62625 Opportunities in DAM PLANNING and MANAGEMENT A Communication Practitioner’s Handbook for Large Water Infrastructure Leonardo Mazzei Lawrence J. M. Haas Donal T. O’Leary OPPORTUNITIES IN DAM PLANNING AND MANAGEMENT OPPORTUNITIES IN DAM PLANNING AND MANAGEMENT A COMMUNICATION PRACTITIONER’S HANDBOOK FOR LARGE WATER INFRASTRUCTURE LEONARDO MAZZEI LAWRENCE J. M. HAAS DONAL T. O’LEARY . . © 2011 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org All rights reserved 1 2 3 4 :: 14 13 12 11 This volume is a product of the staff of the International Bank for Reconstruction and Development / The World Bank. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgement on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2422; e-mail: pubrights@worldbank.org. ISBN: 978-0-8213-8216-5 eISBN: 978-0-8213-8279-0 DOI: 10.1596/978-0-8213-8216-5 Cover photo: Leonardo Mazzei Library of Congress Cataloging-in-Publication Data Mazzei, Leonardo, 1973- Opportunities in dam planning and management: an infrastructure practitioner’s handbook / prepared by Leonardo Mazzei with Lawrence Haas and Donal T. O’Leary. p. cm. Includes bibliographical references and index. ISBN 978-0-8213-8216-5 (alk. paper)—ISBN 978-0-8213-8279-0 (electronic : alk. paper) 1. Dams—Design and construction. 2. Infrastructure (Economics)—Decision making. 3. Project management. I. Haas, Lawrence J. M. II. O’Leary, Donal. III. Title. TC540.M463 2010 363.6’1—dc22 2010032690 Contents Preface ix About the Authors xiii Abbreviations xv Introduction 1 1 Advocacy and Awareness Raising 11 Bridging the Communication and Infrastructure Paradigms 12 Adopting a New Generation of Tools 15 Capturing Synergy from Governance, Sustainability, and Communication 29 Adding Value for Relevant Groups of Stakeholders 31 Reinforcing the Advocacy Roles of World Bank Task Teams 32 2 How to Adopt Good Practice 39 Starting with a Communication-Based Assessment 40 Applying Criteria to Benchmarking for Good Practice 42 Formulating Comprehensive Communication Strategies 52 Improving Communication along the Project Cycle 57 Investing in Communication for Governance and Sustainability 70 3 Tools and Resources: Some Thumbnail Sketches 77 Communication Tools 78 Anticorruption Tools 89 Sustainability Tools 98 v vi Contents Appendixes A Berg Water Project 121 B Lesotho Highlands Water Project 133 Glossary 141 Boxes 1.1 Featuring Communications and Governance in the Hydro Sustainability Assessment Protocol (HSAP) 21 2.1 What Is the Traditional Communication-Based Assessment (CBA)? 40 2.2 The Multiple Expectations Associated with Dam Projects 47 2.3 Using Rules and Dialogue in the Project Governance Structure to Empower Relevant Voices 48 2.4 Using Communication to Create Stakeholder Value at All Project Stages 50 2.5 Tools for All Forms of Risk Reduction 51 2.6 Communication Strategy: Three Streams for the BWP Implementation Phase 55 3.1 Social and Participatory Communication Analysis: Issues to Be Covered by the CBA 81 3.2 IWRM Management Tool Classification 101 A.1 Berg Water Project: Its Genesis 122 A.2 Linking Options Assessment to Communications, Governance, and Sustainability 125 B.1 Lesotho Highlands Water Project (Phase I): Project Features 134 Figures 1 How to Get the Most from This Handbook: Entry Points 9 1.1 Stakeholders in the Public Sector Governance System for Infrastructure 17 1.2 Old and New Sustainability Themes in Dam Planning and Management 20 1.3 Four Areas of Communication Practice Relevant to Contemporary Dam Planning and Management 25 1.4 The Four-Phase Development Communication Process: Activities and Outputs 26 1.5 Analytical Support for Communication Needed through All Project Cycle Stages 26 1.6 Multiple Aspects of Governance Reform and Its Impact on the Policy and Planning Context of Dam Projects 30 1.7 Synergy Starts by Linking Communication-Based Assessment with Other Strategic and Technical Assessments 31 Contents vii 1.8 Community and Planners’ Perceptions of Current Community Roles and Preferred Community Influence in Water Management Decisions 33 2.1 Benchmarking Communication Strategies within the Four-Phase Development Communication Process 45 2.2 Plans and Subplans of Dam Projects That Need a Communication Strategy 53 2.3 World Bank Project Cycle for Investment Lending 58 2.4 Communication and the Infrastructure Project Cycle for Dam Projects 59 2.5 Mapping of Development Communication Interventions and Products along the Bank Project Cycle 60 2.6 Mapping of Governance and Anticorruption (GAC) Interventions and Products along the Bank Project Cycle 61 2.7 Mapping of Sustainability Interventions and Products along the Bank Project Cycle 63 2.8 Workspace in the Macro and Project Identification Stages 64 2.9 Workspace in the Project Preparation Stage 66 2.10 Workspace in the Project Implementation Stage 67 2.11 Workspace in the Project Evaluation Stage 68 2.12 Governance, Sustainability, and Communication Interventions at All Stages of the Bank Project Cycle 69 2.13 Profile of Communication Activity on Bank-supported Projects in 2007 72 3.1 Components of a Communication Action Plan for Dam Projects 84 3.2 New and Old Sustainability Themes in Dam Planning and Management 99 3.3 Communication and Social Accountability Tools Applied to Budget Questions 103 3.4 Environmental Flow Assessments in Integrated Water Resource Management 106 3.5 Performance at Commissioning 109 A.1 Berg River Dam and Supplement Scheme Near Franschoek, South Africa 124 Tables 1.1 Corruption Exposures in Hydropower along the Infrastructure Project Cycle 16 1.2 What Is the Difference between Thinking and Practice? Preventing and Detecting Corruption in Dam Planning and Management 19 viii Contents 1.3 What Is the Difference between Thinking and Practice? Enhancing the Sustainability of Dam Projects and Balancing the Economic, Social, and Environmental Performances in Context 24 1.4 How Each Communication Practice Helps to Advance Governance and Sustainability Improvements in Dams 27 1.5 What Is the Difference between Thinking and Practice? Modernizing Communication Practices in Dam Planning and Management 28 1.6 Added Value of Communication: Project Management and Stakeholder Perspectives 32 1.7 Why Fighting Corruption in Hydropower Is in the Interest of All Stakeholders 34 2.1 A Communication-Based Assessment: A Quick Checklist 41 2.2 Some Dos and Don’ts in Starting a Communication-Based Assessment (CBA) 43 2.3 Some Dos and Don’ts on Benchmarking Good Practice Communication on Dam Projects 52 2.4 Some Dos and Don’ts in Formulating a Comprehensive Communication Strategy 56 2.5 Some Dos and Don’ts in Improving Communication along the Bank Project Cycle to Support Improving Governance and Sustainability in Dam Projects 70 2.6 Relative Impact of Communication Improvements on Project Budgets 71 2.7 Communication Budget, Project Preparation, and Implementation Stages, Bumbuna Hydropower Project, Postwar Sierra Leone 73 2.8 Representative Cost of Corruption Risk Assessment (CRA) and Governance Improvement Plan (GIP) for a Water Supply Dam 73 2.9 Representative Cost of Multistakeholder Workshop for Three-Way Synergy from Governance, Sustainability, and Communication 73 3.1 Steps in the Design of a Communication Strategy 83 3.2 Mapping of Development Communication Tools along the Project Cycle 88 3.3 Mapping of Anticorruption Tools along the Project Cycle 97 3.4 Mapping of Sustainability Tools along the Project Cycle 118 Preface The past few decades have seen major advancements in the delivery of environ- mentally responsible and socially acceptable infrastructure in different gover- nance settings. However, the yardsticks needed to measure progress and define good practice continue to be redefined. The emergence and wider acceptance of dialogue and partnership approaches that incorporate multiple stakeholders are trends that characterize beneficial changes in dam planning and management. Several motivations are driving these trends. The first is to involve interested and affected people as partners in development decisions, thereby realizing the many benefits that inclusive approaches are acknowl- edged to bring. A second motivation is to inform and legitimize what are ultimately political decisions on proceeding with major dam developments, balancing the eco- nomic, social, and environmental performance aspects with the implementation and operations phases of dams. Project experience recognizes that this balance evolves over time, is contextually defined, and can be adjusted through stakeholder processes. This dimension of development practice requires integrating communication strat- egy within the entire project process. Mechanisms for dialogue are needed to bring government, civil society, and private sector actors together to advocate and deliver the various governance reforms and anticorruption measures that influence the overall development performance of dams, especially to ensure that the benefits and costs of dam developments are equitably distributed in societies—and perceived to be so. Several multifaceted concerns also drive the need to embed modern commu- nication thinking in dam planning and management more generally. At the center is the concept that large dam developments should be approached holistically, as wider development interventions, rather than narrowly, as physical assets deliver- ing water and energy services. The local communities that host dam projects and the river users who rely on natural resource systems hold this view strongly. Their attitudes are revealed powerfully when interested and affected parties engage in two-way communications at each stage of the infrastructure project cycle. For a communication practitioner, developing communication practices in dam planning and management means informing the project design, especially the social and environmental dimensions of sustainable performance as it is defined and ix x Preface perceived by stakeholders. It also means having a clear picture of the political and cultural dynamics and other behaviors that hinder or advance the formation of vital partnerships and of how to nurture them and to ensure power relations are balanced. Implementation of this full interpretation of the development of com- munication practices requires analytical tools to understand the values, fears, and expectations that lay beneath the varied, and too often highly polarized, percep- tions of risk, which, when left unattended, form the fault lines of conflict. On a practical level, the development of communication practices means ade- quately investing in communication at all project stages aimed at building func- tional stakeholder partnerships, working with the media, and ultimately spending less on crisis management. It also means understanding the political economy of dam decisions, as well as the steps needed to create trust, good faith, and the space within which sustainable, pro-poor, pro-environment solutions can be incor- porated. Equally, it means advocating the relevant good development practices promoted by the World Bank and undertaking advocacy outreach to all stakehold- ers, from government policy makers to families affected by dam projects. This handbook responds to the call by the World Bank’s Development Com- mittee for infrastructure and communication practitioners to collaborate on more comprehensive communication strategies for all stages of the Bank project cycle widely endorsed by international stakeholders. It is timely for several reasons: • Large dams and hydropower are climbing back to the top of the global devel- opment agenda because of the growing appreciation of the manifest linkages among water, environment, energy security, and climate change. In response, the World Bank is scaling up its own portfolio of dam projects, including initiating new projects