranean countries. The uncertainty with regard to the unit cost of generation for the Ethiopian candidate hydropower projects has already been mentioned. A proper assessment of this is of vital importance for the evaluation of the economic viability of power system interconnections and trade in the Eastern Nile region. In view of transmission distances and power markets, the power grids in Ethiopia and Sudan could be interconnected and thereby enable power trade between the two countries. 2.108 The calculation of unit cost of generation for the Ethiopian candidate hydropower project does not include benefits arising from multipurpose water use further downstream in Sudan and Egypt. This is also important for the assessment of power trade benefits in the Eastern Nile region. The power market in Eritrea is small and the study related to power export based on indigenous gas reserves is important to assess its position. 2.109 Another possibility for power exchange and trade is the interconnection of the grids in Ethiopia and Egypt. This will most likely evolve gradually by first interconnecting Sudan either to Egypt or to Ethiopia. Interconnection of Ethiopia and Egypt could also be done directly. In any case, this is a more medium-term development and has to be evaluated in a broader perspective, also including multipurpose water use. 2.110 A long-term scenario that has been discussed from time to time is a power transmission line from Inga Falls, in Democratic Republic of Congo, to Egypt and Europe. Conclusion 2.111 An important finding of this study is that all of the development plans analyzed here assume power exchange between the countries at current levels. Consequently, balances between demand and supply, including reserve margins, are envisaged to be covered by indigenous generating facilities. This shows that the region's countries plan future development of the power subsector in the traditional way, without any major new interconnections, including increased exchange and trade of power. 2.112 Another important characteristic observed in the plans is that there is either balance or deficit in generating capacity and/or energy generation in almost all of the power systems. The future generation expansion plans normally envisage reasonable reserve margins and some surplus at points in time when comparatively large power plants are commissioned. 2.113 Four countries--Uganda, Tanzania, Sudan, and Ethiopia--have considerable indigenous hydropower resources which are well above the domestic needs of these countries in their present long-term subsector planning periods. If some of the planned projects are advanced or other projects are introduced, there could be a scope for net export to neighboring countries with resulting reduction of thermal generation. Another interesting finding is that there is hydrological complementarity between different parts 46 Opportunities for Power Trade in the Nile Basin of the Nile Basin, which is advantageous for the operation of hydropower generation facilities in neighboring power systems. 2.114 Transmission distances in the Nile Equatorial Lakes in general, and also between Ethiopia and Sudan, are acceptable for the transfer of reasonable amounts of power. Transmission facilities between the power systems are, however, not sufficiently developed and this presents a severe constraint to increased trade of power. 2.115 In light of all this, basinwide trade is unlikely in the near future. However, in the Nile Equatorial Lakes some limited power trade is currently undertaken and could develop significantly in the short term. In the Eastern Nile, power trade potential exists, but needs to be evaluated in the context of a broader multipurpose approach to water resources development and management. 2.116 Several study options were mentioned in this chapter for the purpose of enabling a better evaluation of the findings and the preliminary conclusions given. These are explored further in chapter 3. 25° 30° 35° 40° 50° M e d i t e r r a n e a n S e a Area of main map See inset for detail Kafr. Damietta Matrouh Mahmudiya 488 B.Elabed S.Krir Sh. 1125 P.Said E. 64 60 ABK 900 Rafah 7.3 LIBYA ARAB Omayed 325SomidI&S Arish REP. OF B.Arab BghadadM EGYPT Free.Z. Qant. L. Qarun Amiryia East Gefgafa 1.3 Spining Cairo A.Zabal Buhirat E. Nokhi 2 30° A.Matamir O.Mousa 30° N I L E Boston SadatW. Basous Tabbin Suez 14.8 CHAD ERITREA 500 185 Nile Delta Detail Mediterranean Sea A R A B Kuremiat 14.8 Taba SUDAN 1254 DJIBOUTI Dahab 21.6 Nowebaa Kafr. Damietta Demo B A S I N Mahmudiya Sh. 1125 P.Said B. Suef Tour 16.6 ETHIOPIA B. Suefe S.Catrin 6 ABK 900 488 E. 64 CENTRAL Talkha 793.5 Maghaga AFR. REP. Gamalia Suez Maghaga W. Sh.El Shiek 107 Iron & Simuha 647 Abis Samalut Minya SOMALIA Steel Damanhur Manayif W. Bhareya Malawi UGANDA Abis I.Baroud Mansura Canal KENYA Qant. Walida Dekh Kafr. Tanta East R E P. O F Walida 600 RWANDA Dauwar Zagazig Assuit PS 90 Hurghada S O U T H BURUNDI Amiryia 440 T.Badr Minuf Assuit 500 Nile DEM. REP. INDIAN Abusultan Tema OF CONGO TANZANIA Spining Boston Basous A.Zabal Cem Assuit 1 600 Sohag OCEAN A.Matamir Cairo W. Cairo Cem Assuit 2 A T L A N T I C Gerga Qenas Safaga Sadat Suez Naga Hamad Qena Tabbin 185 A. Tartour O C E A N MALAWI 500 Alumn Luxor ZAMBIA Mot Balat 4.7 Esna 90 25° 11.6 Esna 25° MOZAMBIQUE E G Y P T Kharga 7.2 Edfo Fero. Silicon Komombo L I B YA Kima Aswan Dam 615 El Sail High Dam 2100 Lake Nasser 45° L. Nuba Wadi Halfa 1.2 OPPORTUNITIES FOR POWER TRADE IN THE NILE BASIN EXISTING TRANSMISSION LINES: 20° 20° Nile 500 kV Dongola 3.4 220 kV 100-150 kV Karima 8.2 60-88 kV Atbara 13.6 EXISTING POWER PLANTS: HYDROPOWER Atbara THERMAL Shendi 4.4 DIESEL GENERATOR Khartoum North Omdurman SUBSTATIONS Kuku 22.3 New Halfa Kassala 5 Massawa 9 Khartoum Burri 90 NATIONAL CAPITALS 10 Asmara Khasham el 15° 15 Girba 12.6 15° 7 E R I T R E A Hauzen 0.2 Mashkur El Gedaref Inda Axum Adigrat Humera Silase S U D A N El Fam Wikro 0.4 Al-Geneinah Al Fashir Sennar 15 Adwa 3 1.5 5.2 Obeid 11.2 Abiy Adi 0.9 Mekele 4.2 Singa Rabak Metema Nyala 11 0.2 UmRuaba Sekota 2.2 Gonder Korem 1.6 Gorgora Alamata T'ana Hayk'Wereta Lalibela 0.2 Asaita Roseires Weldiya Dubti 1.2 DJIBOUTI 280 Bahar Dar Nefas Nile 1.2 Dangla Mewcha 1.1 Pawle Dese Kombolcha White Abbai Finote Selam Bichena Were Ilu 0.4 Debre Markos Mehal Meda 0.6 Asosa 1 Robit 10° Alem Ketema Bahr 10° 0.6 Molale el 0.2 Ghazal Fiche Diredawa 5.6 Malakal 22.1 Nejo 0.2 Finchaa Debre Birhan Nekemte 100 Muger Alemmaya 2.9 Sabat Gimbi 2.84 Amibara S O M A L I A 1.3 Gedo Guder Metahara Asbe Teferi Awash Dembidolo Sor 5 Bedele Weliso Addis Ababa Degeh Bur Gilgel Koka 43 0.55 Gambela Gibe Awash 2&3 64 Gilo Metu 180 Adami Tulu C E N T R A L Wau 2.8 0.6 Agaro Asela WenzTepi 0.6 E T H I O P I A Jima Hosaina Alaba Kulito Melka A F R I C A N Bonga Shashemene Wakena 15.3 Ginir 0.4 Warder 0.18 Dembi 0.8 Sodo Awasa Kebri Dehar 0.63 Yirga Alem Goba R E P U B L I C Blatten Gode 0.99 Arba Yadot 0.35 Minch Shakiso Nile Jinka 1 Negele 1.1 5° 5° Dolo Shebelli White odo 0.2 Juba 3.3 Mobay 11 Dingila Monga 0.2 0.35 Dungu 0.3 Moyale 0.7 Moyo 0.1 Lake S O M A L I A Kitgum Uele Rungu 0.1 Koboko Turkana Buta 0.6 Mungbere Aketi 0.5 N'zoro 1.1 Adjumani 0.1 Isiro 0.1 Arua 0.8 1.5 Rethy 0.3 Moroto 0.5 Solen.1 1.1 Nebbi 0.2 Solen.2 1.1 Congo UGANDA Budana 10.3 Lira Kapchorwa Juba Lake Soroti Turkwel Gorge 106 Yangambi 1.6 Albert K E N YA Owen Falls Eldoret Mobuku I 5.4 180 Tororo Butuhe 0.3 Kampala Kamburu 92 Gitaru 145 Tshopo 19 Mobuku III 10.5 Lugazi Lessos Nkenda Masinga 40 Mukono Kindaruma 40 0° 12.8 Lake Kyendo Kisumu Nanyuki Kiambere 144 Edward Nkonge Kabulasoke 0° Lomami Ubundu Musyenene Mbirizi Muhorni 0.2 Rutshuru 0.7 Ruese Mbarara Tana 14 Garissa 2.7 Katale 0.3 Lake Chemosit Wanji Mugomba 1.6 Rukungiri Victoria 7 Ruanguba 0.16 Kabale Oikaria 45 45 Nyabiondo 0.14 Kyaka Bukoba 2.6 (geothermal) D E M O C R A T I C Belia Mokotos Goma B A Nairobi 14 Athi 2.2 0.22 Masisi E A Ntaruka 11 Musoma 6 D C F Jabana B Gihira 2 Moga 1.3 0.13 C Munkungwa 12 L. Kivu Kigali RWANDARwink- Sultan D Giseney 1 R E P U B L I C O F Lualaba Kabare Hamud Mururu Kigoma wavu E Gifurwe Bunda Ambwe Kibogora Kiboko Lamu 1.3 Ruzizi I 28.2 Marangara 0.2 F Gatsata 2 Mwanza 18 Ruzizi II 26,6 Kayenzi 0.8 Mtito K Buhiga 0.2 Andei Sabaki C O N G O H L Lutshurukuru 5.9 Lemera 0.13 J Mungombe GBURUNDISanzu Ruvyironza 1.3 Kahama Mines Karatu Arusha Moshi Von Rabai Kindu 0.97 I N D I A N Uvira 0.1 5.5 Shinyanga 3.7 Kamibimi Bumumbura Kampene Iwiwi Mugere 8 G Snel Kilifi H Cibitoke 1.7 Nyumba Maungu 1.6 0.13 J Bubanza Mbulu Ya Mungu Same Kipevu I 30 Mombasa 43 Mangembe 2.4 Nyemanga Luama O C E A N 1.4 K Rwegura 18 L Gikonge 0.9 8 Kipevu III 75 Babati 0.5 Kasongo 0.18 Katesh Kigoma 3.9 Urambo 5° Tabora Singida Kondoa 0.5 Tanga 5° 10.3 1.3 Hale 21 Pemba Kiyimbi Pangani 68 Dodoma Zanzibar This map was produced by the Mpwapwa Ras Kilomoni Map Design Unit of The World Bank. Mpanda T A N Z A N I A 0.4 ChalinzeTegeta Kunduchi 2 Dar es Salaam The boundaries, colors, denominations Mtera 80 34 Lake Ubungo Ilala and any other information shown on 112 Tanganyika this map do not imply, on the part of Sumbawanga Tosamaganga Iringa 2.1 Lake Kidatu 200 The World Bank Group, any judgment Rukwa on the legal status of any territory, or Ikwiriri Lake 0.9 any endorsement or acceptance of Mweru Kihansi Mbeya Mufindi 180 such boundaries. 14 Tanwat Uwemba Tukuyu 0.7 Kiwira Njombe 1.3 10° Liwale 0.2 Lindi 1.3 10° Mtwara 5.4 Nachingwea 1 0 100 200 300 400 500 Songea 4 JANUAR Masasi 4.5 Ruvuma IBRD Lake Tunduru KILOMETERS 0.7 Malawi Y Z A M B I A MALAWI 32740 2004 A N G O L A 25° 30° 35° M O Z A M B I Q U E 40° 45° 3 Scope for Power Trade in the Nile Basin Types and Bases for Trade Including Subregional Perspectives 3.1 The data presented in chapter 2 indicate several potential opportunities for near- term investment that warrant further investigation. However, most of these opportunities were identified on the basis of a desk study, not on country visits or in-depth discussions with basin country power sector representatives. Some options were proposed by representatives from the Nile Basin countries during the working group meetings in Entebbe in December 1999 and in Addis Ababa in July 2000. 3.2 The options below are provided to initiate discussions among the Nile Basin countries regarding alternative paths to promote power trade in the region. The options presented in this chapter focus primarily on incrementally improving trade between two or more countries or on a subregional basis. There are several activities that could be carried out basinwide. These activities are oriented toward creating an enabling environment for power trade in the region and are discussed in chapter 4. Eastern Nile region Current situation 3.3 At present there is no international power trade in the Eastern Nile region comprising Ethiopia, Eritrea, Sudan, and Egypt. This is partly because there are no transmission facilities in these countries to enable such trade. Future perspectives 3.4 With regard to power generation, this subregion is characterized by considerable hydropower potentials in Ethiopia and Sudan and low-cost thermal generation in Egypt. The generation expansion plan for Sudan envisages the development of one large hydropower resource, the Merowe project, with an installed capacity of 1,250 MW. Project financing is not concluded and a decision on this would be of great importance for the development in Sudan and also in the region. There is a potential for thermal generation in Eritrea. Transmission distances between Ethiopia and Sudan and also Eritrea will work to promote power trade where the amounts traded are sizeable. 49 50 Opportunities for Power Trade in the Nile Basin Distances from Egypt to Ethiopia are longer and will therefore require higher benefits on the generation side to justify trade. 3.5 Any of the sources of generation mentioned above could in principle be regarded as a source for net export of power. Currently the power subsector in Egypt is more oriented toward other Arab countries and possibly Europe. The power markets in the other Eastern Nile countries are far too small to justify investments in transmission facilities for the purpose of power export from Egypt in the near future--and the power market in Eritrea will most likely be too small to justify any interconnections in the near future. 3.6 Hydropower generation from Ethiopia could be an important element of power trade. However, unit cost information on generation available to the Consultant varies greatly and is purely based on hydropower development. Multipurpose use of the water resources would add other benefits that offset the power generation cost and could justify the development of transmission facilities and power trade. Hydro-thermal complementarity would add further benefits to potential trade. These issues need to be further examined. 3.7 Interconnection and power trade between Ethiopia and Sudan could develop in the near future. This trade could be based on hydro-thermal complementarity, as the power system in Sudan may become more thermal-based in the future, and Ethiopia will in all likelihood develop indigenous hydropower resources. Net export from Ethiopia to Sudan or from Sudan to Ethiopia, depending on the future of the Merowe hydropower project, is also possible. This trade could be in the form of bilateral trading between national utilities or decentralized or open access trading, depending on the development of the power subsectors in the two countries. Nile Equatorial Lakes region Current situation 3.8 The Nile Equatorial Lakes region includes Democratic Republic of Congo-East, Burundi, Rwanda, Tanzania, Uganda, and Kenya. In this subregion power trade exists, but is rather modest. The technical and contractual characteristics of this trade were described in chapter 1. 3.9 Hydropower from Uganda is an important element of this trade, which comprises export to Kenya and some small amounts to isolated centers in Tanzania and Rwanda. This trade is characterized as bilateral trade between state-owned utilities. Referring to designations in chapter 1, the trade could be classified as "Trading with Occasional (Non- Firm) Power from Utility to Utility," even though the agreement originally could be classified as "Trading with Firm Power from Utility to Utility." 3.10 There is also export from Democratic Republic of Congo-East to Rwanda and Burundi, because the three countries have jointly developed two hydropower plants in the Kivu province of Democratic Republic of Congo. It is understood from the reference documents that this export is based on agreements related to the implementation of the Scope for Power Trade 51 Ruzizi I and Ruzizi II projects. According to these agreements, the three countries each have contractual rights to a certain part of the production, which means the proper classification for this arrangement is cooperation through joint ownership ("unit participation"), rather than power trade. However, the three countries have considerable experience in the operation of a common network, which is advantageous in developing future power trade. Future perspectives 3.11 This subregion is characterized by considerable hydropower potential in Tanzania and Uganda. There are candidate hydropower projects in both countries that are not included in the national development plans and that have generation costs that most likely will be competitive. Some hydropower potentials in Rwanda, Democratic Republic of Congo-East, and Burundi are also of interest. These projects could all be used for net export. Future indigenous generation in Kenya is based on geothermal and hydropower resources. These are most likely required for domestic needs and are consequently not considered for net export based on the information made available for this study. Transmission distances among the three power systems in the subregion are not a barrier to power exchange and trade if the amounts in question are deemed significant. 3.12 It is likely that interconnection and power trade between Tanzania and Kenya will develop in the future. The main element of this trade could be the net export of hydropower from Tanzania, and hydro-thermal and hydro-hydro complementarities could add further benefits. Power trade between Uganda and Kenya would most likely increase significantly, if new generation projects in Uganda were advanced and the supply were made more reliable. This increase could also be based on net export from Uganda to Kenya with hydro-thermal and hydro-hydro complementarities as additional benefits. Supplies from Uganda to isolated centers in Tanzania and Rwanda may also increase. 