and rehabilitating and reopening the operations of existing dams. • The operational or development communication practice offers a range of new tools and techniques suited to today’s challenges and complexity in dam plan- ning and management. • The democratization of development processes increases the pressure for inclusive decision-making processes and the full translation of policy reforms into dam projects. • The growing recognition of corruption is acting as a safeguard against the mani- fest effects of corruption on the provision of infrastructure. New anticorruption tools are available but underutilized. At the same time, communication is needed to underpin a shift to more comprehensive approaches to risk management. Structures that promote more dialogue respond to these new challenges and equip project task teams with the tools they need to better manage stakeholder expectations and to explore solutions through partnerships. This handbook is one of three products prepared under an initiative supported by the Bank–Netherlands Water Partnership Program (BNWPP). This volume, Opportu- nities in Dam Planning and Management: A Communications Handbook for Large Water Infrastructure, offers task managers and infrastructure practitioners the basic information they need to benchmark value-added improvements in communication within the World Bank’s own portfolio of dam projects. The other two products are Preface xi two World Bank working papers: Berg Water Project: Communications Practices for Governance and Sustainability Improvement and Lesotho Highlands Water Proj- ect: Communications Practices for Governance and Sustainability Improvement.1 These papers provide an in-depth assessment of two dam projects in Africa, looking at governance, sustainability, and communication to draw lessons. Synopses of the two case studies appear in appendixes A and B of this handbook. This handbook is aimed primarily at two groups of practitioners: (1) those already conversant with governance and anticorruption concepts and communications sup- port in World Bank operations, and (2) developing country planning process or dam project managers—that is, practitioners less familiar with the language or concepts associated with these topics who work on World Bank–supported dam projects or on dam planning and management concerns in different country settings. For communication specialists, the handbook contributes to the dialogue on ways to modernize communication in dam planning and management. Some of the concepts and illustrations of good practice cited in the handbook are also relevant to other aspects of infrastructure, such as communication support to advance gov- ernance and anticorruption (GAC) efforts along the infrastructure project cycle. Objectives of the Handbook This handbook seeks to advance efforts to evolve and benchmark value-added improvements in communication practices in dam planning and management. Another objective is to improve awareness of the opportunities to exploit synergy in linking improvements in governance, sustainability, and communication. Finally, it offers guidance on how to ensure that communication strategies cover all stages of the World Bank project cycle and the infrastructure project cycle. In addition, this handbook is directed at reinforcing the following outcomes: • Improving the quality of dam projects in the World Bank’s own portfolio by enabling and facilitating functional partnerships that better reflect stakehold- ers’ concerns about risk, empowerment, and opportunity • Inspiring action to embed governance and anticorruption measures in dam projects through raising awareness of the key corruption vulnerabilities at all stages of the infrastructure cycle • Drawing attention to the long-term capacity building of modern communica- tion practices to promote a culture of communication in dam planning and management. Origins of the Handbook This handbook emerged from a discussion paper supported by the Development Communication Division (DevComm) of the World Bank that explored the notion of standards for communication in infrastructure development. Presented at the World Congress on Communication for Development in Rome in 2006, the paper received a positive reaction, and it then became World Bank Working Paper 121 (2007) in order to disseminate the concepts and information more widely. xii Preface That working paper outlines a systematic approach to developing voluntary standards for communication on infrastructure projects—standards linked to gov- ernance and sustainability themes. It recommends five follow-up initiatives relevant to dams. DevComm and the BNWPP collaborated on the first initiative, which is a direct response to the call by the World Bank Development Committee for infra- structure and communication practitioners to collaborate on improving communi- cation strategies in all phases of the project cycle, focusing on dam planning and management themes. This handbook grew out of that response. Acknowledgments This handbook and its companion case studies in the World Bank working paper series benefited from the experience and advice of many people. Special thanks are extended to stakeholders on the Berg Water Project in the Western Cape Region of South Africa and the multiphase Lesotho Highlands Water Project in the Kingdom of Lesotho. And, in particular, we are grateful to the specialists from government, civil society, and the private sector who gave their valuable time to review drafts of the case studies and who offered their creative input. They are Liane Greeff, Jessica Hughes, Paul Roberts, and Charles Sellick, as well as the many representatives of the Department of Water Affairs and Forestry (DWAF), Trans-Caledon Tunnel Authority (TCTA), City of Cape Town, and Ninham Shand Inc. Thanks are extended as well to Leon Trump of the Lesotho Highlands Water Commission; Masilo Phakoe and Motu- latsi Nkhasi at the Lesotho Highlands Development Authority; Johann Claassens and David Keyser at TCTA; DWAF staff, particularly Wille Croucamp and Reggie Tsekas- eka; and Marcus Wishart, Rafik Hirji, and the late Dan Aronson of the World Bank. Many development practitioners at the World Bank commented on the initial drafts of the handbook and offered creative input and support, including (in no particular order) Daryl Fields, Alessandro Palmieri, Sumir Lal, Adesinaola Michael Odugbemi, and Paul D. Mitchell. Special thanks are extended to the copyeditor, Sabra Bissette Ledent, and to Mark Ingebretsen, Stuart Tucker, and Santiago Pombo of the World Bank’s Office of the Publisher for their outstanding editorial and publishing support. Finally, we would like to acknowledge the assistance and funding provided by the Bank–Netherlands Water Partnership Program for the preparation of this hand- book, and we would like to express our thanks to the colleagues within the World Bank who facilitated the approval and funding, especially Daryl Fields, Alessandro Palmieri, Xiaokai Li, and Diego Juan Rodriguez. Note 1. Lawrence J.M. Haas, Leonardo Mazzei, Donal T. O’Leary, and Nigel Rossouw, Berg Water Project: Communications Practices for Governance and Sustainability Improvement, World Bank Working Paper No. 199 (Washington, DC: World Bank, 2010); Lawrence J.M. Haas, Leonardo Mazzei, and Donal T. O’Leary, Lesotho Highlands Water Project: Com- munications Practices for Governance and Sustainability Improvement, World Bank Working Paper No. 200 (Washington, DC: World Bank, 2010). About the Authors Leonardo Mazzei is an international expert in strategic communication who assists governments on difficult reform programs and high-risk projects. As a senior communication officer in the Development Communications Division of the World Bank, he worked in Africa, Central and East Asia, Eastern Europe, and Central America with a focus on governance, infrastructure, and private public partnerships. He has extensive experience in political risk analysis, public consul- tations processes, conflict resolution, and opinion research. Currently, he leads communications for the Structured and Corporate Finance Department of the Inter-American Development Bank, supporting private sector investments in Latin America and the Caribbean. For nearly 30 years, Lawrence J. M. Haas led multidisciplinary teams working with water and energy utilities and commissions in Africa and Asia to implement projects and capacity building. He was a team leader in the secretariat of the World Commis- sion on Dams. Currently, he is an independent consultant in dams and sustainable development issues in the water and energy sectors for organizations such as the World Bank, World Wide Fund for Nature, International Union for Conservation of Nature, Asian Development Bank, and the Mekong River Commission Secretariat. Donal T. O’Leary is the lead water adviser at Transparency International (TI) and is a cofounder of the Water Integrity Network. He was one of the principal authors of The Global Corruption Report 2008: Corruption in the Water Sector (Cam- bridge University Press) and represented TI on the Hydro Sustainability Assess- ment Forum, a multistakeholder platform that produced the Hydro Sustainability Assessment Protocol, published in November 2010. From 1982 to 2005 he was a senior power engineer with the World Bank, working primarily with the Energy and Water Groups for the South Asia and Africa Regions. He worked with Siemens AG under the World Bank Staff Exchange Program and represented Siemens in the Industry Group associated with the World Commission on Dams. xiii Abbreviations BNWPP Bank–Netherlands Water Partnership Program BWP Berg Water Project CAS country assistance strategy CBA communication-based assessment CNA communication needs assessment CRA corruption risk assessment DC Development Committee (World Bank) DevComm Development Communication Division (World Bank) EFA environmental flow assessment EIA environmental impact assessment EMC environmental monitoring committee EMP environmental management plan Eskom Electricity Supply Commission (South Africa) GAC Governance and Anticorruption Strategy (World Bank Group) GIP governance improvement plan GIS governance improvement strategy G-S-C governance-sustainability-communication linkage IFR instream flow requirements IHA International Hydropower Association IP integrity pact ISA integrated sustainability assessment IWRM integrated water resource management LHWP Lesotho Highlands Water Project PM project manager PM&E participatory monitoring and evaluation PPP public participation process PRSP poverty reduction strategy paper xv xvi Abbreviations SEA strategic environmental assessment TI Transparency International TTL task team leader (World Bank) WCD World Commission on Dams WWF World Wide Fund for Nature (WWF International) Introduction Communication for development is a comparatively new field that offers new tools and techniques to support inclusive and informed decisions in the plan- ning and management of large water and energy infrastructure projects, includ- ing dams. Rethinking the approach to communication on dam projects is also timely in today’s policy context. A window of opportunity has opened to tie in governance reform (including fighting corruption), poverty reduction, and communication with today’s challenges in sustainable infrastructure develop- ment. Progress on any one of these aspects requires effective communication with stakeholders and interests. Presently, there are no standards for communication in the infrastructure proj- ect cycle, including that of dam projects. The World Bank’s Development Com- mittee recognized the significance of this gap in 2006 when it called for improving governance on infrastructure, specifically by developing communication strategies for all phases of the project cycle.1 International civil society, industry, and donors endorsed the recommendation set out in the discussion paper “Strengthening Bank Group Engagement on Governance and Anticorruption,” which was pre- sented at the 2006 meeting of the Development Committee.2 From an operational perspective, communication can advance efforts to mainstream sustainability in hydropower development. Similarly, communi- cation can advance efforts to place dam planning and management in an integrated water resource management context and reach a consensus on anticorruption measures.3 Moving forward requires clarity on practical, effective ways to build a communication capacity within both project teams and implementing agencies and on the tools needed by donors, international 1 2 Opportunities in Dam Planning and Management nongovernmental organizations (INGOs), and others to help borrowers advance these aims at the sector and project levels.4 This handbook aims to help foster a “communication culture” that will accommodate the wide range of stakeholder interests in dam planning and management in ways appropriate to the development context of today and the need to promote solutions to sustainability challenges. It seeks to create aware- ness among practitioners of the benefits and costs of improving the role of communication in infrastructure development. It also demonstrates how communication helps to improve governments’ capacities to address corrup- tion issues in infrastructure. Finally, this handbook is aimed at building the capacity of project teams and government officials to effectively adopt and adapt modern communication principles and tools to cover all stages of the dam project cycle. The Challenge The provision of water infrastructure intersects with many different aspects of governance reform and democratization of development processes. In turn, these aspects bring many new issues, complexities, expectations, and voices to the table, which task managers must accommodate. Fundamentally, more communication capacity is needed to engage a wider range of stakeholders to support the kind of functional partnerships required to deliver sustainable solutions, integrate governance reforms, and cope with growing complexity. Improving project risk management is central. Indeed, today risk is defined more comprehensively than in the past, encompassing risks to stakeholder expectations and values associated with a failure to deliver sustainable perfor- mance, as well as the risk of corruption and the reputational risk of all partners. The integration of better communication in dam projects will foster a phi- losophy of good governance and sustainable solutions that is consistent with the World Bank’s Governance and Anticorruption Strategy and its leadership role. Corruption has manifest and disproportionate impacts on the costs and quality of service delivery to the poor, and otherwise undermines the infrastructure strategies of societies. Transparency and communication underpin most of the tools used to fight corruption. These tools include up-front awareness raising to overcome barriers to action and measures to prevent and detect corruption in collaborative approaches. Sustainability goes beyond the traditional notion of optimizing the design and performance of dams as physical assets for water and energy service provision. Today, it also encompasses the notion of optimizing the development performance of dams. Sustainable outcomes are delivered by innovative solutions that balance the economic, social, and environmental per- formances of dams within a context that can be understood and shared by stake- holders. Communication captures and fuses these elements, informs judgments, and links multiple actors to deliver sustainable performance. Introduction 3 The notion that communication plays a key role in introducing governance reforms and sustainable infrastructure provision is not new. What is new is linking these mutually reinforcing elements in dam planning and manage- ment as an explicit strategy. This new strategy makes conceptual and practical sense; it helps to manage risks and expectations systematically. Conceptually, the opportunity for three-way synergy among communica- tion, governance, and sustainability stems from typical situations in which, for example, reforms, whether for anticorruption or water governance, are set within a participatory framework, requiring more open and inclusive decision processes, or governance and sustainability connect in many issues and interests. These situations involve the same interested and affected parties. They inform decisions on competing interests, or they cooperate on shared interests. Synergy is achieved when the issues are tackled holistically, thereby gaining more for less. Communication supports anticorruption efforts, which in turn support sus- tainability by mitigating the risks to the social and environmental performance of dam projects and large water infrastructure more broadly. Experience from the Field For the people on the ground, many of these issues are inseparable. For exam- ple, when dam project authorities meet with host communities or river users to talk about one set of issues such as the environment management plan (EMP), those attending will generally raise all of the issues that concern them. Controversial issues are not easily dealt with in isolation—confidence and trust are built by resolving issues that affect the whole relationship. This handbook builds on two case studies in order to identify current prac- tice and to draw insights and lessons from the field: the Berg Water Project in South Africa (described in appendix A) and the Lesotho Highlands Water Project in Lesotho (described in appendix B). The Berg Water Project is a clear illustration of the synergy among issues that is important to stakeholder and project management. In that project, the multistakeholder environmental monitoring committee (EMC) became the main platform for dialogue on how to resolve the social sustainability concerns of the project, including the equi- table sharing of benefits with the host community. In response to these con- cerns, the EMC set up working groups to deal with aspects of project gover- nance and sustainability. EMC members also agreed on a comprehensive communication protocol. This protocol guided member interaction, commu- nication with respective constituencies, and engagement of the media. Where to Start This handbook offers five “how-to” communication-based steps for improv- ing governance and sustainability in dam planning and management. These 4 Opportunities in Dam Planning and Management steps are intended to increase transparency and accountability in the coopera- tion among government, civil society, and the private sector in structured pro- cesses; integrate sustainability approaches and thinking; and induce recognition that different aspects (environmental, social, financial, and institutional) of sustainability are intertwined. The five how-to steps can be summarized as follows: 1. Start with a communication-based assessment (CBA). The communication- based assessment is the first opportunity to identify how communication can improve project design as well as governance and sustainable perfor- mance. In fact, this assessment is the first step in the World Bank’s four- phase development communication methodology, described in chapter 2. The CBA, which can vary in depth and duration based on needs, helps to identify knowledge gaps, stakeholders’ present perceptions, communica- tion systems, problems and risks, and possible solutions. 2. Benchmark against good practice. Benchmarking plays an important role in the preparation of a communication strategy. Generic benchmark- ing steps include the following: • Measure and then manage stakeholder expectations. Managing expec- tations requires understanding what all stakeholders expect of the proj- ect and what they fear to lose, and then managing the risks people perceive as important. Communication-based assessment tools are available to task managers seeking to detect and avoid the controversies fueled when the expectations of one or more stakeholder interests is not recognized from the start, or is not accommodated in the project design, or is simply not viewed as “important” in the scheme of things as the project proceeds. The assessment equips project managers with “radar” to identify potential problems early and manage them better. • Empower the relevant voices. Success in enhancing governance and sustainability hinges on effective coalitions of government, private sec- tor, and civil society actors. Using two-way communications to give people a voice in development decisions that affect them improves the development performance of dam projects and allows people to partici- pate in a meaningful way in multistakeholder partnerships. Empower- ing the relevant voices also helps project teams to manage and resolve the trade-offs on different aspects of sustainable performance. Decision- making authorities at all levels are better informed in negotiating trade- offs when all voices are empowered. • Build trust for functional partnerships. Establishing a policy of clear two-way communications from the start is essential to creating, building, and maintaining trust—not only stakeholders’ trust in authorities to act in “good faith” but also their trust in the mechanisms that will reconcile their interests. Trust is achieved through transparency, commitment to participation, culturally appropriate communication and feedback, and Introduction 5 written commitments that can be verified and upheld. Trust is key to cre- ating the space for agreement on sharing costs and benefits (within the policy framework and regulation) and on pursuing the adaptive manage- ment of dams. Trust between riparian states is of central importance to mutually beneficial cooperation on international rivers. • Add value for different groups of stakeholders. Attention to value added is critical for host communities and affected river users, who typically live in remote rural areas. Value in this context is what these communities and users perceive to be and define as value—and it is in addition to the value added for the primary beneficiaries of water and energy services, who typically reside in towns and urban centers. Com- munication must underpin inclusive decision making on dam design, delivery, and performance to ensure that these factors add value for stakeholders. Benefits must be shared equitably and perceived as such. • Advocate forms of risk reduction. Communication must support the identification and management of all forms of risk, with risk defined in an encompassing way, not narrowly. Communication can support a more holistic and integrated approach to risk assessment and management. In practice, it means ensuring that the risk exposures important to relevant stakeholder constituencies are identified, properly assessed, and reason- ably addressed from the outset of a project. Paying attention to all forms of risks includes heeding all dimensions of sustainable performance. In addition, risk at the local level includes taking into account environmen- tal risks and focusing not just on the voluntary risk takers, such as con- tractors, owners, and financing agencies, but also on communities. 