3.13 The specific trading regimes that are conducive to the above power trade perspectives could possibly start with bilateral trade among the state power utilities. As power sector reforms materialize in the region, they could mature into a loose pool with close cooperation among independent state-owned transmission system operators. Coordination in dispatch and regulation of transmission prices should be included in the development strategy. Eventually, a competitive market in regional power trade may materialize. 3.14 Power exchange internally among Democratic Republic of Congo-East, Burundi, and Rwanda in their common grid will most likely increase. There is a need for new generating capacity in this grid and, with the comparatively small domestic power markets, increased power trade among the three would result in better prospects for the new generation projects. 3.15 As mentioned above, the operation of these power plants and their power exchange are based on agreements related to their implementation and do not involve power trade per se. It would definitely be advantageous if more commercial trade were introduced into the equation. Interconnections between this grid and the power systems in 52 Opportunities for Power Trade in the Nile Basin Tanzania and Uganda could also be envisaged, justified by general power system advantages such as flexibility in operation and development planning. If these perspectives materialize, the whole Nile Equatorial Lakes region will have one interconnected network and the physical generation and transmission facilities will allow any form of power trade. 3.16 Significant environmental benefits, such as a reduction in greenhouse gas and other pollutant emissions caused by a shift from thermal to hydropower-based generation, could emerge if regional power trade is developed on a least-cost basis. General Descriptions of Study Options to Promote Power Trade 3.17 Several study options were mentioned in chapter 2. It is the consultant's hope that the options presented in more detail below could serve as a basis for a constructive discussion of promoting power trade in the region (with the caveat cited earlier that the options are based on a desk study with national experts' suggestions added subsequently). Further discussion of these options can, of course, bring forward additional options or possibly question the ones mentioned here. 3.18 The options presented at this stage are all studies and have been organized under the following categories: · Power generation; · The power transmission/system; · Operation/communication; and · Other studies. 3.19 Study options 1, 2, 7, 10, 12, 18, and 19 concern power generation; 4, 5, 8, 11, 13, 14, 15, 16, 17, 20, and 21 concern the power transmission/system; 3 and 22 concern operation/communication; 6 and 9 are "other" studies. It is obvious that generation projects also should be evaluated in the context of supplying the relevant power system in combination with other sources of supply. Specific projects or studies related to operation/communication have been difficult to identify, however, as part of a desk study. Therefore discussions with utility officials would improve the selection of the proper projects in this area considerably. Power generation Study Option 1--Evaluation of the Ruzizi III Hydropower Project for Future Supply of the Democratic Republic of Congo-East­Burundi­Rwanda Grid · Background: The Ruzizi I and Ruzizi II are projects jointly developed by Democratic Republic of Congo, Burundi, and Rwanda to serve their common power grid. There are indications that the Ruzizi III hydropower project could be a feasible project for the same purpose and previous studies indicate an installed capacity of about 80 MW. A steering Scope for Power Trade 53 committee is now finalizing the terms of reference for a feasibility study for the project. · Scope: Conducting feasibility study for the Ruzizi III hydropower project. · Result: Assessment of technical feasibility and economic viability for the project. Study Option 2--Evaluation of the Rusumo Falls Hydropower Project for Future Supply of the Democratic Republic of Congo-East­Burundi­Rwanda Grid · Background: Feasibility study and detailed engineering study of the Rusumo Falls hydropower project are complete. A likely size of the installed capacity is estimated at 60 MW and interconnection points in Tanzania, Rwanda, and Burundi have been determined. · Scope: Reviewing previous studies and conclude technical feasibility and economic viability for the project. Defining options for project financing and implementation. · Result: Confirmation of technical feasibility and economic viability as well as determining possible ways to finance and implement the project. Study Option 7--Assessment of Benefits and Ranking of Hydropower Candidate Projects in Tanzania to Increase Power Exports · Background: Tanzania has considerable hydropower potential. Projects with an aggregate installed capacity of about 2,400 MW and an average annual production of more than 10,000 GWh have been studied at least to master plan level. Only two of these, representing 580 MW, are included in the current national master plan. The unit cost of generation for these candidate hydropower projects is promising and there is consequently a potential for exports to neighboring countries, for example to Kenya or to the Democratic Republic of Congo-East/Burundi/Rwanda grid. Transmission distances from the Tanzanian grid to these two power grids are also reasonable. · Scope: Conducting studies with the objective of assessing benefits and ranking hydropower candidate projects in Tanzania with a view to increasing power exports. · Result: Indication of unit cost of energy and ranking hydropower candidate projects in Tanzania taking into account increased power exports. Study Option 10--Assessment of Benefits and Ranking of Hydropower Candidate Projects in Uganda to Increase Power Exports · Background: In addition to projects already committed, there are five other new hydropower projects discussed in the master plan study for 54 Opportunities for Power Trade in the Nile Basin Uganda. These projects represent an installed capacity of approximately 1,300 MW and an annual firm energy of about 8,000 GWh. Only some of these projects will be needed in the planning period until 2020 to cover domestic needs and exports at present levels. There is consequently a scope for increased export to Kenya and other neighboring countries in the medium to long term, as the unit cost of generation for these hydropower candidate projects is competitive and the annual distribution of river flows is favorable. · Scope: Studies with the objective of assessing benefits and ranking hydropower candidate projects in Uganda to increase power exports. · Result: Determining the unit cost of energy and ranking hydropower candidate projects in Uganda taking increased power export into account. Study Option 12--Assessment of Unit Cost of Generation for Hydropower Candidate Projects in Ethiopia · Background: A proper assessment of the unit cost of generation for potential hydropower development projects for possible export is extremely important in determining the scope for power export and trade in Ethiopia. While some data available to the Consultant indicated relatively high costs, other data showed more favorable unit costs of generation. These conflicting data are not adequate to allow assessments to be made at this time. Study option 12 is therefore essential to the evaluation of power trade potential in the Eastern Nile subregion. · Scope: Studies with the objective of assessing unit cost of generation for hydropower candidate projects to initiate power export. · Result: Determining unit cost of generation for hydropower candidate projects to initiate power export. Study Option 18--Evaluation of Hydropower Potential in Southern Sudan in Terms of Export to the Nile Equatorial Lakes Region · Background: There is significant hydropower potential totaling about 2,000 MW on the White Nile between Juba and Nimoli. These have previously been studied at master plan level and both small-scale and larger projects have possible. These could be considered for development and supply of the Nile Equatorial Lakes region. · Scope: Studies to define and assess the potential of hydropower projects suitable for development with the purpose of supplying the Nile Equatorial Lakes region. · Result: Determining the technical feasibility and economic viability of hydropower projects in Southern Sudan in terms of export to the Nile Equatorial Lakes region. Scope for Power Trade 55 Study Option 19--Evaluation of Hydropower Potential in Sudan in Terms of Export to Egypt · Background: There are numerous sites with significant hydropower potential in Sudan; these could be developed to export power to Egypt. · Scope: Studies to define suitable hydropower projects and evaluate their potential for power export to Egypt. · Result: Determining the technical feasibility and economic viability of hydropower projects in Sudan in terms of export to Egypt. Power transmission/system Study Option 4--Power Transmission between Rwegura and Kigoma · Background: A new 110 kV transmission line between Rwegura in Burundi and Kigoma in Rwanda has been proposed and terms of reference for a feasibility study have been prepared. If implemented, this project would result in a general strengthening of the Democratic Republic of Congo-East/Burundi/Rwanda grid, in which Rwegura is an important source of generation. This study option is illustrated in map IBRD 32744 at the end of this chapter. · Scope: The scope can include the preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation of the project. · Result: Determination of the technical feasibility and economic viability of the project. Study Option 5--Interconnecting the Democratic Republic of Congo-East­Burundi­ Rwanda Grid and the Tanzania Grid · Background: As indicated in the previous chapter, an interconnection between these two grids might have operational advantages as well as enable more optimal planning of future generation projects, taking the size of some of these candidate projects into consideration. Another advantage could be that some of the load centers in northern Tanzania would be closer to the source of generation. A technical study for this interconnection was done in 1995 by Tractebel, which assessed its technical feasibility. This study was done in connection with the Rusumo Falls hydropower project and envisages interconnection among the Rusumo Falls power plant and Mwanza in Tanzania, Rwinkwavu in Rwanda, and Gitega in Burundi. This interconnection is illustrated in map IBRD 32744. · Scope: The scope can include a reassessment of transfer capacity and voltage level, update of cost estimate, and an evaluation of technical 56 Opportunities for Power Trade in the Nile Basin feasibility including system stability considerations and updated economic evaluation of the project. · Result: Confirmation of technical feasibility and updated economic viability of the project. Study Option 8--Power Transmission between Tanzania and Kenya · Background: As indicated in the previous chapter, the generation expansion plan for Kenya is based largely on thermal power, including considerable diesel generation. Consequently net import of hydropower from Tanzania could be feasible if the price were competitive. The monthly distribution of river flows shows that the projects in Tanzania and the existing hydropower plants in Kenya to some extent are complementary, as the latter have two annual peaks--that is, high flows during October­December--when Tanzania is in its dry season. This is also important in terms of power exchange. The fact that the power markets of the two countries are the largest in the Nile Equatorial Lakes region could add extra benefits. A possible interconnection of the power grids in Kenya and Tanzania could therefore be of interest. This study option is illustrated in map IBRD 32744. · Scope: The scope can be the preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the prefeasibility level. · Result: Determining the technical feasibility and economic viability at the prefeasibility level. Study Option 11--Increased Power Transmission Capacity between Uganda and Kenya · Background: The generation expansion plan for Kenya includes, for the most part, thermal power including considerable diesel generation. Consequently net import of hydropower from Uganda might be feasible if the price were competitive. An important factor that makes it advantageous to have power exchange between Uganda and Kenya is the favorable monthly distribution of river flows from existing and future projects in Uganda. The flow of the Victoria Nile in Uganda is comparatively evenly distributed over the year whereas the flow in the Tana River in Kenya has two typical peaks, March through May and October through December. At present there is a 132 kV transmission line between the Tororo substation in Uganda and the Lessos substation in Kenya. With possibly increased future export from Uganda to Kenya the transmission facilities would need to be strengthened. This could apply to either the distance between Tororo and Lessos or more generally the facilities between Owen Scope for Power Trade 57 Falls in Uganda and the Nairobi area in Kenya. This is illustrated as study options 11a and 11b in map IBRD 32744. · Scope: The scope can be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the prefeasibility level. · Result: Determination of technical feasibility and economic viability at the prefeasibility level. Study Option 13--Benefits of Multipurpose Use of Reservoirs in Ethiopia · Background: The unit cost of generation from the candidate hydropower projects in Ethiopia needs to be fully reevaluated. The costs are currently evaluated purely in terms of hydropower development and these cost data made available to the Consultant vary greatly. Multipurpose use of the water resources would add other benefits, offset the power generation cost, and possibly justify development of transmission facilities and power trade in the future. · Scope: The study would analyze the economic value that can be assigned to a reservoir system that provides multiple benefits. These benefits could include flow regulation, hydropower; increased water availability for irrigation, water supply, and minimum flows; flood management; drought mitigation; and sediment management. · Result: The analysis would provide economic input required for reassessing the upstream power projects in a multipurpose context. Study Option 14--Power Transmission between Ethiopia and Sudan · Background: Interconnecting the power systems in Ethiopia and Sudan may have its advantages. Sudan has a combined hydropower and thermal- based system, whereas the system in Ethiopia is hydropower-based. Interconnecting Roseires in Sudan with the power system in Ethiopia has been studied and found technically feasible without requiring major reinforcements of existing transmission facilities. It is, however, possible that the comparatively weak transmission line between Roseires and Khartoum also would need to be strengthened depending on the amount of power to be transmitted. An alternative could also be to have the connection point in Khartoum. According to that study, the advantages would be better utilization of surplus hydropower energy and flexibility in the timing of new generation capacity. An update of the study would be of interest for power trade. This is illustrated in map IBRD 32742 at the end of this chapter. 58 Opportunities for Power Trade in the Nile Basin · Scope: The scope could be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the prefeasibility level. · Result: Indications of technical feasibility and economic viability at the prefeasibility level. The unit cost of generation for the Ethiopian candidate hydropower project is very important for possible power trade in the Eastern Nile region and three study options have been proposed: Study option 12, which would assess these costs per se; study option 13, in which multipurpose aspects are regarded; and finally study option 11, in which power system advantages, which also may include hydro-thermal complementarity and possible redesign, are explored. These issues and studies are, of course, all related. Study Option 15--Power Transmission between Ethiopia and Kenya · Background: The transmission distance between these power systems is relatively long and a high voltage direct current (HVDC) transmission is likely. Preliminary analysis indicates that the project is not viable in given current power markets. If the amounts of power to be transferred are significant, however, this project could be economically viable in the future. Benefits could derive from net export of power from Ethiopia to Kenya, hydro-hydro complementarities, and general power system advantages. The project is illustrated in map IBRD 32743 at the end of this chapter. The connection points in the two power systems will, of course, be determined by power system analysis. · Scope: The scope could be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the scoping level. · Result: The economic viability is questionable in view of the current power markets. The study could, however, give indications of technical feasibility and economic viability with regard to future power markets. Study Option 16--Power Transmission between Ethiopia and Uganda · Background: The transmission distance between these power systems also is relatively long and a HVDC transmission is likely. Preliminary analysis indicates that the project is not viable given the current state of the power markets. If the amounts of power to be transferred are significant, however, this proposal could be economically viable in the future. Benefits could come from net export of power from Ethiopia to Scope for Power Trade 59 Uganda, hydro-hydro complementarities, and general power system advantages. The project is illustrated in map IBRD 32743. The connection points in the two power systems will, of course, be determined through an analysis of the power system. · Scope: The scope can be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the scoping level. · Result: The economic viability is questionable given the present power markets. The study could, however, determine technical feasibility and economic viability for the future. Study Option 17--Evaluation of the Merowe Hydropower Project in a Regional Context · Background: The Merowe hydropower project, which has a capacity of 1,250 MW, is included in the Sudanese generation expansion plan. The development and implementation of this project may have consequences for other power systems in the region. A preliminary evaluation of this impact could be of importance also in relation with the development of power systems in neighboring countries and future interconnections and power trade. A possible scenario could be that Merowe is interconnected first to the Egyptian grid and at a later point in time, to Khartoum. The project may also influence the possible Ethiopia-Sudan interconnection as described in study option 14. · Scope: Studies to do a preliminary assessment of the possible effect of the Merowe hydropower project on power systems in neighboring Egypt and Ethiopia. · Result: Determination of the effect of the Merowe hydropower project on the power systems in Egypt and Ethiopia. Study Option 20--Power Transmission between Ethiopia and Egypt · Background: This project would most likely be a HVDC transmission line, with a substation in Sudan included for the interconnection of this grid. With the current low-cost gas-fired power generation in Egypt, the profitability of this option would need to be illustrated. The analysis of this option would benefit from being evaluated in the context of multipurpose use of reservoirs in Ethiopia (see study option 13). The project is illustrated in map IBRD 32741 at the end of this chapter. · Scope: The scope can be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic 60 Opportunities for Power Trade in the Nile Basin evaluation at the scoping level. Multipurpose use of reservoirs in Ethiopia should also be taken into consideration. · Result: Determination of technical feasibility and economic viability at scoping level. Study Option 21--Power Transmission between Sudan and Egypt · Background: This project, whose economic viability would depend on the development of the power system in northern Sudan, would most likely be a long HVDC transmission line from this area to, for example Aswan, in Egypt. The connection point in Egypt has to be determined through transmission system studies, however. The Merowe hydropower project is of specific importance in this regard. The project is in map IBRD 32741. · Scope: The scope can be a preliminary assessment of transfer capacity and voltage level, preliminary cost estimate, evaluation of technical feasibility including preliminary system stability considerations, and economic evaluation at the scoping level. Several scenarios of power system development in Sudan and Egypt should be considered. · Result: Determination of technical feasibility and economic viability at the scoping level. Operation and communication Study Option 3--Operation of the Democratic Republic of Congo-East/Burundi/Rwanda Grid · Background: The Consultant's information on the operation and dispatch capabilities of this network is limited. It is known, however, that it has been in operation for a number of years, starting with the development of the Ruzizi I and Ruzizi II power plants. The operation of these power plants and the power exchange are based on their implementation agreements. Possible future generation projects such as the Rusumo Falls and Ruzizi III could be developed jointly. Another observation is that some of the possible future national development projects in the three countries may be somewhat large for development on a national basis, taking the sizes of their power systems into consideration. This need to increase power exchange between the three countries in the future emphasizes the importance of efficient operation of their common grid. Possibilities to complement a more flexible trade (rather than just a fixed sharing of the generating power) should be part of the project focus. · Scope: The scope of work should include an assessment of the network's current status of operation and dispatch capabilities. This relates both to Scope for Power Trade 61 technical facilities and the background and knowledge related to power exchange and trade of the operators in the national utilities. After this assessment further activities should be proposed. The potential benefits of introducing a more flexible trade should be evaluated. · Result: The outcome would be a more suitable operational environment for power trade in the region. Thereafter power trade could be introduced and more economic use of existing facilities could be achieved. The same relates to the development of future generation projects in the subregion. Study Option 22--Basinwide Assessment of Dispatch, Control, and Communication Capabilities · Background: Specific projects or studies related to operation/communication have been difficult to identify given the limitations of a desk study. A more general assessment of such capabilities is therefore proposed for the entire region as this is an important step in laying the groundwork for efficient power trade. · Scope: An assessment of the current status of operation and dispatch capabilities for the entire region. This relates both to technical facilities and the background and knowledge related to power exchange and trade of the operators in the national utilities. After this assessment further activities should be proposed. · Result: The outcome would be a better understanding of the current status of dispatch, control, and communication capabilities for the Nile Basin countries in general. Thereafter further studies or activities could be proposed to possibly improve said capabilities, as more interconnection is developed among the countries and thereby brings the region closer to power trade. Other studies Study Option 6--Identification of Isolated Centers in Northern and Western Tanzania to Be Supplied from the Democratic Republic of Congo-East/Burundi/Rwanda Grid or from Uganda · Background: UEB has recently started to supply one center in northern Tanzania. There are also plans to supply load centers in western Tanzania such as Kigoma, Uvinza, Kasulu, and Kibondo from the network in Burundi. The proposed transmission facilities for the supply of these centers are shown in map IBRD 32744. This proposal will also require new transmission facilities in Burundi; a study on this was completed in 1998. If other isolated centers in northern or western Tanzania were served either by Uganda or from the Democratic Republic of Congo- East/Burundi/Rwanda grid, the network in the region would gradually 62 Opportunities for Power Trade in the Nile Basin develop. Future interconnection of the national grids might then be implemented at an earlier point in time, thus removing a barrier to power trade. · Scope: Identifying isolated centers that could be supplied from the main grids mentioned above. · Result: Possible replacement of diesel-generated power with hydropower and increased quality of supply for the centers. Another anticipated outcome is the development of transmission facilities in the area and better conditions for future power trade and general economic development. Study Option 9--Market-Based Trade between Uganda and Kenya · Background: The current plan of deregulation in Kenya stipulates that KenGen will provide generation from its own installations and from power purchase agreements with independent power producers. A transmission company, KPLC, will buy power from KenGen and supply it to consumers. In this set-up there is scope for greater competition in distribution and thereby more efficient supply of electricity to consumers. In order to identify whether this proposal would contribute to trade, large industrial consumers of power in Kenya could be approached to assess their supply needs. · Scope: A market survey is proposed to identify the willingness by large consumers in Kenya to buy power through directly negotiated supply contracts from neighboring countries. The survey would include the design of a survey and interviews with representatives of large-scale industries, KenGen and KPLC. A market mechanism with trading arrangements suitable for the local conditions should be worked out. · Result: A report presenting the possibilities of developing a power market in which large-scale industries represent the early entrants. An outline of a possible framework for the market will be included with information on policy decisions, laws, and regulations required to implement greater competition in power supply through trade. IBRD 32744 30° 35°Gimbi Nekemte 2.84 Muger Amibara40° 1.3 Gedo Guder Metahara Asbe Teferi Awash OPPORTUNITIES FOR POWER Dembidolo Sor 5 Bedele Weliso Addis Ababa Degeh Bur 0.55 Gilgel Koka 43 TRADE IN THE NILE BASIN Gambela Metu Gibe Awash 2&3 64 Wau 2.8 0.6 Gilo Agaro 180 Adami Tulu Asela STUDY OPTIONS 4,5,6,8,11a & 11bWenz Tepi 0.6 E T H I O P I A Jima Hosaina Alaba Kulito Melka Bonga Wakena 15.3 Ginir 0.4 EXISTING Shashemene EXISTING POWER PLANTS: Kebri Dehar 0.63 TRANSMISSION LINES: Dembi Sodo Awasa Goba HYDROPOWER 0.8 Yirga Alem 220 kV Blatten THERMAL Yadot 0.35 Gode 0.99 100-150 kV Arba DIESEL GENERATOR Minch Shakiso 60-88 kV SUBSTATIONS NATIONAL CAPITALS Jinka 1 Negele 1.1 5° Dolo White Nile odo 0.2 Juba 3.3 SOMALIA Dungu 0.3 Moyale 0.7 Moyo 0.1 Lake Rungu 0.1 Koboko Kitgum Turkana Mungbere N'zoro 1.1 Adjumani 0.1 Isiro 0.1 Arua 0.8 1.5 Rethy 0.3 Moroto 0.5 Solen.1 1.1 Nebbi 0.2 Solen.2 1.1 UGANDA STUDY OPTION 11b Budana 10.3 Lira Kapchorwa Turkwel Juba Lake Soroti Gorge 106 Albert K E N YA Owen Falls Eldoret Mobuku I 5.4 180 Tororo Butuhe 0.3 Mobuku III 10.5 Kampala Kamburu 92 Gitaru 145 Lugazi Lessos Nkenda Masinga 40 Mukono Kindaruma 40 0° Lake Kyendo Kisumu Nanyuki Kiambere 144 Edward Nkonge Kabulasoke 0° Musyenene Mbirizi Muhorni HVDC Rutshuru 0.7 Ruese Mbarara STUDY OPTION 11a Tana 14 Garissa 2.7 Katale 0.3 Chemosit Wanji Mugomba 1.6 Rukungiri Lake Bukoba Line 7 Ruanguba 0.16 Kabale 2.6 Victoria Oikaria 45 45 Nyabiondo 0.14 Kyaka (geothermal) Mokotos Goma B A A Ntaruka 11 Nairobi Athi INDIAN 0.22 B Gihira 2 Masisi E 14 C Munkungwa 12 Musoma 6 0.13 D C F Jabana D Giseney 1 OCEAN Kigali RWANDARwinkwavu E Gifurwe Sultan Kabare L. Kivu Mururu Kigoma Rusumu Falls 60 F Gatsata 2 Bunda Hamud Proposed H.P. Lamu 1.3 This map was produced by the Kiboko Ruzizi I 28.2 Kibogora Marangara 0.2 HVDC Mwanza 18 STUDY OPTION 8 Map Design Unit of The World Bank. Ruzizi II 26,6 Kayenzi 0.8 Mtito K Line The boundaries, colors, denominations Lemera 0.13 H L Buhiga 0.2 Kahama Andei Sabaki J and anyother information shownon this Mungombe G Moshi Uvira BURUNDISanzuRuvyironza 1.3 Mines Karatu 0.1 Arusha Von Rabai map do not imply, on the part of The 5.5 Gitega Shinyanga 3.7 World Bank Group, any judgment on Kamp-Iwiwi Bumumbura Mugere 8 G Snel 1.7 Kilifi Nyumba Maungu the legal status of any territory, or any ene 0.13 STUDY H Cibitoke STUDY Mbulu Same Mombasa Nyemanga Bururi endorsement or acceptance of such 1.6 J Bubanza OPTION 5 Ya Mungu Kipevu I 30 43 Mangembe OPTION 4 1.4 K Rwegura 18 Babati 0.5 8 Kipevu III 75 boundaries. L Gikonge 0.9 2.4 Luama Manyovu Katesh Kasulu Kigoma Urambo Singida 5° 3.9 Uvinza Tabora 1.3 Tanga 5° 10.3 Kondoa 0.5 Hale 21 Pemba Kiyimbi STUDY OPTION 6 Dodoma Pangani 68 LIBYA ARAB Zanzibar REP. OF T A N Z A N I A EGYPT Mpwapwa Ras Kilomoni Mpanda 0.4 ChalinzeTegeta Kunduchi 2 34 Dar es Salaam N I L E Lake Mtera 80 Ubungo Ilala 112 CHAD ERITREA Tanganyika Sumbawanga SUDAN Tosamaganga Iringa DJIBOUTI 2.1 Lake Kidatu 200 B A S I N Rukwa ETHIOPIA Ikwiriri CENTRAL AFR. REP. Lake 0.9 Kihansi Mweru SOMALIA Mbeya Mufindi 180 UGANDA 14 Tanwat KENYA Uwemba RWANDA Tukuyu 0.7 S O U T H DEM. REP. BURUNDI INDIAN Kiwira Njombe 1.3 OF CONGO TANZANIA OCEAN Area of 10° A T L A N T I C main map 10° 0 100 200 300 400 500 Liwale 0.2 Lindi 1.3 O C E A N Mtwara 5.4 MALAWI Nachingwea 1 ZAMBIA Songea 4 KILOMETERS Masasi Ruvuma MOZAMBIQUE Lake Tunduru 4.5 0.7 Malawi Z A M B I A MALAWI 30° 35° M O Z A M B I Q U E40 ° JANUARY 2004 IBRD 32742 40° 45° Wadi Halfa 1.2 OPPORTUNITIES FOR POWER LIBYA TRADE IN THE NILE BASIN ARAB REP. OF EGYPT Area of main map STUDY OPTION 14 N I L E CHAD ERITREA EXISTING TRANSMISSION LINES: SUDAN DJIBOUTI 220 kV B A S I N 20° 20° ETHIOPIA 100-150 kV CENTRAL AFR. REP. 60-88 kV SOMALIA UGANDA EXISTING POWER PLANTS: KENYA RWANDA HYDROPOWER S O U T H DEM. REP. BURUNDI INDIAN OF CONGO THERMAL TANZANIA OCEAN A T L A N T I C Karima 8.2 DIESEL GENERATOR SUBSTATIONS O C E A N MALAWI Atbara 13.6 ZAMBIA NATIONAL CAPITALS MOZAMBIQUE Atbara This map was produced by the Map Design Unit of The World Bank. Shendi 4.4 The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment Khartoum North 35° Omdurman on the legal status of any territory, or Kuku 22.3 New Halfa Kassala 5 Massawa 9 any endorsement or acceptance of Khartoum Burri 90 such boundaries. 