3. Formulate comprehensive communication strategies. Each major proj- ect activity and partnership group would have a detailed communication strategy. Typically, a communication strategy for large water infrastructure would include four distinct dimensions: (1) development communica- tion, which focuses on the design and supervision of public communica- tion programs and identifies risks; (2) corporate communication, mostly for external audiences, which explains how the corporation reflects gov- ernment policy and how it will implement reforms on the dam project in which it is involved; (3) advocacy, which defines messages to raise the profile of an issue and influence change; and (4) internal communica- tion, an essential part of internal governance, which helps to enhance syn- ergy and achieve internal consensus on goals and messages before going “outside.” These dimensions will support public participation processes to inform choices on dam and non-dam options, communication with the people affected by a project to ensure that their concerns are reflected in project design, internal communication among institutional partners on implementation arrangements and coherence, coordination with sector entities to optimize the benefits of multipurpose dams, engagement with 6 Opportunities in Dam Planning and Management end-user groups to locate key decisions about dams in the basin devel- opment context, and advocacy by government and water institutions to build support for the project. 4. Improve and adapt communication along the project cycle. Adoption of a greater emphasis on analysis to monitor stages dynamically shifts classical thinking on the analytical role of communication—or rather places more emphasis on analysis in monitoring stages dynamically linked to consulta- tion and public participation processes. Communication strategies must be adapted for each stage of the infrastructure project cycle: planning, prepara- tion, implementation, operation, and evaluation. For most projects, com- munication strategies must be updated to take into account (1) the changes in issues and risks between project stages, (2) the changes in the roles of the stakeholders, and (3) the typically long period of time between stages. In other words, the communication strategy must inform and support key decisions at each stage of the project cycle as actors, risks, and issues change. 5. Invest in communication for governance and sustainability. Improve- ments in communication must deliver value for the money and value for all stakeholders. Stakeholder value is achieved by investing in effective partnerships that also facilitate public acceptance, while reducing conflict that would otherwise increase project costs. Implementation along the Project Cycle At the macro policy stage, communication should support legislative and macro policy reforms by creating the strong culture of communication needed to promote water governance reforms from the top. At this level, communica- tion strategies are aimed at building support for reforms, facilitating the kinds of fundamental behavioral shifts needed for water reforms that go to the heart of attitudes about water, and helping to manage the tension between local interests and national imperatives or national policy achievements. That ethos must be incorporated into how the public and private enterprises responsible for implementing reforms and infrastructure provision actually behave, and how corporate communication strategies reflect these behavioral changes. The relevant stakeholders include legislators, politicians, and representatives of the government, civil society, media, and private sector interested in the political economy of water and development. At the strategic planning stage—that is, the sector- and basin-level strategic planning processes that lead to the identification of programs and projects— communication should reinforce the political legitimacy of decisions. It does so by explaining the rationale for strategic studies and comprehensive options assessments in order to reinforce the political legitimacy of decisions reached, while also clearly describing the convergent and divergent views and how trade-offs were reached. Similarly, communication should help clarify the Introduction 7 infrastructure strategy on which decisions for a particular project are based. It would explain how the strategy was derived from basin-level water resources planning, and especially how it affects the water services received by different consumer groups, highlighting the impacts of the expansion of services to low-income groups and the impacts of tariffs. Communication strategies for public participation processes must reveal the different entry points for public input and otherwise seek to maximize opportunity, voice, and participation. They must then ensure that the government responds to the results of public participation so that trust in the outcome and future participation is not jeop- ardized. The relevant stakeholders include representatives of the various inter- ested and affected parties and water institutions in the river basin. At the project preparation stage—that is, the project-level studies that con- firm the design of infrastructure projects up to approval and financing—those undertaking communication and social analysis need first to understand how different groups actually see the project—their attitudes, perceptions, anxi- eties, and expectations—and thereafter what each group of interested and affected parties requires in order to facilitate two-way communications. To establish trust and add value, communication efforts should facilitate the early meaningful involvement of interested and affected parties by detailing prog- ress, sharing information, involving stakeholders in knowledge management activities, and addressing issues relevant to the parties. The relevant stakehold- ers again include basin residents and communities receiving water and energy services from the project, but at this stage more emphasis is placed on the community hosting the project. At the project implementation stage—that is, after approval and through construction, implementation, and commissioning—communication should be directed at maintaining trust, sustaining dialogue, and expanding partner- ships, thereby demonstrating the importance of effective dialogue mecha- nisms. Communication should also be directed at increasing the transparency of key decisions on project preparation, design, and operating strategies by using open, participatory mechanisms and taking the preliminary steps needed to reduce the corruption risks in procurement contracts. Successful communication at this stage helps set the scene for a partnership in the oper- ating phase. The relevant stakeholders are the same as those involved in the previous stage, but now also include the suppliers of goods and services, con- tractors, and construction workers involved in the project. At the project operation stage, communication is related to the sustainable integration of the project within the culture and economy of the host com- munity. Similarly, communication revolves around integration of the opera- tion within the evolving catchment management strategy. Transparent and effective communication should empower a dialogue among the interested and affected parties about compliance monitoring processes and adaptive management of the facilities and of downstream releases from the reservoir 8 Opportunities in Dam Planning and Management within the framework of the regulations. Communication strategies also must address the need to build a communication capacity in new water institutions. The relevant stakeholders include the host community, basin communities, water institutions, and consumers, as well as regulatory oversight bodies. At the project evaluation stage, communication resources, processes, and outcomes would be assessed against objectives, critically considering the effec- tiveness of the communication strategy and the extent to which project com- munication added value to outcomes for the resources provided. Monitoring and evaluation should include a yearly report on the performance of project communication. Similarly, evaluators should try to capture convergent and divergent views, including the views of all stakeholders and project partners, and highlight successes and failures that could help improve communication on other projects. Where possible, they could use a multimedia approach to reflecting on the development process in the public sphere. The budgetary implications of introducing good communication practices in support of governance and sustainability improvements in dam projects depend on a project’s complexity. For example, spending on communication activities in the Lesotho Highlands Water Project (LHWP) described in appen- dix B increased from the early Phase IA and IB project preparation stages to the current Phase II. Communication was a very small component of the LHWP’s total budget in the 1990s and early 2000s, during the Phase IA and IB project preparation works, but by 2008 communication and public stake- holder consultation activities related to the Phase II feasibility studies were accounting for more than 35 percent of the total budget. The Nam Theun 2 project in Laos budgeted $250,0005 to contract out the CBA activities and col- laborative preparation of the communication strategy for the implementation phase. This amount did not include the supervision costs, and it was one ele- ment of the total project communication budget. The Bumbuna project in Sierra Leone budgeted $200,000 for the CBA, communication action plan development during project preparation, and two years of implementation. Organization of This Handbook: Multiple Entry Points This handbook consists of three chapters, each designed to enable practitio- ners to use any chapter independently, depending on their needs and interests. The first two chapters are in modular formats for clarity and ease of use. Chapter 1 explains why modernizing communication in dam planning and management is in everyone’s best interests and why linking governance, sus- tainability, and communication adds value for all stakeholders. Chapter 2 offers guidance for task managers who wish to adopt communi- cation practices that help to advance governance and sustainability themes in dam planning and management. The guidance is aimed at improving com- munication at different stages of the project cycle, as advocated by the World Bank’s Development Committee. Introduction 9 Chapter 3 is a primer on the communication, anticorruption, and sustain- ability tools and techniques that can be applied to dam planning and manage- ment by the infrastructure practitioners and task managers supervising the preparation and implementation of activities throughout the project cycle. A handbook adds value only to the extent that it stimulates thinking and offers relevant guidance. Figure 1 and the explanation that follows suggest six ways in which World Bank task team leaders (TTLs), country-based project managers (PMs), and other practitioners can get the most from this handbook and its companion products: • Benchmark to identify room for improvement. First and foremost, use this handbook to benchmark against criteria that reflect good practice (e.g., to identify gaps or missed opportunities) and to assess ways to add value in exploiting synergy among governance, sustainability, and communication. • Facilitate task team discussions. Use the handbook to stimulate the exchange of new ideas and thinking among members of task teams or their counterparts and to structure one-on-one discussions between communi- cation specialists and task team area specialists to serve as input for com- munication needs assessments and communication strategies. Figure 1. How to Get the Most from This Handbook: Entry Points Benchmarking for improvements in governance and communication practices Engaging in advocacy with Facilitating governments in project discussions within design via project task teams on counterparts with project design goal of embedding parameters reforms Getting the most from this handbook TTLs and PMs Facilitating project Helping to build partnerships with capacity through government, civil project-related society and private training and capacity sector to better building manage complexity Fostering innovation and risk and leadership incorporating good practice in Bank- supported projects Source: Lawrence. J. M. Haas. 10 Opportunities in Dam Planning and Management • Engage in advocacy with government counterparts on project design. Use the handbook as a basis for discussion between task teams and government counterparts on the steps and technical advice available for decision makers on the value of embedding good practice in World Bank-supported projects. This discussion is consistent with the Bank’s broader advocacy role. • Facilitate project partnerships. Circulate the handbook among stakehold- ers from government, civil society, and the private sector in World Bank- supported projects to help facilitate the formation and effective functioning of partnerships and to clarify thinking and priorities on what communica- tion support adds the most value. • Foster innovation and leadership in the demonstration of good practice. Use the handbook in suggesting good practice on World Bank-supported projects as a model for sector, country, regional, and wider knowledge sharing. • Help build capacity within project teams. Offer information on training to incorporate in World Bank-supported projects. Notes 1. See World Bank, “Strengthening Bank Group Engagement on Governance and Anticorrup- tion” (discussion paper, meeting of Development Committee, Washington, DC, July 2006). 