10 Asmara Khasham el 15 15° Girba 12.6 15° 7 E R I T R E A Hauzen 0.2 Mashkur El Gedaref Inda Axum Adigrat Humera Silase S U D A N El Fam Wikro 0.4 Sennar 15 Adwa 3 Abiy Adi 0.9 Mekele 4.2 Singa Rabak Metema 0.2 UmRuaba Sekota 2.2 Gonder Korem 1.6 Gorgora Alamata T'ana Hayk'Wereta Lalibela 0.2 Asaita Roseires Weldiya Dubti 1.2 DJIBOUTI 280 HVDC Bahar Dar Nefas 1.2 Nile Line Dangla Mewcha Pawle 1.1 Dese Kombolcha STUDY OPTION 14 Finote Selam White Abbai Bichena Were Ilu 0.4 Debre Markos Mehal Meda 0.6 Asosa 1 Robit 10° Alem Ketema 10° 0.6 Molale Fiche 0.2 Diredawa 5.6 Malakal 22.1 Nejo 0.2 Finchaa Debre Birhan Nekemte 100 Muger Alemmaya 2.9 Sabat Gimbi 2.84 Amibara 1.3 Gedo Guder Metahara Asbe Teferi Awash Dembidolo Sor 5 Bedele Weliso Addis Ababa Degeh Bur Gilgel Koka 43 0.55 Gambela Metu Gibe Awash 2&3 64 0.6 GiloWenz Agaro 180 Adami Tulu Hosaina Asela E T H I O P I A Tepi 0.6 Jima Alaba Kulito Melka Bonga Shashemene Wakena 15.3 Ginir 0.4 Dembi 0.8 Sodo Awasa Yirga Alem Goba Blatten 0 100 200 300 Arba Yadot 0.35 KILOMETERS 35° Minch Shakiso 40° JANUARY 2004 IBRD 32743 Nile 40° 45° OPPORTUNITIES FOR POWER Dongola 3.4 TRADE IN THE NILE BASIN Karima 8.2 LIBYA ARAB REP. OF EGYPT STUDY OPTION 15 & 16 Atbara 13.6 Area of N I L E EXISTING main map TRANSMISSION LINES: CHAD ERITREA SUDAN 220 kV Atbara DJIBOUTI B A S I N 100-150 kV Shendi 4.4 ETHIOPIA CENTRAL 60-88 kV AFR. REP. EXISTING POWER PLANTS: Khartoum North SOMALIA Omdurman Kuku 22.3 UGANDA Massawa 9 New Halfa KENYA Kassala 5 HYDROPOWER Khartoum Burri 90 RWANDA Asmara THERMAL S O U T H 10 DEM. REP. Khasham el BURUNDI INDIAN 15 15° OF CONGOGirbaTANZANIA7 12.6 15° DIESEL GENERATOR OCEAN E R I T R E A A T L A N T I C Hauzen 0.2 SUBSTATIONS Mashkur El Gedaref Inda Axum Adigrat MALAWI Humera Silase NATIONAL CAPITALS S UODC A N E A N Wikro ZAMBIA El Fam 0.4 Sennar 15 Adwa 3 Obeid 11.2 MOZAMBIQUE Abiy Adi 0.9 Mekele 4.2 This map was produced by the Singa Map Design Unit of Rabak Metema The World Bank.The boundaries, 0.2 UmRuaba Sekota colors, denominations and any 2.2 Gonder Korem 1.6 other information shown on this Gorgora Lalibela Alamata map do not imply, on the part of T'ana Hayk' Wereta 0.2 Asaita The World Bank Group, any Roseires Weldiya Dubti 1.2 DJIBOUTI judgment on the legal status of 280 Bahar Dar Nefas 1.2 any territory,or any endorsement 30° 35° Dangla Mewcha or acceptance of such 1.1 Pawle Dese Kombolcha boundaries. WhiteNile Abbai Finote Selam Bichena Were Ilu 0.4 Debre Markos Mehal Meda 0.6 Robit 10° Asosa 1 Alem Ketema 10° 0.6 Molale Fiche 0.2 Diredawa 5.6 Malakal 22.1 Nejo 0.2 Finchaa Debre Birhan Nekemte 100 Muger Alemmaya 2.9 S O M A L I A Sabat Gimbi 2.84 Amibara 1.3 Gedo Guder Metahara Asbe Teferi Awash Dembidolo Sor 5 Bedele Weliso Addis Ababa Degeh Bur Gilgel Koka 43 0.55 Gambela Metu Gibe Adami Tulu Awash 2&3 64 0.6 Gilo Agaro 180 Asela Wenz Tepi 0.6 Jima Hosaina E T H I O P I A DC Converter Alaba Kulito Bonga Station Melka Shashemene Wakena 15.3 Ginir 0.4 Warder 0.18 Dembi 0.8 Sodo Awasa Kebri Dehar 0.63 Yirga Alem Goba Blatten Gode 0.99 Arba Yadot 0.35 Minch Shakiso Nile Jinka 1 Negele 1.1 5° 5° STUDY OPTION 16 Dolo Shebelli White Line STUDY OPTION 15 odo 0.2 Juba 3.3 Moyale 0.7 Moyo 0.1 HVDC Lake S O M A L I A Koboko Kitgum Turkana N'zoro 1.1 Adjumani 0.1 Rethy 0.3 Arua 0.8 Moroto 0.5 Line Solen.1 1.1 Nebbi 0.2 Solen.2 1.1 UGANDA Budana 10.3 Lira HVDC Kapchorwa Turkwel Gorge Juba Lake Soroti DC Converter 106 Albert Station K E N YA Eldoret Owen Falls Mobuku I 5.4 Kamburu Mobuku III 10.5 Kampala180 Tororo 92 Gitaru 145 Lugazi Lessos Nkenda Masinga 40 Mukono Kindaruma 40 I N D I A N Kyendo Kisumu Nkonge Nanyuki Kiambere 144 Kabulasoke 0° L.Edward Mbirizi Muhorni Mbarara Tana 14 Garissa 2.7 Chemosit O C E A N RutshuruRukungiri Lake Wanji Victoria 7 0 100 200 300 0.7 Oikaria 45 Kabale Bukoba 2.6 (geothermal) 45 Ntaruka 11 Kyaka DC Converter Nairobi Athi KILOMETERS Gifurwe 14 Musoma 6 Station RWANDARwinkwavu Jabana Sultan Kigali 35° Hamud 40° 45° JANUARY 2004 IBRD 32741 25° 30° 35° 40° M e d i t e r r a n e a n S e a OPPORTUNITIES See inset for detail FOR POWER TRADE Kafr.Damietta Matrouh Mahmudiya 488 B.Elabed S.Krir Sh. 1125 P.Said IN THE NILE BASIN E. 64 60 ABK 900 Rafah 7.3 Omayed 325Somid I&S Arish L I B YA B.Arab BghadadM Free.Z. Qant. STUDY OPTION 20 & 21 L. Qarun Amiryia East Gefgafa 1.3 Spining Cairo A.Zabal Buhirat E. Nokhi 2 30° A.Matamir O.Mousa 30° Boston Sadat W. Basous Tabbin CairoSuez 14.8 500 185 A R A B Kuremiat 14.8 Taba EXISTING TRANSMISSION LINES: 1254 Demo Dahab 21.6 500 kV Nowebaa B. Suef Tour 16.6 220 kV Nile Delta Detail B. Suefe S.Catrin 6 Mediterranean Sea Maghaga 100-150 kV Maghaga W. Sh.El Shiek 107 Kafr. Damietta Samalut Minya 60-88 kV Mahmudiya Sh. 1125 P.Said W. Bhareya Malawi ABK 900 488 E. 64 EXISTING POWER PLANTS: Talkha 793.5 Walida Gamalia Suez R E P. O F Walida 600 HYDROPOWER Assuit PS 90 Hurghada Iron &Simuha 647 Abis Assuit 500 Nile Steel Damanhur Manayif Tema THERMAL Abis I.Baroud Mansura Canal Cem Assuit 1 Qant. Sohag DIESEL GENERATOR Dekh Kafr. Tanta East Cem Assuit 2 Qenas Safaga Dauwar Zagazig Gerga Amiryia 440 T.Badr Minuf SUBSTATIONS Naga Hamad Qena Spining Boston Basous Abusultan A. Tartour NATIONAL CAPITALS A. 600 Alumn Luxor A.Matamir Cairo W. Zabal Mot Balat 4.7 Esna 90 25° Sadat Esna 25° Suez 11.6 Tabbin 185 Kharga 7.2 Edfo Fero. Silicon 500 E G Y P T Komombo Area of main map Kima Aswan Dam 615 El Sail Lake Nasser High Dam 2100 LIBYA ARAB DC Converter REP. OF Station EGYPT HVDC Wadi N I L E L. Nuba Halfa CHAD ERITREA 1.2 Line SUDAN DJIBOUTI B A S I N ETHIOPIA STUDY OPTION 21 CENTRAL AFR. REP. 20° SOMALIA 20° 20° UGANDA Nile KENYA RWANDA S O U T H DEM. REP. BURUNDI INDIAN Dongola 3.4 OF CONGO TANZANIA OCEAN A T L A N T I C DC Converter Station Karima 8.2 O C E A N MALAWI STUDY OPTION 20 Z A M B I A Atbara 13.6 HVDC MOZAMBIQUE Line Atbara Shendi 4.4 Khartoum North Omdurman Kuku 22.3 New Halfa Kassala 5 Khartoum Burri 90 10 Asmara Khasham el 15° DC Converter Station Girba 12.6 7 ERITREA15 Mashkur El Gedaref Inda Axum Humera Silase S U D A N El Fam 0.4 Al-Geneinah Al Fashir Sennar Adwa 3 1.5 5.2 Obeid 11.2 15 Singa Rabak Metema Nyala 11 0.2 UmRuaba Sekota Gonder This map was produced by the Map Design Unit of The World Bank. 2.2 0 100 200 300 Gorgora The boundaries, colors, denominations and any other information shown Nile Lalibela 0.2 on this map do not imply, on the part of The World Bank Group, any T'ana Hayk'Wereta Roseires judgment on the legal status of any territory, or any endorsement or KILOMETERS 280 Bahar Dar Nefas acceptance of such boundaries. 25° 30° White 35° Dangla Mewcha Pawle 1.1 JANUARY 2004 4 Framework for Developing Power Trade in the Nile Basin Summary of Main Findings and Options 4.1 The Nile Basin could be divided into two subregions--the Eastern Nile and the Nile Equatorial Lakes regions. At this time there is no international power trade in the Eastern Nile region comprising Ethiopia, Eritrea, Sudan, and Egypt. It is also important to note that there are no transmission facilities among the countries that could enable such trade. 4.2 In the Nile Equatorial Lakes region, which includes Democratic Republic of Congo-East, Burundi, Rwanda, Tanzania, Uganda, and Kenya, there is some power trade, but its level is rather modest. Hydropower from Uganda is an important element of this trade, which comprises export to Kenya and small amounts of electricity to isolated centers in Tanzania and Rwanda. This trade is characterized as bilateral trade between state-owned utilities. 4.3 There is also power export from Democratic Republic of Congo-East to Rwanda and Burundi, because the three countries have jointly developed two hydropower plants located in the Kivu province of Democratic Republic of Congo. It is understood from the reference documents that this export is based on agreements related to the implementation of the Ruzizi I and Ruzizi II projects. 4.4 Electricity demand in the Nile Basin countries, except Egypt, remains modest, ranging from 108 GWh per year in Burundi to 3,695 GWh per year in Kenya. The per capita consumption of electricity ranges from 18 kWh per year in Burundi to 53 kWh per year in Tanzania. Throughout the region, with the exception of Egypt, only 10 percent or less of the population has access to electricity. The demand in Egypt is about 56,500 GWh or about 15 times the corresponding figure for Kenya, and accounts for about 85 percent of total electricity consumed in the Nile Basin countries. 4.5 Electricity demand forecasts for the years 2005 and 2020 predict a total consumption of about 105,000 GWh and 241,000 GWh, respectively. These figures are 67 68 Opportunities for Power Trade in the Nile Basin about 70 percent and 280 percent higher than demand in 1999--which means considerable amounts of new power generation capacity will be required. 4.6 The energy resource endowment of the region is considerably greater than its foreseeable energy needs. The energy potential for electricity production alone is 1,000 TWh per year or equal to a sustainable generation for the next 40 years of almost 15 times the current level of generation in the area. Excluding Democratic Republic of Congo, which contains the huge energy potential of the Congo River basin, the power generation potential of the Nile Basin countries for about half a century is probably about 550 TWh/year, of which natural gas and hydropower represent approximately even shares of 40 percent each. 4.7 The potential benefits from power trade in the region are substantial based on the cost savings of meeting electricity demand from a combination of national sources and international exchange of power, as compared to meeting demand from domestic sources only. This was analyzed in detail in chapter 2. Several options considered important for future development of power trade were identified for future study in chapter 3 and are listed in table 4.1. 4.8 The findings presented in chapters 2 and 3 also indicate that power trade in the Eastern Nile needs to be evaluated in the context of a broader multipurpose approach to water resources development and management, as summarized below. Water Resources and Power 4.9 A number of water resource and multipurpose elements can form the basis for the development of new projects or a revision of existing projects to reap benefits from regional power trade. Opportunities in this respect can be derived from some of the facts presented in chapter 2 of the draft data reports. Some examples of generic application of such concepts are summarized below: Exploitation of the appreciable variation in evaporation throughout the Nile Basin 4.10 The Lower Nile and nearby areas to the north evaporate on average some 2.0 to 1.75 times as much water from open surfaces as the Ethiopian Highlands or the Lake Victoria Basin.8 The Sudd apparently experiences average evaporation rates of about 0.7­ 0.8 times those of the Lower Nile and Khartoum rates and approximately 1.3­1.4 times the Lake Victoria rates. Water potentially saved annually in reduced evaporation by theoretically shifting storage reservoirs within the basin can be visualized, in a simplified fashion, per 100 km2 open surface area as follows: · From the Khartoum area to the Ethiopian Highlands: 0.15 km3 · From Wadi Halfa (Lower Nile) to Lake Victoria: 0.12 km3 · From the Lower Nile to the Sudd: 0.06 km.3 8Illustrated by the simplified application of available evaporation rates listed in table 2.4 of draft data report. Framework for Developing Power Trade 69 Table 4.1: Study Options No. Name 1 Evaluation of the Ruzizi III Hydropower Project for future supply of the Democratic Republic of Congo-East/ Burundi/Rwanda Grid 2 Evaluation of the Rusumo Falls Hydropower Project for future supply of the Democratic Republic of Congo-East/Burundi/Rwanda Grid 3 Operation of the Democratic Republic of Congo-East/Burundi/Rwanda Grid 4 Power Transmission between Rwegura and Kigoma 5 Interconnecting the Democratic Republic of Congo-East/Burundi/Rwanda Grid and the Tanzania Grid 6 Identification of isolated centers in northern and western Tanzania to be supplied from the Democratic Republic of Congo-East/Burundi/Rwanda Grid or from Uganda 7 Assessment of benefits and ranking of hydropower candidate projects in Tanzania to increase power export 8 Power transmission between Tanzania and Kenya 9 Market-based trade between Uganda and Kenya 10 Assessment of benefits and ranking of hydropower candidate projects in Uganda to increase power export 11 Increased power transmission capacity between Uganda and Kenya 12 Assessment of unit cost of generation for Ethiopian candidate hydropower projects 13 Benefits of multipurpose use of reservoirs in Ethiopia 14 Power transmission between Ethiopia and Sudan 15 Power transmission between Ethiopia and Kenya 16 Power transmission between Ethiopia and Uganda 17 Evaluation of the Merowe Hydropower Project in a regional context 18 Evaluation of hydropower potentials in Southern Sudan in terms of export to the Nile Equatorial Lakes region 19 Evaluation of hydropower potentials in Sudan in terms of export to Egypt 20 Power transmission between Ethiopia and Egypt 21 Power transmission between Sudan and Egypt 22 Basinwide assessment of dispatch, control, and communication capabilities 4.11 The extreme theoretical illustration of these roughly estimated facts is that a reservoir in the Lower Nile with 1,000 km2 open surface shifted to the Ethiopian Highlands would result in a yearly flow increase to the Lower Nile of about 1.5 km3 or nearly 2 percent of the annual flow volume into Lake Nasser. 70 Opportunities for Power Trade in the Nile Basin 4.12 Another illustration of these estimates is provided by considering Lake Nasser draw-downs to reduce open water surface and thus evaporation losses. Simplified calculations suggest that each 5 percent reduction in surface area from full reservoir level would mean a flow increase downstream of nearly 1.0 km3 per year or more than 1 percent of the annual flow volume arriving at Lake Nasser. Exploiting seasonal variations in runoff within power-producing basins of the Nile Basin countries 4.13 This is best illustrated by comparing existing and potential hydropower basins in the three East African countries. The Tanzanian basins of Rufiji and Rumakali experience peak flows during December­May. The Kenyan basins of Tana and Ewaso Ngiro have their main high flow season coincidentally with the main peak of the Tanzanian basins, but an additional short rainy period occurs from October through January. The Victoria Nile in Uganda experiences a nearly constant flow with the lowest mean monthly flow at 80 percent of the highest mean monthly flow. 4.14 These considerable seasonal variations among basins of reasonable proximity open up a potential for power exchange that should benefit all three countries if fully exploited . A quantification of available power for trade during the various seasons and pricing regimes, considering both existing and planned power schemes, should yield interesting results. Such an analysis should internalize the valuation of environmental benefits (for example, avoided pollution and greenhouse gas emissions, biodiversity conservation, socioeconomic effects, regional development) to the degree possible in the given settings. Taking advantage of multinational and multipurpose potentials of new reservoir schemes in the Ethiopian Highlands 4.15 Thus far these have been studied in a single-country, single-purpose context. Although dams have been assessed as relatively expensive, the terrain features enable deeper reservoirs with relatively low evaporative losses and offer potentials for sediment management. Dam sites need to be located with maximum concern for socioeconomic impact, where watershed management costs can be offset against regional development benefits. Renewed justification for such dam projects should come from downstream benefits that will accrue in a coordinated operation of the dams involved in the system. Benefits will theoretically derive from net reduction in evaporative losses by lowered reservoir levels downstream, when storage is shifted to the upstream highlands; flood control and drought mitigation; downstream low flow augmentation to better meet minimum flow requirements for water supply, irrigation, navigation, fisheries, aquatic ecosystems, and so on; improved sediment management through coordinated release schedules; and potentially improved water availability for irrigation and other benefits downstream. These benefit considerations can only be qualitatively described at this stage. The complex planning problems that may be formulated under such conditions lend themselves to review through systems analysis approaches for comprehensive treatment, but can be simplified by scrutinizing a few parameters at a time. Framework for Developing Power Trade 71 Win-win opportunities created by considering irrigation abstractions and cropping patterns in a more comprehensive context 4.16 Electrification of pumping schemes, shifts in cropping patterns, and improved water management have a high potential for yielding benefits in terms of fuel economics, agricultural economics, water availability downstream, and external environmental effects brought on by fuel switching and water conservation. Availability of power to electrify pumped irrigation on the White Nile and Jebel Aulia Reservoir could mean efficiency gains in energy and less dependence on high water levels behind the dam. Each 10 percent reduction in reservoir area from the full 1,500 km2 level would theoretically add approximately 0.4 km3 of annual downstream water availability or 0.5 percent of the annual flow volume. Power Sector Reform 4.17 This section addresses the ongoing power sector reform efforts of the Nile Basin countries as a basis for a framework of regional power trade. 4.18 Information on power sector reform available in the source material of the study varied to a large extent. For some countries--such as Kenya, Egypt, and Uganda--the information was quite good. In other cases--such as for Burundi, Ethiopia, Tanzania, Democratic Republic of Congo, Rwanda, and Sudan--good updates have been made using information received directly from the respective countries. Based on the information available, the general impression is that all governments have embarked on power sector reform to improve efficiency in operation and the financial viability of the sector. In a few cases, such as Kenya, Uganda, and Ethiopia, the reform process appears to be well advanced. 4.19 The power sector deregulation models chosen are adapted to specific national circumstances. A common trend is that competition has been introduced or is being introduced in generation: independent power producers enter into license agreements with the government-owned power producer, which is normally the previously state- owned vertically integrated monopoly after unbundling and/or some reorganization. 4.20 National transmission companies with the possibility of open access have in most cases not yet been formed and transmission is taken care of by the government-owned power producer. In distribution, unbundling is at best in a very early stage. Thus, neither vertical and horizontal unbundling is much advanced. Division of responsibility among entities, overall supervision and policymaking, regulation, and operation are defined and implemented to a limited extent. Some of the Nile Basin countries have introduced or are considering the introduction of an independent regulator. 4.21 In general, therefore, deregulation of the power sector in the region is at an early stage. The restructuring efforts that are taking place are, however, moving developments in a direction that is conducive to increased regional power trade. The status of power sector reform in the region is summarized in table 4.2, based on the more detailed presentations made in the draft data reports. Table 4.2: Status of Power Sector Reform in the Region Country Maturity of the reform Regulator established Independent power Transmission access Market characteristic process producers permitted Burundi The text of the laws Not yet. Yes, very soon, after Not yet Power is still ruling the power and passing the necessary exclusively sold by drinking water sector laws. REGIDESO and is to be studied by DGHER, Burundi's Parliament in April government-run utility 2000. The Government companies. These has already expressed institutions distribute its willingness to open power right to the the power sector to consumers' home. privatization. Congo, Dem. Rep. There is still no institutional reform. Production, transmission, distribution, and sales of energy is handled by the state-owned company, SNEL. Egypt In progress since 1984. Under consideration Yes (1996). The power sector still Several laws of (1997). operates much as a deregulation vertically integrated introduced. state company, but unbundling is in progress both in generation and distribution. 72 Table 4.2: Status of Power Sector Reform in the Region (continued) Country Maturity of the reform Regulator Established Independent Power Transmission Access Market Characteristic process Producers Permitted Eritrea Only policy statements Corporatization and of will to deregulate privatization of the Department of Energy being discussed. Ethiopia In progress since 1997. Yes, operational since Yes. Yes, by proclamation. The State power Proclamation and October 1998. utility, EELPA, has regulation have been been corporatized and issued. Directives are called EEPCo. Foreign under preparation. and local private investors are allowed to invest in hydropower generation without capacity limit. Kenya The reform process in The Electricity Operation of There is no access as Previous monopolies is now completed. The Regulatory Board was independent power yet, although the in the public sector final step was the established through the producers commenced governing legislation have been reorganized transfer of all public Electric Power Act with two power mentions that contracts into generation, sector­owned power 1997 and started purchase agreements for the transmission transmission, and generating assets to operating in 1998. signed in 1996. Two network services are to distribution companies. KenGen and all the independent power be approved by the Two independent transmission and producer plants started regulator. power producer plants distribution assets to operating in 1997. Two have been in operation KPLC. more power purchase since 1997, two power agreements have since purchase agreement been signed. were signed in 1998, and another power purchase agreement is currently being negotiated. 73 Table 4.2: Status of Power Sector Reform in the Region (continued) Country Maturity of the reform Regulator Established Independent power Transmission Access Market Characteristic process producers Permitted Rwanda Preparation of information required to support the tender process for the selection of private sector operators for the sectors. Assistance given during the negotiations and signing of the agreements. The preliminary report is available. Sudan Reform is in process No, awaiting Yes, since 1996. No. The power sector still since late 1998. The "Electricity Act" operates as a state "Electricity Act" has approval. corporation with been prepared for unbundling in Government approval. distribution, which is in progress. Independent power producers in generation are developing, even before the legal frame is approved. 74 Table 4.2: Status of Power Sector Reform in the Region (continued) Country Maturity of the reform Regulator Established Independent power Transmission Access Market Characteristic process producers Permitted Tanzania The Government has Legal and regulatory Yes. Open access under an A move toward more already made a framework is in independent competitive markets in decision to restructure process. Transmission Systems the electricity sector is the power sector to Operator is expected. in its infancy with allow for private some competition participation established in generation. Uganda A new Electricity law Yes. Yes. Yes. Ring fenced business was enacted in unit within the November 1999. transmission company will be responsible for bulk purchase and supply of electric power. In the longer- term, distribution companies and large consumers will contract generation capacity directly with generators. Introduction of limited retail competition will be in the medium term. Note: Blank cells indicate that information is not available in the source material of this study. Source: Power experts of the Nile Basin countries 75 76 Opportunities for Power Trade in the Nile Basin 4.22 The governments of the region express their policy on cross-border trade in energy only to a very limited extent. Some of the countries have international cooperation in electricity trade on a bilateral basis, notably Democratic Republic of Congo-East, Burundi, and Rwanda through the Great Lakes Economic Community (CEPGL); Kenya- Uganda; and Egypt-Libya. A few isolated areas in Tanzania and Rwanda are also supplied from Uganda. There is no information on clauses for wheeling of power. Market Considerations 4.23 As reviewed in chapter 1, there are many considerations involved in establishing a well-functioning regional market in electricity. Such considerations can include coordination and joint efforts in policies; planning, financing, construction, and operation of generation and transmission facilities; power sector reform; and regulation including pricing of transmission, dispatch, and institutional arrangements, all within acceptable environmental parameters. Policy Concerns Regional organizations 4.24 Experience from other regions of the world shows that existing power markets have typically been set up under the umbrella of some recognized organization for economic development. This was the case with SADCC, established in 1980 on the basis of consensus decisions. 4.25 SADCC was initially a "loose" organization with the main objective of coordinating its nine member countries' development efforts, primarily through definition of regional projects and joint efforts to finance them. In this, the Annual Consultative Conferences among officials from the member countries and the international donor community played an instrumental role. As the cooperation matured, SADCC was reorganized into tighter cooperation as a community, giving birth to SADC. Other examples of similar regional organizations are the European Union and Nordic cooperation (Nordisk Råd). 4.26 Such regional organizations can provide the initial forum required to launch the dialogue for regional cooperation. They provide a place where officials, donors, and the industry can meet and get to know each other. Step by step, common understanding and confidence is established that forms a basic condition for regional development. 4.27 Specific national policy initiatives and mandates to promote power trade do not yet exist in the Nile River Basin. These national policy mandates have proven instrumental in fostering cross-border trade in electricity. For example, in the SAPP Inter- Governmental Memorandum of Understanding, the Governments provide the utilities of the region with the mandate to trade power and to form the SAPP organization, as well as agreeing to promote power trade at the national level. The countries of the Mekong river basin are developing a similar policy mandate for their utilities. Such initiatives include Framework for Developing Power Trade 77 the decision to establish a regional energy organization among governments and among power companies, where options for power trade can be analyzed, promoted, and approved or recommended to a specified decisionmaking body. Notably on technical issues, there is a need for the operators--the specialist experts in the power sector--to get together. This is probably key to moving regional power trade ahead, as the technicians are the ones with hands-on experience to assess the viability of power trade options. This is proven by the experience in the electricity subsector (that is, the technical meetings) of SADC and Nordel described in chapter 1. Cooperation at the technical level as well as the policy level, through what could be termed a "power forum," can therefore be expected to be a key instrument in advancing power trade in the Nile Basin region. Policy on self-sufficiency in electricity supply 4.28 Studies of documents related to the energy sector or power subsector of the Nile Basin countries reveal that they all have self-sufficiency in power supply as a priority. If this were also the case with power trading, the countries would have to balance import with export over a period of time, for example a year. Trading could definitely be advantageous in this context alone, taking power system benefits such as security of supply and reduced reserve margins into consideration. However, if a certain degree of net import or dependency on neighboring countries were to be accepted, the fuller benefit of power trade in the region could be realized. Harmonization of power sector reforms, particularly concerning power trade 4.29 Laws and regulations have to be adapted to the level of sophistication required for power trade, as discussed in chapter 1. International power trade can begin to operate where regulatory regimes differ; however, the creation of a well-functioning market typically requires consensus on certain key issues. These issues include the extent of deregulation in transmission and consequently transmission network ownership and operation, wheeling arrangements for transit of power, dispatch arrangements, and standardization of equipment, including the compatibility of communications equipment. At this point in time and the development of power trade in the region, no distinct proposal on these issues has emerged. However, the framework for moving forward already presented addresses these issues of harmonization and the possible role of a power forum in this respect. Technical Concerns Network development 4.30 Power system development projects identified to strengthen the physical infrastructure for power trade were presented in chapter 3. Some of these projects, which are expected to prove viable when studied, will establish the transmission capacities required to realize existing and near-term potential benefits of power trade in the region. An important technical limitation in these projects is the distances among some of the Nile Basin countries, specifically in the Eastern Nile region. 78 Opportunities for Power Trade in the Nile Basin Planning 4.31 The projects include regional system planning studies by sub-basin to meet the early requirements in developing power trade, and the need to coordinate national planning initiatives by including regional considerations. 4.32 No transmission system analysis has been undertaken for the purpose of this scoping study. Problems with stability and voltage are likely to occur for the proposed projects, and have to be studied in detail at a later stage. The main cause of the problems is the length of the transmission lines and the fact that the existing transmission systems in the region are relatively weak. There are several ways to deal with this obstacle, as indicated below: 4.33 Traditional equipment such as shunt- and series capacitors is often used. Installation of power systems stabilizers on selected generators is also a well-known solution. 4.34 New technology such as flexible AC transmission systems could also be used. Today this equipment is relatively expensive, but it may be useful for satisfying the need for increasing power transmission in the future, even between weak power systems. Dispatch 4.35 The dispatch and communication arrangements required to facilitate power trade in the region will depend on the extent and viability of alternative options for regional power trade. Currently the limited amount of cross-border transmission minimizes the need for uniform operational arrangements. 4.36 In general, adequate dispatch capabilities are an important factor for power trade. This relates generally both to regional utilities within a national power market and to national utilities in an international market. However, with the present structure of the power industry in the region in mind, this will in most cases be a matter for the national utilities. The activities indicated below could be undertaken and prepared by power utility personnel well in advance of actual trading. The list is quite detailed to reflect the importance of a compatible and reliable network infrastructure for power trade. In some cases, there would be a need for training before or assistance during the implementation of the activities. Identifying grid capacity 4.37 This could encompass the following: · Establish single-line diagrams and update the Nile Basin Grid map; · Collect equipment capability information, including ratings, impedances, governor models, temperature limits, and so on; · Define equipment connections at and between system nodes and identify limiting equipment ratings; and Framework for Developing Power Trade 79 · Define binding transfer capability limits for import/export based on transmission capacity. Defining quality requirements 4.38 Discuss and quantify power system requirements such as the following: · Acceptable frequency deviation during normal operation; · Time deviation; · Frequency bias; and · Frequency control reserve. Emergency plans 4.39 This will include discussion and agreement on procedures in case of outages and other unforeseen events. Maintenance coordination 4.40 This could include the following: · Preparation and coordination of generation and transmission outage plans; and · Power system analysis. 