2. Referring to infrastructure more generally, the discussion paper (ibid.) noted: Because of the importance of an effective dialogue on issues of fraud and corruption, it is important to develop an effective communications strategy that covers all phases of the project. The communications plan must provide for consistent messages to be conveyed to all of the relevant stakeholders: government officials in the implementing agency; con- tractors, suppliers, and consultants who may be involved in bidding on the project; mem- bers of civil society affected by the project; and (as appropriate) the local press. The role of the media may be especially important if the plan includes the use of publicity—both positive and negative stories—as a tool for reducing the level of fraud and corruption in Bank projects. The objective would be to highlight both noteworthy achievements in quality, cost-effectiveness, and sustainability, as well as any incidents of alleged collusion, fraud, or corruption. 3. In today’s context, partnership approaches are pursued to handle the risks and com- plexities of sustainable infrastructure development and management, and many new stakeholder interests are involved. This situation not only elevates the need for commu- nications but also creates opportunities for synergy. 4. See also Larry Haas, Leonardo Mazzei, and Donal O’Leary, Setting Standards for Com- munications and Governance: The Example of Infrastructure Projects (Washington, DC: World Bank, 2007). 5. All dollar amounts are U.S. dollars unless otherwise indicated. 1 Advocacy and Awareness Raising Five key messages on advocacy and awareness raising 1. Communication. Many voices, from dam-affected communities to the World Bank’s Development Committee, have been raised about the need to strengthen and modernize communication practices in dam planning and management. The knowledge and tools are available to create a “cul- ture of communication” on dams that is demand-responsive, is practical, and adds value for all stakeholders. 2. Governance and anticorruption. Infrastructure is classified as a sector at high risk of corruption. Corruption has manifest and disproportion- ate impacts on the cost and quality of service delivery to the poor, and otherwise undermines infrastructure strategies of societies. Transparency and communication underpin most tools to fight corruption. These tools include up-front awareness raising to overcome barriers to action and measures to prevent and detect corruption in collaborative approaches. 3. Sustainability. Sustainability goes beyond the traditional notion of optimizing the design and performance of dams as physical assets for the provision of water and energy services. It also encompasses the notion of optimizing the development performance of dams. Sustainable outcomes are delivered by innovative solutions that balance the economic, social, and environmental performance of dams in a context that can be under- stood by stakeholders. Communication captures and fuses local and expert knowledge, informs judgments, and links multiple actors to deliver sustainable performance. 4. Partnership approaches. Communication capacity forms and activates partnerships at all levels. It is essential to genuinely involve affected people in decisions on dams and to capture the synergy of pro-environment, pro-poor, and anticorruption concerns in dam planning and management (see number 1 ). 5. Project management. Investing in communication is a practical response to the challenges of managing stakeholder expectations across an expand- ing range of issues and growing complexity. Communication is integral to risk management, informing judgments about the risk of corruption and the risks to sustainable performance perceived as important to stakehold- ers. Investing in communication is part of the philosophy of “doing more for less”; it is a central component of risk management and mitigation. 11 12 Opportunities in Dam Planning and Management Bridging the Communication and Infrastructure Paradigms Two broad views of communication on large dam projects prevail. The first is that communication, like transportation, is a derived demand—that is, a means to an end.1 In the context of dam planning and management, the demand for communication derives from the need to enhance sustainable performance, which is defined in more encompassing ways today than in the past, optimizing the wider role of dams in development. The second view of communication is as a professional discipline in its own right, uniquely positioned to offer advice and new tools to help task managers advance pro-poor, pro-environment, and anticorruption solutions in the pro- vision of infrastructure. Understanding the interplay between these two views is essential to improve- ments in communication practices in the over 140 countries that are operating large dams and may plan to build more. The starting point is collaboration be- tween infrastructure and communication practitioners to identify contextual improvements in communication that add value for all stakeholders.2 Some ob- servations might shed light on the possibilities. Global Investment in Water Infrastructure Is Set to Increase Significantly In response to the multiple dynamic pressures on their water resource systems, most developing countries are adjusting their infrastructure priorities and placing economic growth on inclusive and sustainable pathways where popu- lations are growing: • Current estimates of financing needs for infrastructure development and for operation and maintenance across all sectors in developing countries stand at about 7 percent of the gross domestic product (GDP), and they range as high as 9 percent of GDP in low-income countries.3 Water invest- ments, including hydropower and water and sanitation, represent a signifi- cant portion of the total in many countries. • A quarter of the world’s people (1.69 billion) are living in areas character- ized by physical water scarcity. A further billion are facing economic water scarcity because of the lack of investment in water or the human capacity to keep up with demand.4 As water scarcity grows, storage dams are receiving more attention as part of the “options mix” in the imperative to reconcile water demand and supply within river basins. “By promoting economic growth strategies based on expanded infrastructure which are environmentally responsible and socially acceptable we are bringing a sustainable future closer to today’s reality.” —Katherine Sierra, Vice President for Sustainable Development, World Bank (2007) Advocacy and Awareness Raising 13 • Similarly, multipurpose dam projects are receiving more attention as a strategy to maximize development returns on infrastructure investments. In international rivers, multipurpose development expands the scope for mutually beneficial sharing across a wider range of benefits, looking beyond the narrow view of water as a finite commodity to be divided. The new generation of international agreements reflects these aspects. • Today, both the public and private actors are placing more emphasis on the potential contribution of dams to meeting the interrelated policy priorities of energy security, water security, and multicountry regional economic integration.5 Other drivers coming to the forefront are climate change miti- gation and adaptation.6 It is not only the new demands that are driving water infrastructure invest- ment trends. Worldwide, the annual rate of loss in surface water storage due to reservoir sedimentation is estimated to be 0.5–1 percent of the total existing storage capacity.7 Many countries are seeking ways to replace the lost strategic storage that threatens the existing capacity to deliver water and energy services as soil erosion and reservoir sedimentation rates accelerate. In 2003 the World Bank began to scale up its involvement in hydropower, multipurpose dams, and other water infrastructure investment in recognition of global trends. By 2008 the Bank was the largest single external financier in the global water sector.8 For dams and development, “the challenge is to find ways of sharing water resources equitably and sustainably—ways that meet the needs of all people as well as those of the environment and economic development . . . needs that are all intertwined.” —World Commission on Dams (2000) Water Infrastructure Is at the Confluence of Many Development Reforms Along with the resurgence of investment in water infrastructure, many differ- ent strands of governance reform converge in dam planning and management. This convergence widens the range of stakeholder interests in decision pro- cesses at all stages of the infrastructure project cycle: • Governance and anticorruption reforms in infrastructure, water, and energy services, where infrastructure is classified as a high-risk sector, if not the highest-risk sector • Water governance reforms structured around a broader rethinking of water tariffs, water demand–supply reconciliation, and reform of water-related institutions • Reforms in the management of freshwater resources based on integrated water resource management (IWRM) principles, including innovative 14 Opportunities in Dam Planning and Management measures and incentive mechanisms to adapt land-water resource systems to climate change • Reforms in project financing and public–private sector roles, all part of the dynamic shaping infrastructure strategies in most countries • Assurance that the alleviation of poverty is an explicit focus in the provi- sion of infrastructure, also related to meeting Millennium Development Goal (MDG) targets. The cumulative effect of these governance transitions and their interrelated reforms that aim to deliver sustainable infrastructure solutions is more empha- sis on balancing the social, economic, and environmental performance of dams.9 Dams as Communication-Intensive Projects From a communication standpoint, modern forms of dam planning and management call for open, transparent, and inclusive processes that involve dialogue among stakeholders, as well as media relations and partnership approaches. In practice, decisions at all stages of the project cycle would ben- efit from improvements in communication such as: • Public participation processes to reconcile demand and supply strategies