4.41 Other matters, more closely related to the daily dispatch and trading itself, are listed next. Generation and demand forecast 4.42 This may include the following: · Prepare demand forecasts for the next day depending on weather conditions and the like; · Work out a generation schedule for all generators in the network; and · Prepare the generation/demand forecast for the next day and check the balances. Online power system control matters 4.43 The following should be considered: · Coordination and approval of outages; and · Supervision of voltages, currents and power transfer, frequency, and so on. 80 Opportunities for Power Trade in the Nile Basin Institutional Concerns Existing power trade organizations 4.44 With the exception of the cooperation among Democratic Republic of Congo- East, Burundi, and Rwanda through the CEPGL and SINELAC, there is no interregional organization for power trade among the Nile River Basin countries. The limited amount of bilateral trade in electricity that takes place is handled by state-owned power utilities, notably UEB of Uganda and KPLC of Kenya. Regional energy cooperation also takes place in the East African Community under whose auspices an interconnection study is being undertaken. Institutional capacity 4.45 The institutional capacity and capabilities available to handle power trade cannot be assessed with a great degree of certainty from the source material of this study. However, indications are that the power companies/utilities of the region as a whole have limited expertise in power trade. The legal frameworks, power trade agreements, market operation, and so on are generally not in place. Most probably there is a need to train personnel in the power subsector of the Nile Basin countries, in order to establish an enabling environment for power trade. Regional operation protocol 4.46 Such a protocol is required to govern the operation of a regional transmission network (see the list of technical grid requirements above). The protocol would include detailed requirements related to the planning, design, and operation of an interconnected transmission system. Commercial Concerns Pricing of transmission services 4.47 Transparent pricing of electricity promotes the development of a power market. (see chapter 1). Transmission services need to be priced separately and without cross- subsidy between generation/distribution and transmission. Because transmission is a "natural" monopoly, this requires restructuring, either by unbundling transmission from generation and distribution or through accounting principles. This has to be coordinated in cross-border power trade and puts demand on the harmonization of national power sector restructuring arrangements dependent on the sophistication in power trade. A regulator will be needed to prevent unreasonable transmission and distribution pricing. Cost of supply 4.48 The review of existing data on generation and transmission underscores the difficulties in identifying the actual costs of electricity supplies in the region. In practice, such information is not in the public domain. Consequently the actors in the market face a difficulty in identifying the cheapest sources of supply and cannot easily exploit them. A transparent market with information on the cost of electricity supplies to all actors is Framework for Developing Power Trade 81 therefore required to fully realize the potential benefits of trade. The current situation with only limited information on the costs of supply is thus a barrier to the development of regional markets and trade in electricity. 4.49 Supply monopolies, which still prevail in many countries of the region, also contribute to obscuring the costs of supply. Furthermore, market concentration in supply is an obstacle to free competition. Information available in the source material of this study makes it clear that there is a need to further reduce the market dominance of the state-owned, vertically integrated power supply monopolies--which would lead to supply competition in supply and in turn, probably, to more efficient supply at lower cost to the end-users. Political risk mitigation 4.50 Political risk is carefully considered by private investors. In order to attract private finance for large-scale, cost-efficient power projects in the region, which almost in every case requires a cross-border market in order to become competitive, the political risk should be manageable. Well-functioning regional organizations supported by the host governments could provide some comfort to investors by reducing the political exposure. Creating markets 4.51 The domestic electricity markets of the Nile Basin countries are small compared to the potential output of the most cost-efficient power generation proposals the region. The lack of a sufficiently large market with purchasing power for electricity is thus a key constraint to cost-efficient development of both hydropower and gas-fired thermal power generation. Power trade could contribute to overcoming this obstacle by pooling the demand in two or more countries for supplies from the least-cost supply alternatives in a regional context. Open access to the transmission network could facilitate such power trade, for instance if large consumers in Kenya could purchase power from the lowest bidder in Uganda and have the power transmitted under transparent and regulated pricing of the transmission services. This idea could be discussed as an example of creating power markets in the power forum, if established. Investment climate 4.52 Most of the country risks present in large-scale energy projects in the region also apply to possible cross-border projects. Such risks include lack of energy laws and regulations and the capacity to enforce them, currency nonconvertibility, insecure purchasing power of the electricity buyer, potential interference by governments, and breach of contracts or concession agreements. Again, a regional organization could assist where such issues of importance to regional projects can be addressed and solutions to them proposed for action by the host governments. 82 Opportunities for Power Trade in the Nile Basin Environmental Concerns 4.53 Regional power trade in the Nile Basin carries with it potentials and opportunities that have an effect on the environment. Some of these are briefly discussed below. Project siting 4.54 New hydropower schemes should be located away from environmentally harmful project sites (to avoid, for instance, infringement on national parks and wetlands, resettlement problems, serious biodiversity losses, and so on). Site selection should give due credit to benign sites where environmental impacts can be mitigated such as run-of- river schemes, sites with minimal ecosystem and sociocultural losses, sites that have watershed management integrated with the project, and the like. 4.55 An environmental screening exercise to flag undesirable sites where unmitigable impacts may form clear obstacles to project development would be desirable. Screening parameters should include issues such as avoiding the following: · Proximity to or encroachment on national parks; · Wetland impacts; · Inundation of major biomass (carbon storage) resources; · Biodiversity reduction; · Forced resettlement; and · Other impacts of a more site-specific nature. Fuel switching 4.56 A host of environmental benefits may be realized by substituting coal/oil/gas-fired thermal generation plants--which emit SO2 NOx, particulate matter, and CO2 and thereby add to local pollution, regional acidification, and global warming threats--with environmentally benign hydropower. Offsetting land degradation 4.57 The substitution of wood fuel dependency and its potential watershed degradation effects with hydropower-based rural electrification that incorporates watershed management has several environmental effects. Among other things, it reduces local pollution and health problems, limits greenhouse gas emissions, abates land degradation, mitigates flash flooding, and affects downstream sedimentation. Benefits can be substantial in downstream reaches and should be credited to upstream projects if sediment loads are diminished and low-flow augmentation combined with flood peak reduction result. Framework for Developing Power Trade 83 Multipurpose planning 4.58 New hydropower schemes should be designed to incorporate contemporary concepts of multipurpose planning and environmentally sound design concepts such as the following: · Seeing relocation from a developmental perspective and making it voluntary, based on affected people's ability to share in benefits; · Creating hydraulic structures that incorporate water quality and sediment management techniques such as selective withdrawal at high dams, sediment sluicing, minimum releases based on well-researched in-stream flow requirements, releasing simulated natural flow and water quality conditions, and the like; and · Internalizing upstream watershed management and agroforestry and agricultural community development in hydropower schemes. 4.59 By internalizing the valuation of such environmental factors in the economic analysis of hydropower schemes, their chances of acquiring a feasible status will increase and win-win scenarios may result. Environmentally sound planning 4.60 The listed environmental premises for power trade in the Nile Basin suggest that efforts should be spent on screening potential hydropower sites for "environmental soundness features" comprising potential opportunity elements such as the following: · Run-of-river potentials; · Reservoir schemes that can serve sediment and water quality management roles; · Schemes in social settings where relocation may be made voluntary; and · Schemes in areas where regional development and combat against land degradation can be aided. Framework for Moving Forward 4.61 It would be too ambitious to forecast a specific long-term structure for power trade among the Nile Basin countries. However, some ideas on how to move forward are presented below for review and discussion by representatives of the power sector in the region. Development of mutually acceptable forms of power trade 4.62 In order to materialize, power trade in the Nile Basin depends on consensus among the participating countries and agreements by governments to embark on and encourage power trade. Tighter economic cooperation, such as common markets or communities, can only be envisaged in the very long-term perspective. 84 Opportunities for Power Trade in the Nile Basin 4.63 Once initial consensus has been reached, a next step in clarifying the potential benefits of greater trade of electricity in the region is to assess the results of this desk study and agree on a framework of cooperation. This would involve policy decisions to define how power trade could be promoted under the Nile Basin Initiative, which provides a framework to promote joint economic development among the Nile Basin countries. In this vein, important issues that would likely be presented and further discussed and agreed at a policy level, possibly in an Energy Ministers Meeting (as in the case of SAPP), include the following: · Regional trade policy that meets priorities in supply reliability; · Framework of cooperation; · Institutional forum mechanism to continue dialogue (see the subsection on power forums below); · Regional projects of mutual interest to develop power trade; · Project promotion and financing; and · Data availability, collation, and presentation. Incremental evolution of power trade 4.64 Models of power trade differ from region to region when international exchange of power takes place. In all cases, it has taken a long time to develop the power trade, and the development has gone through phases from a single-buyer market through third-party access and open access to competitive markets. In general, solutions applied have historic reasons as well as reflecting natural conditions and advances in technology, including recent computer and communication innovations that facilitate operation of competitive power markets (for instance, spot, term, and financial power trade markets). 4.65 For the Nile Basin countries, the challenge is to establish a framework of power trade that is adapted to their specific situation and future developments as they can be envisaged from the presentation in chapter 2. In this, experience from other regions can be utilized, and adapted to fit regional circumstances. 4.66 An evolution of international electricity markets also can be envisaged for the region, where power trade matures with the overall economic development and the ongoing restructuring of the electricity sectors. Subregions 4.67 The pace and character of developments could possibly differ in the two subregions of the Nile River Basin, as defined in chapter 3. In the Eastern Nile region power trade could, for instance, start out with bilateral trading between national utilities. Gradually, it could mature with the unbundling of utilities and more decentralized trading patterns, depending on the development of the power sectors in the countries concerned. 4.68 The specific trading regimes that are conducive to the Nile Equatorial Lakes region will start from the bilateral trade under the one-to-one seller/buyer regime that Framework for Developing Power Trade 85 takes place among state power utilities. As power sector reforms materialize in the subregion, the power trade regime could possibly mature quite quickly into a loose pool with close cooperation among independent state-owned transmission system operators. Coordination in dispatch, technical standards, and regulation of transmission prices would then have to be included. Eventually, a competitive market in subregional power trade might materialize. 4.69 The Direct Current links identified could possibly be developed in the private sector under Special Purpose Companies, a solution that could prove feasible when the time comes to implement the projects in the distant future. 4.70 In the longer-term perspective, these subregional markets might be merged into a regional interconnected market of all the Nile Basin countries. Power forums 4.71 As already mentioned, the region would benefit from a regional mechanism, referred to here as a power forum, which could address all aspects of power trade, including institutional, legal, technical, economic, financial, and environmental issues of relevance. The institutional arrangements for a forum would need to be developed based on the objectives and functions desired by the Nile Basin countries. The forum could range from an informal technical organization to a more structured organization with technical and policy levels; one possibility is outlined below. 4.72 A power forum could serve as a body for cooperation among system operators-- in other words, the technical personnel from the region's power companies. The forum could include representatives from state-owned utilities, independent power producers, transmission and distribution companies, and large consumers. Experience in power trade in the region could be included through representatives of CEPGL and SINELAC. 4.73 The power forum could act as the secretariat for meetings of the Energy Ministers. To this end, it could present recommendations for decision by the Energy Ministers and arrange their meetings. 4.74 The types of issues that could be addressed by the power forum could include, but are not limited to, the following: · Preparing projects to be promoted through the International Consortium for Cooperation on the Nile (ICCON) for financing and implementation; · Regional energy policy; · Power system regulation and reform in the context of regional markets; · Power system planning; · Human resource development requirements; · Environmental opportunities and constraints; and 86 Opportunities for Power Trade in the Nile Basin · Relationships with other institutions (national and regional institutions and the donor community). 4.75 The power forum would be designed to benefit all participating countries in the Nile Basin. The idea would be to draw on both local and international expertise to tailor solutions to the specific conditions in each country. The development of a framework to facilitate regional power trade would form an integral part of this effort. Based on a review of the power trade potential and the status of power sector reform in the Nile Basin countries, the Consultant believes that there is a need to exchange views on the alternative models of power sector reform to see how the national initiatives are, or could be designed to be, conducive to promoting international power trade in the region. If the Nile Basin countries are interested in pursing increased levels of power trade, the types of issues of regional concern that could be addressed and coordinated regarding power sector reform include the following: · Compatibility of existing deregulation efforts with regional power trade requirements; · Network standards; · Dispatch and communication arrangements; · Regulation, notably pricing of transmission services; · Agreements for international trade; · Dispute resolution arrangements; and · Wheeling arrangements. 