and to inform the choice of dams and non-dam options • Communication with the local project-affected populations to ensure that the project design and implementation reflect their needs and concerns, thereby building local knowledge • Communication with key institutional partners on implementation arrangements • Coordination with different sector entities to optimize the benefits of multi- purpose dams—for example, for power, flood management, irrigation, and water supply entities—during the project design and operation stages • Engagements with IWRM entities and end-user groups to locate important decisions about the development and management of dams in the basin context and to reconcile the competing needs of all consumptive and non- consumptive water users • Internal communication among and within the major institutional part- ners when various departments are involved in the project • Advocacy, media relations, and public communication from governments and water institutions to engender support for the project. “The development of infrastructure in the past has not seriously considered a systems or holistic approach. There is a need for institutional integration among different stakeholders and sectors both horizontally and vertically including public-private partnerships.” —Sustainable Infrastructure in Asia: Overview and Proceedings, Economic and Social Commission for Asia and the Pacific (2007) Advocacy and Awareness Raising 15 Communication analysis is especially important where there are deep- seated views. Reconciliation of multistakeholder partnerships and behav- ioral change is essential.10 For example, lowering the walls between public and private investment embodies a shift in the rights and responsibilities of the government, civil society, and private sectors, and it requires new thinking (e.g., public– and community–private sector partnerships). In- formation sharing, dialogue, and negotiation are central to forming part- nerships and to success. Communication capacity is also critical for project innovation and the in- troduction of new dimensions such as benefit sharing, ensuring local com- munities become development partners in projects, and crystallizing the defi- nition of sustainable infrastructure. Adopting a New Generation of Tools Communication tools are evolving. Chapter 3 offers thumbnail sketches of the range of tools practitioners can apply to improve project outcomes and better integrate governance and anticorruption (GAC), sustainability, and commu- nication practices in dam planning and management. Today’s shift in emphasis defines emerging good practice around three di- mensions: (1) governance and anticorruption; (2) provision of sustainable infrastructure; and (3) communication. These three dimensions form the foundation for good practice as infrastructure projects expand their purpose to meet wider development goals. “Corruption is a major cause of poverty as well as a barrier to overcoming it.” —Peter Eigen, President, Transparency International Governance and Anticorruption Orientations Better transparency and accountability enhance the fight against corruption. Active cooperation among the government, civil society, and private sector helps to detect and prevent corrupt practices. Transparency International (TI), whose Global Corruption Report 2008 focused on “Corruption in the Water Sector,” highlights how manifest forms of corruption affect the poor and the environment disproportionately and undermine the infrastructure strategies of countries.11 Table 1.1, adapted from TI’s analysis, illustrates the kinds of corruption vul- nerabilities that exist in hydropower development, starting with the up-front identification of projects through the implementation, operation, and reha- bilitation stages. These risk exposures are present in many large infrastructure ventures in the water sector.12 16 Opportunities in Dam Planning and Management Table 1.1. Corruption Exposures in Hydropower along the Infrastructure Project Cycle Options Contracting/bid Construction/ Operation and selection Project planning evaluation implementation rehabilitation Project Cycle Limited Unnecessary Nontransparent Concealing Commitments not options studies prequalification substandard kept considered work Predetermined, Technical Confusing tender Agreeing to Underfunding of biased specifications documents unwarranted environmental and biased to a contract social mitigation particular variations obligations, no technology money plea Nontransparent Over or under Nontransparent or Creating Corruption in O&M design nonobjective artificial claims procurements selection procedures Limited public Poor EIA Bid clarifications not Biased project Insurance fraud on involvement shared with other supervision equipment and bidders performance guarantees Undue Nontransparent Award decisions not Bribery to avoid Cycle of corruption influence by EIA clearance made public, or not project delay vulnerability proponents justified penalties repeated in rehabilitation works Selection of Deception and Corruption in unnecessary collusion resettlement and projects Agents’ fees and compensation subcontracts to hide A blind eye to bribes or kickbacks construction environmental violations Source: Donal T. O’ Leary. Note: EIA = environmental impact assessment; O&M = operations and maintenance. A comprehensive approach to tackling corruption in infrastructure such as dams is crucial at all levels: national, sector, and project. Both the demand and the supply dimensions of corruption require attention. The supply-side di- mension encompasses North-South flows of money, equipment, and services. Countries must cooperate on the enforcement of international conventions such as the Organisation for Economic Co-operation and Development’s Convention on Combating Bribery of Foreign Public Officials.13 But good governance and anticorruption measures are not just about laws, sanctions, and prosecutions.14 Stamping out corruption requires a fundamen- tally collaborative approach in which affected people are given the chance to speak out and share their concerns. Figure 1.1 illustrates the range of actors that broadly compose the public sector governance system around infrastructure. This figure appeared in the 2007 World Bank Development Committee (DC) strategy paper “Strengthen- ing World Bank Group Engagement on Governance and Anticorruption.”15 Advocacy and Awareness Raising 17 Figure 1.1. Stakeholders in the Public Sector Governance System for Infrastructure Citizens/Firms Political accountability • Political competition, broad-based political parties • Transparency and regulation of party financing • Disclosure of parliamentary votes Civil society and media • Freedom of press Public sector • Freedom of information Formal oversight management • Civil society, watchdogs institutions • Cross-cutting public • Report cards, client • Independent, effective management systems: surveys Citizens/Firms Citizens/Firms judiciary meritocracy public • Participatory country • Legislative oversight finance, procurement diagnostic surveys • Independent oversight • Service delivery and Private sector interface institutions regulatory agencies in • Streamlined regulation • Global initiatives: UN, sectors • Competitive investment OECD Convention, • Transparency initiatives climate anti-money laundering (income and asset • Extractive Industry declarations, etc.) Transparency Initiative • Corporate governance • Collective business associations Local participation and community empowerment • Decentralization with accountability • Community-driven development (CDD) • Oversight by parent-teacher associations and user groups • Beneficiary participation in projects Citizens/Firms Italics = Areas supported in varying degrees by WBG operations. Source: World Bank, “Strengthening World Bank Group Engagement on Governance and Anticorruption,” Strategy Paper, Development Committee, Washington, DC, 2007. Good practice in the prevention and detection of corruption in dam plan- ning and management encompasses the actions of many institutions and peo- ple (figure 1.1) who must act within their own domains while participating in partnerships at different levels. These institutions and people include: • Government executive and cross-cutting control agencies responsible for public finance and human resource management, and frontline regulatory and service provision agencies • Formal oversight institutions outside the executive, including the judiciary, legislature, and other independent oversight institutions • Subnational government organizations and local communities with their own infrastructure and service provision responsibilities, and often with their own local arrangements for control and accountability • Political actors and institutions at the apex who are setting the broad goals and direction 18 Opportunities in Dam Planning and Management • The dam industry, comprising equipment suppliers, contractors, consul- tants, and financial intermediaries • Civil society and the private sector in their roles as both watchdogs with the independent media and the “recipients” of services and regulations and thus a potential source of advocacy and pressure for better performance. Chapter 3 describes the practical tools that task managers can use to ad- dress corruption risks at different stages of the infrastructure cycle. The com- mon theme of these tools is their underpinning of transparency and commu- nication, from up-front awareness-raising and advocacy activities, to efforts to overcome barriers to action, to the mechanisms to identify, agree on, and im- plement priority measures in collaborative ways. What are the differences between past GAC practices and a communication per- spective? As yet there is no standard or required approach to embedding anticor- ruption measures in dam projects. On Bank-supported projects there are, of course, the protections afforded by disclosure policies and other prescriptions for good governance that relate to transparency, accountability, and formalized audits. However, as TI notes in its comments on the World Bank Governance and Anticorruption Strategy, these measures are necessary but not sufficient.16 As discussed further in chapter 3, concerted action to manage corruption risks on dam projects starts with two practical approaches: 1. Signal the need for an anticorruption component in the up-front identi- fication and conceptualization of a project,17 followed by an in-depth cor- ruption risk assessment (CRA) in project preparation. 2. Embed a governance improvement plan (GIP) in the project governance framework as a routine element of the risk management system in the implementation stage, and update the GIP at the start of operations and periodically thereafter. The GIP would prioritize measures to mitigate risks identified in the corruption risk assessment. A communication-based assessment (CBA) would inform judgments on what is needed for effective collaboration at each step. The cor- ruption risk assessment also should link to the communication needs assess- ment (CNA) in order to prioritize communication support on each measure. Concerted action in combating corruption means maintaining pressure to build a multistakeholder consensus in the public sector governance system around infrastructure. This finding is illustrated in figure 1.1. • Tackling corruption is in the interests of all stakeholders because it affects the level and quality of services, the equitable distribution of benefits, and sustainability. • Tackling corruption is a gradual, long-term process that involves changing attitudes that tolerate corrupt practices, retraining staff, and restructuring institutions. Advocacy and Awareness Raising 19 • Concerted action requires assigning priority to the methods for achieving transparency, engaging civil society, assessing mechanisms for regular inde- pendent monitoring, and enlisting the support of stakeholders. Table 1.2 illustrates the differences in enabling or moving from past or cur- rent practice to good practice. Perhaps the most important measure of success is that corruption risk assessment and mitigation are routinely a part of a comprehensive, integrated risk management framework on all dam projects. Table 1.2. What Is the Difference between Thinking and Practice? Preventing and Detecting Corruption in Dam Planning and Management Typical past thinking or practice Enabling or representing good practice Change in thinking ✂ Corruption is always a concern, but it is not ✓ Combating corruption is in the interest of all the same priority as getting water and stakeholders. In the end, governments and energy services flowing. citizens will pay a price: lower service levels, investments, and incomes. ✂ Government is responsible for governance ✓ Fighting corruption is a shared responsibility. and anticorruption measures and the Coalitions are required to fight corruption at appropriate legislation. each stage of the infrastructure project cycle. ✂ Corruption primarily occurs in construction ✓ “Grand” and “petty” forms of corruption have and the procurement of goods and disproportionate impacts on the poor. services. “Grand corruption” is the most Corruption risks exist at all stages of the important. project cycle. ✂ Focus is on detecting corruption. ✓ Focus is on prevention and detection, supported by the government’s prosecution powers. ✂ Corruption is not part of the normal ✓ Dealing with corruption risks is an integral project risk assessment; it is largely related part of comprehensive risk management. to reputational risk. Corruption threatens all dimensions— economic, social, and environmental—of the sustainable performance of dams. Change in practice No corruption risk assessment (CRA) is ☺ CRA looks at corruption risk exposures at undertaken for dam projects. each stage of the project cycle as part of an integrated risk assessment framework, with advocacy used to make the case. No formal program identifies or manages ☺ Governance improvement plan (GIP) is corruption risks, apart from following incorporated in projects to reflect risks normal procedures, including procurement identified in a CRA, covering the design, and disclosure. implementation, and operation stages. Communication is not explicitly deployed ☺ Communication strategy is prepared to or emphasized as a tool to help combat support the GIP, using advocacy, awareness corruption. raising, and support of multistakeholder partnerships for each measure. Civil society, local communities, and ☺ Local stakeholders fight corruption through consumers of services have no formal role monitoring, watchdog action, Citizen Report in detecting and preventing corruption. Cards, and hotlines. No lessons are drawn from country ☺ The CRA and GIP are benchmarked against experience combating corruption on other emerging national, regional, and global dam projects or in other infrastructure practices, and this information is shared with sectors. stakeholders while formulating the GIP. 20 Opportunities in Dam Planning and Management Provision of Sustainable Infrastructure Sustainable development in the context of today’s dam projects means balancing the economic, social, and environmental performance of dams without compro- mising the ability of future generations to adjust this balance over time.18 Decisions on this balance must be informed by stakeholder values and expec- tations across a range of development issues and themes. Equally important, the prospect of progress across generations calls for building in, whenever feasible, flexibility to allow adaptive management of both the physical structures and the operating procedures of new dams and dam rehabilitation works.19 Figure 1.2 illustrates generic governance issues and themes at the forefront of dam planning and management when looking through a multifaceted sus- tainability lens.20 It shows examples of process-oriented tools, such as environ- mental assessment, and performance-oriented tools, such as benefit sharing. At the center of figure 1.2 is communication for sustainable infrastructure. This configuration illustrates the notion of interdependence and the need to connect to stakeholder interests around each theme. As illustrated, two-way communication empowers inclusive decision mak- ing and multistakeholder partnerships, which are often the best mechanisms for delivering sustainable performance on dams when competing interests must be reconciled. Chapter 3 offers thumbnail sketches of tools to support each sustainability theme in figure 1.2. These sketches note the type of good practice communica- tion support available for each tool. Figure 1.2. Old and New Sustainability Themes in Dam Planning and Management Process- IWRM Performance- oriented tools principles and reforms oriented tools Environmental Climate change assessment (mitigation + adaptation) Integrated Communication Benefit sharing sustainability for sustainable (monetary and assessment infrastructure nonmonetary) Local participation Dam safety and and partnerships physical performance Anticorruption (prevention, detection, and prosecution) Source: Lawrence J. M. Haas. Advocacy and Awareness Raising 21 Box 1.1. Featuring Communications and Governance in the Hydro Sustainability Assessment Protocol (HSAP) “Sustainability [in hydropower] is a fundamental component of social responsibili- ty, sound business practice and natural resource management. . . . [I]t is a collective responsibility of government, business, civil society consumers and individuals.” —International Hydropower Association, Sustainability Assessment Guideline (2004) and Sustainability Assessment Protocol (2006) The Hydro Sustainability Assessment Protocol (HSAP),a issued in November 2010, is a sustainability assessment framework for hydropower development and operation. It facilitates the production of a sustainability profile for a hydroelectric project for a number of priority sustainability topics. The Protocol includes four stand-alone sections that reflect different stages of hydropower development. Through an evaluation of basic and advanced expectations, the Early Stage tool may be used for risk assessment and for dialogue prior to advancing into detailed planning. The remaining three docu- ments, Preparation, Implementation, and Operation, set out a graded spectrum of practice calibrated against statements of basic good practice and proven best practice. The graded performance within each sustainability topic also provides the opportunity to promote structured, continuous improvement. Each of the Protocol sections relating to Preparation, Implementation, and Operation include sustainability topics entitled “Communications and Con- sultation” and “Governance”; in addition, the Preparation and Implementation sections of the Protocol contain a section on “Procurement.” The Communi- cations and Consultation topic addresses “the identification and engagement with project stakeholders, both within the company as well as with external stakeholders (e.g. affected communities, governments, key institutions, part- ners, contractors, catchment residents, etc.)” with the intent of establishing “a foundation for good stakeholder relations throughout the project life. The Governance topic “addresses corporate and external governance consider- ations for the project [with] the intent that the developer has sound corpo- rate business structures, policies and practices; addresses transparency, integrity and accountability issues; can manage external governance issues (e.g. institutional capacity shortfalls, political risks including transboundary issues, public sector corruption risks); and can ensure compliance.” The Procurement topic “addresses all project-related procurement (works, goods and services) with the intent that procurement processes are equitable, transparent and accountable; support achievement of project timeline, quality and budgetary milestones; support developer and contractor environmental, social and ethi- cal performance; and promote opportunities for local industries.” The Protocol was the result of a two-and-a-half-year process under the guidance of the Hydropower Sustainability Assessment Forum (HSAF), which consisted of representatives of developing countries (China and Zambia), developed countries (Germany [observer], Iceland, and Norway), the finance sector (Equator Principles Financial Institutions and the World Bank [ob- (continued next page) 22 Opportunities in Dam Planning and Management server]), the hydropower sector (the International Hydropower Association and HydroTasmania), and nongovernmental organizations (Oxfam, The Nature Conservancy, Transparency International, and World Wide Fund for Nature). a. http://www.hydropower.org/sustainable_hydropower/HSAF_Hydropower_Sustainability_ Assessment_Protocol.html. What are the differences between past practices and a communication perspec- tive? There is a continual process of knowledge development, innovation, and improvement in the tools available for dam-related planning, management, and technical issues, all of which enhance the sustainable performance of dams. Many countries are experiencing small but frequent improvements in practices over time. The accumulation of these improvements amounts to a radical change in thinking about dams and sustainability. Take, for example, environment flows. In less than a decade environmental flow assessment (EFA) and provision has gone from a relatively obscure prac- tice to one now widely recognized, even if adoption is not yet as widespread.21 Today, there is a broad call for integrated sustainability assessment (ISA) approaches and better integration of existing sustainability assessments, rec- ognizing the intertwining of different sustainability aspects: environmental, social, financial, and institutional. It is not enough to look at one aspect in isolation, such as social sustainabil- ity, without considering whether measures to ensure it are sustainably financed, or whether the institutional capacities for monitoring, compliance, and com- munication that empower people to take local action have sufficient resources. The call for ISA approaches ties into that of working to mitigate risks that stakeholders perceive as the most important. The underlying trend is to de- fine risk comprehensively—that is, as risk to stakeholder expectations and values, including the sustainable performance of dams and reputational risk. The risk of impoverishment is linked to risk to healthy ecosystems and the ability of local people to manage ecosystem services from which they derive their livelihoods.22 An integrated sustainability assessment addresses many perceived failures to meet stakeholder expectations and to deliver the social and environmental performances of dams. Frequently, one underlying cause is the lack of money set out in operation-phase environmental management plans to pay for long- term measures or for integrating the project into the local economy and cul- ture. In this context, sustainable performance means moving away from the high-risk strategy of sole reliance on overburdened state or municipal budget funding for long-term social and environment management measures. In- stead, good practice means looking for sustainable financing to internalize these costs in bulk tariffs for water and energy services. Advocacy and Awareness Raising 23 Investing in communication for sustainability is not only to support multi- stakeholder processes that inform the policy framework and project design parameters but also to inform the adaptive management of