4.76 Other issues that could be addressed by a power forum relate primarily to (a) the planning and operation of power systems and (b) the financing/implementation of projects such as the following: Power system planning and operation · Load forecasts and generation/transmission planning (least-cost regional expansion); · Generation and transmission projects for system expansion (investment programs); and · Requirements for a secure interconnected system operation and control. Project financing/implementation · Exchange of experience in project promotion (financing; contracts; contacts with investors, banks, contractors, suppliers, and so on); and · Conferences/meetings with investors, donors, and others to promote and secure financing of regional projects. Framework for Developing Power Trade 87 4.77 Subregional power forum meetings might prove more efficient than regional ones as some of the questions to be addressed would be of particular interest to a few of the countries with power trade and not to the others. However, in discussions on models and modes of power sector reform, a common interest in harmonization exists and all member countries stand to benefit from and contribute to successful power trade in the region. 4.78 In human resource development, a power forum could explore ways of using the existing national institutions for regional training. 4.79 A power forum could also contract regional power system studies as agreed, for instance those given priority from the study options defined in chapter 3 and discussed as `Next Steps' below. For this purpose, the organization would need to have a budget provided by host governments and foreign contributors, private and public sources, or possibly the companies that are participants in the forum. Evaluation and prioritization of power trade development options 4.80 A review of the study options identified in this study would clarify whether the proposed regional initiatives meet the national priorities and whether there are additional options that should be considered. This type of evaluation and prioritization would need to be made by the Nile Basin country governments themselves. Next Steps · Developing policy consensus · Developing a strategy framework for moving forward · Establishing a power forum · Conducting further studies · Reviewing study options for the purpose of promoting power trade Conclusion 4.81 This final scoping study shows that based on the hydropower resources of the Nile, significant opportunities for competitive electricity generation exist in combination with international power trade. 4.82 To exploit this potential, a specific challenge for the Nile Basin countries is establishing a framework of power trade that is adapted to the specific characteristics of the region. 4.83 An incremental evolution of power trade in the Nile Basin can be envisaged in which power trade matures with the overall economic development and the ongoing restructuring of the electricity sectors in the region. The speed and sophistication of development in electricity exchange may vary by subregion. 88 Opportunities for Power Trade in the Nile Basin 4.84 A number of policy issues need to be addressed in order to advance power trade in the region. Such issues include the policy on regional trade, framework of cooperation, establishment of a mechanism to continue regional dialogue through a power forum, regional electricity projects, and the availability of national data for regional planning and implementation of projects. 4.85 Cooperation in power trade in the Nile Basin will need to be based on regionwide consensus. Once this has been reached, a next step in clarifying the potential benefits increasing regional electricity trade is assessing the results of this desk study. The four main proposals to start the consensus-building process are as follows: · Establish a policy consensus to promote power trade in the Nile Basin region; · Establish a power forum; · Advance the scoping study; and · Identify, at a preliminary level, priority projects to be considered within the NBI's two subsidiary action programs (for the Eastern Nile and the Nile Equatorial Lakes regions). Appendix 1 Reference Documents Country Document name Document year Burundi ESMAP. Issues and Options in the Energy Sector. 1992 Burundi ESMAP. Activity Completion Report, Presentation of Energy 1985 Projects for the Fourth Five-Year Plan. Burundi ESMAP. Energy Assessment Status Report. 1984 Burundi Burundi Country Paper. Etat General des Ressources en Eau et n.d. Leur Utilization au Burundi. Burundi Projet de Rehabilitation du Secteur de l'Energie. 1998 Burundi Etude d'Electrification regionale/Burundi-Tanzanie. ICM, 1998 Financement Banque Africaine de Developpement (BAD). Burundi Rapports annuels d'activites de la REGIDESO et de la DGHER. Burundi Estimation de la societe Andover. Burundi Economie Burundaise, Ministère de la Planification du 1997­98 Developpement et de la Reconstruction. Burundi Etude d'Evaluation du sector de l'energie 1999­2000, volume 1998 2, Berocan International. Burundi Enquête sur la consommation d'energie dans les menages, F. 1994 Nkurunziza. Burundi Politique Sectorielle du Ministère de l'Energie et des Mines. May 1999 Democratic SAR, Second Power Project. 1986 Republic of Congo Democratic ESMAP. Zaire, Issues and Options in the Energy Sector. 1986 Republic of Congo 89 90 Appendix 1 Country Document name Document year Democratic Zaire Country Paper. Perspective d'une Cooperation pour le n.d. Republic of Developpement Harmonieux du Bassin du Nil. Congo Democratic Perspectives d'electrification des centes du Haut-Zaire,du 1995 Republic of Nord-Kivu, du Mariema, du Sud-Kivu et du Nord-Shaba, Male Congo Cifarha. Democratic Rapport d'Exploitation, Production/Transport, SNEL. 1998 Republic of Congo Democratic Plan Directeur Regional de l'Energie des Grands Lacs, 1993 Republic of Tractereb. Congo Egypt The Electricity Interconnections in the Southern and Eastern 1999 Mediterranean Countries.Observatoire Mediterranean de l'Energie, Mannfred Hafner. From World Bank Energy Week, 1999. Two sections on Egypt. Egypt Project Information Document on the Sidi Krir Power Project. 1998 (The Bank subsequently cancelled its participation in the project.) Egypt Egypt Energy Statistics 1997. hhtp://ritsec 1997 www.com.eg/govern/oecp/egstat.html. Egypt ESMAP. Arab Republic of Egypt. Energy Sector Assessment. 1996 Egypt Nile Basin Country papers: Egypt. The Water Resources and n.d. Potential for the Future Development in the Nile Basin. Egypt Nile Basin Country Papers: Egypt: Integrated Approach to n.d. Water Resources Development. Egypt Water Resources Development. Country Report. Egypt. n.d. Egypt The Egyptian Experience in Hydropower, S. Aboulnasr, M. El- n.d. Gassar, A. Assad. Egypt Country Paper: Fifth Nile 2002 Conference. 1997 Egypt Reactive Power Compensation in the Egyptian 500 kV 1997 Network. CIGRE-Conference Paper, Cairo, 1997. Egypt International Action Programme on Water and Sustainable 1991 Agricultural Development. United Nations. Egypt "Environmental Impacts of the Aswan High Dam, A Case 1989 Study." Water Resources Development 5(3). Egypt Electric Power Sector Review - Policy Note. 1997 Egypt EIU Data Base--Misc. Notes on Egypt. 1999 Reference Documents 91 Country Document name Document year Egypt IFC Project Memorandum--Sidi Krir Project. 1999 Egypt Energy Statistics 1996­1996. 1997 Egypt Power Sector Review--Policy Note. 1999 Egypt Egyptian Electricity Authority Annual Report of Electric 1997 Statistics. Egypt Espicom Power Intelligence, Power Generation Markets-- 1997 Egypt Background. Eritrea Eritrea Electric Authority, Sydkraft International. Masterplan: 1993 Generation and Transmission 1993­2000. Ethiopia Tekeze River Basin Integrated Development Master Plan 1998 Project. Executive Summary and Sector Reports. Ethiopia Ministry of Mines and Energy of Ethiopia (Petroleum 1998 Operations Department), Beicip Franlab Petroleum Consultants. Calub Gas Large Scale Development Project. Final Report. Executive Summary Vol. 1: Main Report; Vol. 2: Annexes. Ethiopia Abbay River Basin Master Plan, Water Resource Study, Pt. 1, 1998 Main Report, Appendices. Ethiopia IRG. "Ethiopia Petroleum Product Pricing and Market Study, 1997 Draft Report." Ethiopia EELPA. Power Sector Development Program (1995/6­ 1996 1999/2000). Second Draft Report., Addis Abeba. Vol. I: Executive Summary, Vol. II: Main Report and Appendices. Ethiopia Tekeze Medium Hydropower project, Pre-Feasibility Study, 1996 Executive Summary, Vol. 1, Draft. Ethiopia ESMAP. Energy Assessment. 1996 Ethiopia Baro-Akobo River Basin Integrated Development Master Plan 1996 Study, Vol. 1, Executive Summary. Ethiopia EELPA, Acres International. Ethiopia Power System Planning 1996 Study--1995 Update, Draft, May 1996. Vol. 1: Main Report. Vol. 2: Appendices. Ethiopia Calub Gas Development Project. Staff Appraisal Report. 1994 Ethiopia CIDA, ACRES-EdF, "Etude de l'interconnexion Djibouti- 1989 Ethiopie," Rapport Final, Dec. 1989.Vol. 1: Rapport Principal. Vol. 2: Annexes. Ethiopia ESMAP. Issues and Options in the Energy Sector. 1984 Ethiopia Land and Water Resources of the Blue Nile Basin--Main 1964 Report: Ethiopia, U.S. Bureau of Reclamation. 92 Appendix 1 Country Document name Document year Ethiopia Land and Water Resources of the Blue Nile Basin, Appendix 1964 V, Power: Ethiopia. U.S. Bureau of Reclamation. Ethiopia Photocopies of a Presentation on the Ethiopian Power n.d. Distribution Project by the World Bank (Al Gulstone). Ethiopia Frame Work for Cooperation between the Nile River States. n.d. Ministry of Natural Resources and Environmental Protection. Ethiopia Country Paper: Fifth Nile 2002 Conference. 1997 Ethiopia "Implications of Ethiopian Water Development for Egypt and n.d. Sudan." Water Resources Development 3(2). Ethiopia Energy Statistics 1996­1996. 1997 Ethiopia World Bank, ESMAP Report, Calub Gas Company. 1996 Kenya Fifth Nile 2002Conference, Country Paper. The 1997 Comprehensive Water Resources Development of the Nile Basin--Basis for Cooperation. Kenya ESMAP. Kenya Power Loss Reduction Study. 1996 Kenya World Bank Project Information Document. Kenya Energy 1994 Sector Investment Project. Kenya SAR. Geotermal Development and Preinvestment Project. 1988 Kenya ESMAP. Energy Assessment Status Report. 1984 Kenya ESMAP. Issues and Options in the Energy Sector. 1982 Kenya Kenya Country Paper. "Policies, Plans and Constraints of n.d. Water Resources Development in Lake Victoria Basin of Kenya." Kenya Energy Statistics 1996-1996 1997 Kenya Update of Least-Cost Power Development Plan. 1997 Kenya Electricity Tariff Study. 1998 Kenya Implementation Assistance in the Reorganization of the Power 1999 Sub-Sector in Kenya. Kenya SAR. Energy Sector Reform and Power Development Project. 1997 Kenya Kenya Power and Lighting Company--Annual Report. 1998 Kenya Generation Statistics for 1999. 1999 Rwanda ESMAP. Issues and Options in the Energy Sector. 1991 Rwanda SAR. Power Project. 1984 Rwanda ESMAP. Issues and Options in the Energy Sector. 1982 Rwanda Rwanda Country Paper. Water Resources. n.d. Rwanda Newspaper Article on Uganda/Rwanda Agreement. 1999 Reference Documents 93 Country Document name Document year Sudan Osman, E. Hamad, "Optimal Operation of a Reservoir during a 1993 dry season." Ph.D. dissertation, University of Newcastle-upon- Tyne. Sudan Republic of Sudan, National Electricity Corporation. Long 1993 Term Power System Planning Study, Main Report, Acres International. Sudan SAR. Power IV Project. 1987 Sudan SAR. Petroleum Technical Assistance Project. 1984 Sudan ESMAP Report. Issues and Options in the Energy Sector. 1983 Sudan Sudan Country Paper. Strategy for Enhancing Cooperation n.d. with the Co-Basin States of the Nile Basin. Sudan National Electricity Corporation. Long Term Power System 1993 Planning Study, Executive Summary. Sudan Country Paper: Fifth Nile 2002 Conference. 1997 Sudan The Jonglei Canal, Impact and Opportunity. 1988 Sudan Blue Nile Waters Study, Phase I A, Availability and Use of 1978 Blue Nile Water, Vol. 2, Supporting Reports. Sudan Energy Statistics 1996 1997 Sudan Country Report 2nd Quarter 1999. 1999 Sudan NEC Annual Report. 1998 Sudan Hydropower Development Plan 1999­2005. n.d. Tanzania ACRES International--TANESCO. Power System Master 1999 Plan, Draft Final Report, Main Report, Vol. 1: Appendices A & B; Vol. 2: Appendices C, C1, C2, D, E1 and E2; Vol. 3: Appendices F and G. Tanzania SAR. Songo Songo Gas Development and Power Generation 1997 Project. Tanzania SAR. Power Rehabilitation Project. 1986 Tanzania ESMAP. Issues and Options in the Energy Sector 1984 Tanzania Country Paper: Fifth Nile 2002 Conference. 1997 Tanzania SAR. Songo Songo Gas Development and Power Generation 1997 Project. Tanzania Energy Statistics 1996 1997 Tanzania Second Quarter Country Report 1999. Gen. Stat. 1993­97. 1999 Tanzania Generation Data, Jan. 1998­Aug. 1999. 1999 Tanzania MEM: Draft Energy Policy Options. 1999 94 Appendix 1 Country Document name Document year Tanzania MEM: Proceedings of the Workshop on the Review of the 1999 1992 National Energy Policy. Tanzania MEM: A Framework for a National Programme to Promote 1988 Renewable Energy Technologies and Energy Conservation in Tanzania. Tanzania MEM: Summary of the Geology of Tanganyika Part IV 1981 Economic Geology, by B. F. Harris. Tanzania MEM: Tanzania Electricity Industry Policy and Industry 1999 Restructuring Framework. Tanzania MEM: Woodfuel Use in Tanzania Rural-Based Industries. 1999 Tanzania MEM: 14th Meeting of the Tripartite Commission for the East 1999 African Cooperation. Tanzania Planning Commission: Economic Review. 1998 Tanzania TANESCO/JICA: Feasibility Study on Kihansi Hydroelectric 1990 Power Development Project. Tanzania TANESCO: Corporate Business Plan 1999­2002. 1999 Tanzania UDAS/MOW: Cooperation in Energy Development in Eastern 1983 Africa in Reference to the Planning of Rusumo Falls Hydroelectric Project, by S. R. Nkonoki. Tanzania MOW/KBO: Rusumo Falls Hydroelectric Power Project 1996 Synthesis Document. Tanzania TANESCO: Grid System Annual Generation by Plant/Station. 1999 Tanzania TANESCO: Generation Data 1997­1999. 2000 Tanzania TANESCO: Annual Reports 1997, 1998. n.d. Uganda Power Sector Restructuring and Action Plan 1999. 1999 Uganda Power Sector Characteristics for 1998 and 1999. 1999 Uganda Environmental Impact Statement, Final Report, Executive 1999 Summary, AES/Nile WS Atkins. Uganda Environmental Impact Assessment, Final Report, Vol. 1: Main 1999 Report. Uganda Environmental Impact Assessment, Final Report, Vol. 2: 1999 Supplementary Reports. Uganda Optimization Study, Hydrology of Nile River, Draft Report, 1999 EDF. Uganda D. Creamer. "Owen Falls Hydropower Plant: Proposed 1999 Extension--Units #13­15," Draft Report. Reference Documents 95 Country Document name Document year Uganda Proposed Extension to Owen Falls Generating Station, 1990 Feasibility Study Report, Vol. 1: Executive Summary, Acres. Uganda Note. "Update of the Hydrology of the Victoria Nile," by 1998 Acres International. Uganda Power Sector Strategy Document, IDA Strategy 1998. 1998 Uganda Connection to 132kV transmission network: Scoping and 1998 Environmental Impact Study, Report of Scoping Studies. AES/Nile WS Atkins. Uganda Kennedy and Donkin, in association with A. Gibb, Uganda 1997 Electricity Board. Hydropower Master Plan, Part 1, Final Report. Vol. 1: Executive Summary. Vol. 2: Main Report. Vol. 4: Appendices. Vol. 6: Report of the Hydrology of the Nile below Lake Victoria. Vol. 7: Hydrology and Hydropower Potentials of Non-Nile Rivers. Vol. 8: Environmental Impact Assessment (Stage 1). Uganda ESMAP. Uganda Energy Assessment. 1996 Uganda ESMAP. Kikigati Mini-Hydro Rehabilitation. 1992 Uganda Worlld Bank Staff Appraisal Report. Third Power Project. 1991 Uganda Acres International and Uganda Electricity Board. Proposed 1990 Extension to Owen Falls Generating Station. Vol. 1: Executive Summary; Vol. 2: Technical Report; Vol. 3: Appendixes. Uganda ESMAP. Power System Efficiency Study. 1988 Uganda ESMAP. Issues and Options in the Energy Sector. 1983 Uganda Uganda Country Paper. Environmental Aspects of Water n.d. Resource Management in Uganda. Uganda Karuma Falls Hydropower Project, Uganda, Project 1999 Definition, Vol. A, Main Report, Final Draft. Uganda Karuma Falls Hydropower Project, Uganda, Project 1999 Definition, Vol. B, Site Investigations and Ground Conditions, Final Draft. Uganda Karuma Falls, Hydropower Project, Overheads. 1999 Uganda Uganda Electricity Board. Tariffs for Supply of Electricity 1999 1993. 96 Appendix 1 Country Document name Document year Uganda Uganda General Statistics 1993­97. 1999 Uganda UEB. Selected Performance Indicators, 1999. 1999 Uganda Newspaper Article on Uganda/Rwanda Agreement. 1999 Uganda Uganda--Power Sector Restructuring and Privatisation. 1999 Uganda The Electricity Bill. 1999 Uganda State of Environment Report for Uganda 1998. n.d. Uganda Ministry of Energy and Mineral Development reports and n.d. papers. Uganda UEB Statistics and Data. n.d. Uganda UEB Report and Accounts. n.d. Djibouti SAR. Geothermal Development Project. 1989 Multinational Uganda, Tanzania, Kenya. Preparation of East Africa Power 1999 Master Plan. Terms of Reference (Study began 2002) Multinational Ethiopia-Sudan. IVO for EELPA and NEC, Ethiopia-Sudan 1995 Power Systems Interconnection Study Project, Phase I, Feasibility Study Update, Main Report. Multinational Burundi, Rwanda, Tanzania, Uganda. Tractebel for KBO. 1995 Technical Study of the Interconnection of Networks Linked to Rusumo Falls Hydro-Electric Power Plant, Vol. 1: Text; Final Edition, Vol. 2: Tables, Figures and Appendices. Multinational Burundi, Rwanda, Tanzania, Uganda. Tractebel for KBO. 1995 Study of Technical and Economic Justificationof the Interconnection of Networks Linked to Rusumo Falls Hydro Power Plant, Vol. 2: Tables, Figures and Appendices, Final Edition. Multinational ESMAP. Burundi, Rwanda, Zaire. Evalution de l'Energie des 1989 Pays des Grandes Lacs (EGL). Multinational Sutcliffe. Hydrology of the Nile. n.d. Multinational Rusumu Falls Hydroelectric Scheme, Tractionel Electrobel 1988 Engineering. Multinational Political Controversies over the Allocation of Nile Waters. An 1998 International Case Study. Multinational Sub-Saharan Africa Hydrological Assessment Final Report, 1989 Introductory Volume. Sir Alexander Gibb and Partners in association with British Geological Survey and Institute of Hydrology. Multinational Report of the UNDP Workshop for the Nile Basin Countries, 1986 Bangkok, Thailand. Reference Documents 97 Country Document name Document year Multinational Nile River Basin Cooperative Framework Project, Summary of 1999 Relevant Water Resources and Related Data in the Public Domain. Multinational The Nile Basin Initiative, Report to ICCON, III. The Nile n.d. Today, B. The Environmental Dimension. Multinational Opportunities for Regional and International Cooperation in 1992 the Nile Basin, in "Water International", Vol. 17, No. 3. Multinational Problem Definition and Stakeholder Analysis of the Nile River 1995 Basin. Multinational Nile River Basin Development. 1992 Multinational Water and Agriculture in the Nile Basin (Nile Basin Initiative 1999 Report to ICCON). Multinational Energy Statistics 1995­1996: Electricity production, TWh. 1997 Multinational Energy Statistics 1995­1996: Electricity production from 1997 fossil fuels, TWh. Multinational Energy Statistics 1995­1996: Electricity Consumption by end 1997 use, GWh. Multinational Energy Statistics and Balances of Non-OECD countries. 1997 Multinational Power Sector Reform and Efficiency Imptovement in Sub- 1995 Saharan Africa. Multinational ESMAP Annual Report 1998. 1999 Multinational International River Basin Organizations in Sub-Saharan 1994 Africa. Multinational Agreement Uganda/Rwanda (Newspaper Article). 1999 Multinational A Decision Support System for the Nile River. Georgia 1999 Technical University. Multinational Future Coal Prospects, Country and Regional Assessments. n.d. Wocol World Coal Study. Multinational Water and Agriculture in the Nile Basin. Background Paper 1999 Prepared by FAO. Multinational Development of Regional Electric Power Network; 1994 UNDP/World Bank. Multinational Impact of Power Sector Reforms on International Electricity 1996 Trade; UNDP/ESMAP. Appendix 2 Energy Potential and Balance of the Nile Basin Countries 99 Table A2.1: Energy Resources (in physical units) Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Total Dem. Rep. Commercial Hydropower 300 100,000 2,810 30,000 1,400 115 5,100 4,700 2,000 146,425 (MW) Oil 37 522 65 0 0 624 (106 TOE) Natural gas 51 1,135 114 51 80 45 0 1,475 (109 Sm3) Coal 50 27 15 350 442 (106 Tons) Geothermal 700 1,050 340 450 2,540 (MW) Traditional Woodfuel 13 25,000 74 12 1,800 1,190 28,090 (106 m3) Crop residue 0 49 15 230 295 (106 m3) Notes: Oil, natural gas, and coal--data in the source material on reserves are limited and often sparsely specified. When available, recoverable reserves have been used. Methane (including coal bed), oil shale, and tar sands are not included Sources: National energy experts or Ref.6.13 101 Table A2.2: Commercial Energy Potential (GWh/yr) Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Total Dem. Rep. Hydropower 1,314 438,000 18,462 0 131,400 6,132 504 22,338 20,586 8,760 647,495 Oila) 0 4,082 58,373 0 0 0 0 7,269 0 0 69,723 Natural gas b) 0 8,176 181,568 0 18,160 0 8,096 12,800 7,264 0 236,064 Coalc) 0 3,700 1,998 0 1,110 n.a. 0 0 25,900 0 32,708 Geothermald) 0 0 0 0 4,599 6,899 2,234 0 0 2,957 16,688 Total 1,002,678 Notes: a) 40 years depletion period and thermal plant efficiency of 35%, that is, conventional oil steam power plant. b) 40 years depletion period and thermal plant efficiency of 58%, that is, modern combined cycle power plant. c) 40 years depletion period and thermal plant efficiency of 33%, that is, coal steam power plant. d) 75 percent load factor assumed. Table A2.3: Developed Commercial Electricity Generation Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Total Dem. Rep. Hydropower 120 0 10810 1145 3295 0 1074 1748 805 18,997 Petroleum 8 0 21352 103 355 0 989 0 0 22,807 products Natural gas 0 0 25399 0 0 0 0 0 0 25,399 Coal 0 0 0 0 0 0 0 0 0 0 Geothermal 0 0 0 68 390 0 0 0 0 458 Total thermal 8 0 46,751 171 745 0 989 0 0 48,664 Source: Country reports (hydropower); Energy balances of ICCON Member States (hydrocarbons and geothermal). 102 Table A2.4: Utilization of Potential (Generation as Share of Potential [%]) Burundi Congo, Egypt Eritrea Ethiopia Kenya Rwanda Sudan Tanzania Uganda Total Dem. Rep. Hydropower 9 0 59 1 54 0 5 8 9 3 Petroleum 0 37 14 33 products Natural gas 0 14 0 0 0 0 11 Coal 0 0 0 0 0 Geothermal 1 6 0 0 3 103 Appendix 3 Nile Basin Countries' Generation Expansion Plans Table A3.1: Burundi Future Generation Expansion Year Project name/type Installed Average Firm Total system energy Total system capacity energy energy (GWh) capacity (MW) (MW) prod. prod. Required Surplus Required Surplus (GWh) (GWh) 2000 49 193.2 145.9 143.8 49.33 27 22 2001 3rd unit Ruzizi II 53.43 219.2 171.9 160.7 58.5 30.6 22.6 2002 - 53.43 219.2 171.9 170.1 49.1 32.4 21.03 2003 Doubling of Nyemanga 54.83 231.4 184.1 172.7 58.7 33 21.83 2004 54.83 231.4 184.1 178.8 52.6 34 20.83 2005 54.83 231.4 184.1 185.2 46.2 35.3 19.53 2006 54.83 231.4 184.1 189.2 42.2 36 18.83 2007 54.83 231.4 184.1 196 35.4 37.3 17.53 2008 Mpanda 65.2 261.4 214.1 203.2 58.2 38.6 26.6 2009 65.2 261.4 214.1 210.9 50.5 40.1 25.1 2010 65.2 261 213.7 221.7 39.7 42.2 23 2011 Kabu 16 82.2 363.4 265.9 233 130 44.3 37.9 2012 82.2 363.4 265.9 245.5 117.9 46.7 35.5 2013 82.2 363.4 265.9 258.7 119.7 49.2 33 2014 82.2 363.4 265.9 272.8 90.6 52 30.2 2015 82.2 363.4 265.9 287.8 75.6 54.8 27.4 2016 82.2 363.4 265.9 304 59.4 57.8 24.4 2017 82.2 363.4 265.9 321 42.4 61 21.2 2018 Mule 34 94.7 435.4 299.9 340 95.4 64.7 30 2019 94.7 435.4 299.9 360 75.4 68.5 26.2 2020 94.7 435.4 299.9 381.6 53.8 72.6 22.1 105 106 Appendix 3 Table A3.2: Burundi Future Generation Expansion (High Scenario) Year Project Name/Type Installed Average Firm Total System Energy Total System Capacity Energy Energy (GWh) Capacity (MW) (MW) Prod. Prod. Required Surplus Required Surplus (GWh) (GWh) 2000 49.00 193.2 145.9 143.8 49.33 27.0 22.00 2001 3rd unit Ruzizi II 53.43 219.2 171.9 160.7 58.50 30.6 22.60 2002 53.43 219.2 171.9 170.1 49.10 32.4 21.03 2003 Doubling of 54.83 231.4 184.1 172.7 58.70 33.0 21.83 2004 Siguvyaye 144.80 717.4 670.0 404.8 312.00 77.0 67.80 2005 144.80 717.4 670.0 409.3 308.00 78.0 66.80 2010 144.80 717.4 670.0 439.0 278.00 83.5 61.30 2015 144.80 717.4 670.0 510.0 207.00 97.0 47.80 Table A3.3: Democratic Republic of Congo-East Generation Projects Envisaged for the SNEL Development Plan Hydro Thermal Province Orientale Rehabilitation of Tshopo (18.8 MW) Rehabilitation of Tshopo (12 MW) Rehabilitation of Budana (13.5 MW) Rehabilitation of Buta (0.52 MW) Bengamisa (15 MW) Bondo, Basoko, and Bafwasende Nepoko (10 MW) North Kivu Mungomba (40 MW) None Semiliki (28 MW) South-Kivu Rehabilitation of Ruzizi I (40MW) None Ruzizi III (82 MW) Maniema Kamimbi (7.5 MW) Kindu: installation of a 1,350 kVA unit (temporary solution) Kasongo: installation of 1,000 kVA unit Kimbombo: installation of a 350 kVA unit Kabambare: installation of a 250 kVA unit Lubutu: installation of a 250 kVA unit Generation Expansion Plans 107 Table A3.4: Egypt Demand Forecasts Demand--Category or Area No. 2000/ 2001/ 2002/ 2003/ 2004/ 2005/ 2006/ 01 02 03 04 05 06 07 Demand Total GWh Domestic 66,152 70,979 75,940 81,046 86,322 91,764 97,462 Peak 12,470 13,322 14,156 15,040 15,897 16,786 17,670 Export (GWh) Losses (GWh) 13,001 13,488 13,965 14,446 14,852 15,239 15,593 Required generation (GWh) 78,652 83,909 89,407 95,257 100,964 106,904 112,993 Table A3.5: Egypt Required Capacities before 2004 Plant Name Capacity (MW) Type of Technology Commission Year Sidi Krir (1,2) 650 Steam 2000 Ayoun Mousa 650 Steam 2000 Zafarana 120 Wind 2001 Sidi Krir (3,4) 650 Steam 2002 Suez Gulf 650 Steam 2003 Port Said East 650 Steam 2003 Total 3,370 Table A3.6: Egypt Required Capacities, 2004­06 Plant name Capacity (MW) Type of technology Commission Year Zafarana (5) 30 Wind 2004 Cairo North (1) 500 Combined cycle 2004 El Kurimat 150 Solar/Gas 2004 Nobaria (1) 500 Combined cycle 2005 Cairo North (2) 500 Combined cycle 2005 Zafarana (6) 200 Wind 2005 Nobaria (2) 500 Combined cycle 2006 Nag Hamadi 64 Hydro 2006 Total 2,444 108 Appendix 3 Table A3.7: Egypt Required Capacities, 2007­10 Plant Name Capacity Type of Technology Commission (MW) Year Cairo West (7,8) 650 Steam 2007 Zafarana 100 Wind 2007 Borg El Arab (1) 300 Solar/Gas 2007 Safaga 500 Combined cycle/water desalination 2007 El Kuriemat (3) 650 Steam 2008 Sharm El Shiekh 500 Combined cycle/water desalination 2008 Ayoun Mousa (3,4) 650 Steam 2009 Borg El Arab (2) 300 Solar/Gas 2009 Toshky (1) 325 Steam 2009 Toshky (2) 325 Steam 2010 Dabbaa 600 Nuclear/Water desalination 2010 El Walidia (3) 325 Steam 2010 Attaka (1) 1,400 Pump storage 2010 TOTAL 6,625 Generation Expansion Plans 109 Table A3.8: Ethiopia Future Generation Expansion Year Project name and Installed Average Firm Total system energy (GWh) Total system capacity (MW) type capacity energy energy Avail- Required Surplus Avail- Required Surplus (MW) prod. prod. able able (GWh) GWh) 2000 Existing ICS 385 1,822 1,706 1,706 1,684 22 385 330.7 54.3 2001 Tis Abay II 73 331 2,037 1,885 152 458 330.3 127.7 2002 Fincaa 4th Unit 34 137 2,174 2,014 160 492 395.7 96.3 2003 Gilgel Gibe 184 642 2,816 2,157 659 676 453.6 222.4 2004 2,816 2,309 507 676 453.6 222.4 2005 2,816 2,464 352 676 484.0 192.0 2006 Tekeze Stg. I 225 735.75 3,551.75 2,616 935.75 901 514.0 387.0 2007 3,551.75 2,771 780.75 901 544.4 356.6 2008 3,551.75 2,929 622.75 901 575.4 325.6 2009 3,551.75 3,090 461.75 901 607.0 294.0 2010 3,551.75 3,253 298.75 901 639.0 262.0 2011 Gojeb Stg. I 100 242.70 3,794.45 3,420 374.45 1,001 672.0 329.0 2012 3,794.45 3,597 197.45 1,001 706.6 294.4 2013 Tekeze Stg. II 75 245.25 4,039.7 3,780 259.7 1,076 742.7 333.3 2014 Gojeb Stg. II 50 121.3 4,161 3,972 189 1,126 780.2 345.8 2015 Halele 382 4,543 4,171 372 1,126 819.3 306.7 2016 4,543 4,377 166 1,126 859.9 266.1 2017 Aleltu East Stg. I 780 5,323 4,594 729 1,126 902.4 223.6 2018 5,323 4,821 502 1,126 947.1 178.9 2019 5,323 5,061 262 1,126 994.2 131.8 2020 Geothermal 275.5 5,598.5 5,313 285.5 1,126 1,043.7 82.3 110 Appendix 3 Table A3.9: Kenya Future Generation Expansion (Interconnected System) Fiscal Project name Installed Average Firm Total system Total system capacity year and type capacity energy energy energy (GWh) (MW) (MW) prod. prod. Required Surplus Required Surplus (GWh) (GWh) 2000 Gitaru 3 (hydro) 80 5,021 1,032 167 Kipevu I (diesel) 75 2001 Olkaria III 8 5,312 1,224 312 (geothermal) 75 Kipevu II 110 (diesel) Fast Track 2002 Kipevu -45.5 5,627 1,408 445 Steam 64 Olkaria II (geothermal) 2003 Olkaria III 56 5,965 1,455 436 (geothermal) 60 Sondu -13.5 (hydro) Nairobi GT 2004 6,344 1,445 371 2005 Diesel 40 6,742 1,495 342 2006 Geothermal 64 1,559 333 2007 Geothermal 64 1,623 319 2008 Diesel 20 1,733 347 Ewaso Ng'iro I 90 (hydro) 2009 Ewaso Ng'iro II 90 550 330 1,8231 349 (hydro) 2010 Olkaria I -45 9,124 1,858 292 Diesel 80 2011 Geothermal 64 1,942 278 Diesel 20 2012 Diesel 120 1,062 293 2013 Geothermal 64 2,165 289 Diesel 40 2014 Diesel 120 2,286 292 2015 Geothermal 64 12,286 2,309 293 Diesel 60 2016 Diesel 150 2,559 313 2017 Geothermal 64 2,704 320 Diesel 80 Generation Expansion Plans 111 Table A3.10: Rwanda Future Generation Expansion Year Project Installed Average Firm* Total system energy Total system capacity name/type capacity energy prod. energy (GWh) (MW) (MW) (GWh) prod. Required Surplus Required Surplus (GWh) 2001 * Ruzizi II 14.7 55 126,278 185.6 -59,322 41 -11 2003 Methane Power 16.0 112 208.5 +29,778 57 -11 Station 2005 Nyabarongo 27.5 144 270,278 234.31 +147,968 67 +6.5 112 Appendix 3 Table A3.11: Sudan Generation Expansion, NEC Development Plan, 1999­2005 Option 1: Combined Cycle and Steam Years Load Retirement Additions Sys. inst. LOLP Annual Load Shed forecast (start of (start of cap. MW (days per ENS % GWh MW GWh year) year) year) 1999 636 588.40 192.786 13.228 261.1 2000 682 26 MW Kh. 614.40 204.984 13.901 305.5 Refinery 2001 732 2 x 30 MW 674.40 186.3 11.296 270.8 GT 2002 786 2 x 80 MW 834.40 88.098 3.477 71.9 GT 2003 844 2 x 30 MW 3 x 30 MW 924.40 69.019 2.033 47.7 GT CC 1 x 60 MW Steam 2004 908 2 x 80 MW 3 x 80 MW 1,094.40 1.288 0.028 3.8 GT CC 1 x 90 MW Steam 2005 976 Burri 1 x 90 MW 1,160.40 4.822 0.124 4.9 Diesel (3 x Steam 8 MW) 2006 1,051 1,160.40 10.195 0.246 10 2007 1,132 4 x 65 MW 1,420.40 0.031 0.001 0.4 (Merowe Hydro) 2008 1,219 1,420.40 0.94 0.002 1.1 2009 1,315 3 x 65 MW 1,615.40 0.008 0 0.3 (Merowe Hydro) 2010 1,418 1,615.40 0.035 0 0.3 2011 1,531 3 x 125 2,410.40 0.818 0.015 2 MW 7 x60 (Upgrading of first seven units) Merowe Hydro 2012 1,653 2,410.40 2.308 0.054 9.5 2013 1,786 Burri 2,358.40 3.622 0.09 35.5 Diesel (2 x 8 MW) Kh.N.G.T. (2 x 18 MW) Generation Expansion Plans 113 Table A3.12: Tanzania Future Generation Expansion Year Project Installed Average Firm Total system energy Total system capacity name/type capacity energy energy (GWh) (GWh) (MW) prod. prod. Required Surplus Required Surplus (GWh) (GWh) 2000 Lower Kihansi 180 922 808 3042.4 792.1 524.8 234.5 2001 UGT 5 40 282.9 IPTL 100 8.2 - 3498.3 1717.6 616.4 2002 CT 120 120 696 - 3982.5 1465.4 712.8 226.5 2003 CT 60 60 348 - 4291.2 1504.7 764.2 235.1 2004 Zambia import 200 1051.2 - 4583.8 2372.1 813.2 386.1 2005 CC 200 1160.0 - 4850.7 3265.2 858.1 541.2 2006 5128.5 2987.4 904.9 294.4 2007 5419.4 2696.5 953.5 245.8 2008 5722.7 2393.2 1004.1 195.2 2009 GT 60 348.0 6043.1 2420.8 1100.0 159.3 2010 Ruhudji 358 2000.0 1662 6375.5 4164.8 1162.0 455.3 2011 6756.1 3784.2 1219.0 398.3 2012 7127.7 3412.6 1280.0 337.3 2013 7519.7 3020.6 1344.0 273.3 2014 Rumakali 222 1320 1242 7933.3 3894.6 1411.0 428.3 2015 8235.7 3592.2 1490.0 349.3 2016 8647.5 3180.4 1564.0 275.3 1017 9075.9 2748.0 1642.0 197.3 2018 CC 180 1044 9533.9 3338.0 1724.0 295.3 2019 10,010.5 2861.4 1811.0 208.3 2020 GT 60 348 10,511.1 2708.8 1908.0 171.3 114 Appendix 3 Table A3.13: Uganda Future Generation Expansion Year Project Installed Average Firm Total system energy Total system capacity name/type capacity energy energy (GWh) (MW) (MW) prod. prod. Required Surplus Required Surplus (GWh) (GWh) 2000 Owen Falls 80 2379 390 -115 Extension M11&12 2001 Owen Falls 120 (for 11- 2580 -330 425 -30 Extension 15) = 750 M13-15 2002 2736 -486 450 -55| 2003 2885 -635 470 -75 2004 Bujagali H.P 250 1,600 3073 787 505 140 2005 Karuma H.P. 200 1,200 3191 1859 525 320 2006 2007 2008 Kalagala 270 1,650 H.P. 2009 2010 4414 2286 730 345 2015 5467 1233 900 175 2020 7049 -349 1153 -78