dams based on values important to the local community and people who use the river. Adap- tive management is a way of thinking that must be translated transparently for all aspects of dam management, from bulk water supply agreements or power purchase agreements to arrangements for multistakeholder review of impact monitoring and statutory provisions to require operators to act on monitor- ing results. Table 1.3 illustrates the differences in thinking and practice in terms of enabling conditions and adopting good practice to enhance sustainability in dam planning and management. Communication as an Evolving Practice Like engineering, environmental science, and economics, communication has different areas of practice—all applicable to project planning and manage- ment. The four areas of communication practice most relevant to contempo- rary dam planning and management are (1) development communication, (2) corporate communication, (3) advocacy communication, and (4) internal communication.23 Figure 1.3 illustrates the main aspects of each area of communication prac- tice. Project managers should be broadly familiar with these aspects in order to better judge which can add value to their specific project when they assign priority to communication investments.24 Each communication practice has a specific scope, approach, and set of tools. Good communication practice on a dam project would start with a communication-based assessment that considers how each area of commu- nication can help to advance project goals. The CBA determines for the prac- titioner what is essential (1) to understanding the risks that different stake- holder interests perceive to be important, (2) to building trust, and (3) to managing stakeholder relations successfully. The Development Communication Focus Figure 1.4 illustrates the four-phase development communication framework used in all World Bank operations, including dam projects. The four phases are communication-based assessment, strategy formulation, implementation, and evaluation. The communication strategy for each stage of the infrastructure project cycle implies repeating the four-phase development communication cycle at the start of the operation phase, which will be discussed in more depth in chapter 2. Chapter 3 offers thumbnail sketches of tools and techniques for each phase. 24 Opportunities in Dam Planning and Management Table 1.3. What Is the Difference between Thinking and Practice? Enhancing the Sustainability of Dam Projects and Balancing the Economic, Social, and Environmental Performances in Context Typical past thinking or practice Enabling or representing good practice Change in thinking ✂ Sustainability of dams is narrowly defined as ✓ Sustainability is widely defined as achieving environmental, financial, or structural balance in the economic, social, and integrity. environmental performance of dams. Stakeholders participate in negotiating or setting that balance. ✂ Dams are optimized as physical assets for ✓ Dams are optimized for sustainable the delivery of water and energy services. performance, overall development effectiveness, and equitable distribution of benefits and cost. ✂ Sustainability measures are financed over ✓ Sole reliance on government budgets is the long term by government budget replaced by internalizing the cost of allocations at municipal or higher levels. financing sustainability components in bulk supply tariffs. ✂ Adaptive management is viewed as a nice ✓ Adaptive management is based on impact concept but essentially a luxury constrained monitoring and multistakeholder review to by “real-world” needs such as contracts. inform regulatory oversight (e.g., on reservoir operating strategies and downstream releases). ✂ Supply and demand management decisions ✓ Fundamental approach of demand-supply are made separately. Basin development is reconciliation is adopted, placing decisions built around a hydropower development about dams in the river basin (integrated plan. water resource management ) context. Change in practice Limited or narrow baseline studies are a low ☺ Baseline studies are undertaken early, priority compared with “real action,” such as covering each sustainability dimension to site preparation works. provide performance improvement baselines, while consulting with people. Assessments of environmental, social, and ☺ Integrated sustainability assessment or economic impact/mitigation are linking existing sustainability assessments is compartmentalized or narrowly defined. undertaken, involving stakeholders in eliciting values and expectations. Stakeholders are engaged primarily through ☺ Explicit mechanisms are adopted for information dissemination, onetime surveys, multistakeholder involvement in the project and some consultation. governance structure empowered to report to regulators and public. Environmental and social management ☺ Benefit-sharing and revenue-sharing components are financed through mechanisms are adopted to fund core government budget allocations. budgets for all long-term sustainability aspects that people value. Compensation flow releases in water transfer ☺ Environmental flow assessment and projects are based on rule of thumb—for provision inform design (e.g., size of outlets, example, 10 percent of minimum flow. variable level intakes) and adaptive management. Impact is monitored, but there is no ☺ Impact monitoring with stakeholder review is requirement for dam operators to act on linked to regulatory systems that specify results unless concerns can mobilize political adaptive management of dams linked to the pressure. water quality-quantity status of river basins. Advocacy and Awareness Raising 25 Figure 1.3. Four Areas of Communication Practice Relevant to Contemporary Dam Planning and Management Development communication • Structures design and supervision of communication programs around the four-phase development communication methodology (detailed in chapter 3) • Explores and assesses the development context, builds a wider consensus among stakeholders, and assigns priority to communication activities • Applies a communication-based assessment (CBA) to generate an overarching and multilayered project communication strategy to engage interested and affected parties in decisions on different aspects of a project and on implementation and operation • Encompasses emergency or crisis communication otherwise minimized by investing in an up-front CBA to understand and address expectations. Corporate communication Internal communication • Uses media and other • Plays an essential role in methods to explain what a the internal governance public or private enterprise for a project or the is and does, not simply to organization implementing boost image but also to a project serve stakeholders • Ensures the timely flow • Consists of the procedures, of accurate, relevant rules, and “communication Corporate information so people can culture” the organization communication Development interact and do their jobs brings to dam planning and communication • Achieves an internal management consensus on goals and • Tells how the entity reflects messages before going government policy and Internal “outside” communication Advocacy how it will implement communication • Is central to dam planning reforms on its dam projects and management when • Explains corporate ethics multiple new organizations and how the organization are created—as in water will combat corruption, governance reforms with provide access to multiple new users information, and pursue • Facilitates actual operation the sustainability agenda of projects in accordance with the assumptions made in their design Advocacy communication • Raises awareness and wins support with the public or influences relevant policy making • Mobilizes a multistakeholder coalition to make the case for embedding anticorruption measures in dam projects or sustainability measures, such as environmental flow assessment and provision and benefit sharing. What Is New or Significantly Different? Good communication practice is universally recognized by communication practitioners as an integrated two-way process. This approach recognizes the strong views across a range of interests in dam projects, reconciling and man- aging stakeholder expectations. Strengthening governance and sustainability in dam planning and manage- ment is more a change of emphasis than a radical departure: • More emphasis on the analytical components of communication. Greater use of communication-based assessment tools, such as stakeholder analysis, public opinion research, and attitude surveys, to inform design of the proj- ect components. 26 Opportunities in Dam Planning and Management Figure 1.4. The Four-Phase Development Communication Process: Activities and Outputs (1) (2) (3) (4) Objectives Work plan ME indicators Communication- Communication Communication Communication based strategy implementation evaluation assessment formulation (indicators) Identify/analyze/refine: Select and design: Carry out: • Audiences/ • Communication • Pretesting stakeholders approaches • Media production • Risks • Messages • Training activities • Opportunities • Learning systems • Message • Needs dissemination • Solutions • Media/channels Dynamic feedback • ME indicators • Objectives Source: Development Communication Division, World Bank. Note: ME = monitoring and evaluation. Figure 1.5. Analytical Support for Communication Needed through All Project Cycle Stages For design For implementation Trend Implementation + CBA up-front on CBA during operation expectations, implementation/ For design decisions behavioral monitoring, etc. decisions dynamics, etc. The right contextual balance for the analytical component of communication Source: Lawrence J. M. Haas. • More emphasis on advocacy of good practice. Greater use of advocacy communication tools, which make the case for good practice, supporting the goals of anticorruption and sustainability. • More emphasis on communication in project implementation and oper- ation. Comprehensive communication support over all stages of the infra- structure project cycle, focusing not just on preparation but also on implementation and operation. Why these greater emphases? The survey of Bank task managers for projects in Latin America noted in chapter 3 clearly indicates that after the Board approval stage of the World Bank project cycle the project-related communication investment often declines. The communication-based assessment explores ways to extend communi- cation support through the implementation and operation stages. These ac- tivities help the practitioner to monitor how multistakeholder partnerships are functioning, to evaluate and balance power relationships, and to detect Advocacy and Awareness Raising 27 and rectify potential problems in their early stages before adding significantly to project risk. Figure 1.5 illustrates this concept. Ultimately achieving good governance and sustainability in dam planning and management entails adopting comprehensive communication strategies that use a wide range of tools, channels, and messages (table 1.4). Each of these activities targets specific needs in the wide range of stakeholders to support common project goals. Table 1.4. How Each Communication Practice Helps to Advance Governance and Sustainability Improvements in Dams Development Internal Corporate Advocacy communication communication communication communication 1. Prepare an 1. Focus on how 1. Align communication 1. Each organization overarching project communication strategies of public involved in dam communication enhances internal enterprises and planning and strategy using the project governance, private organizations management four-phase coordination of involved in dam advocates its delivery development actions, and project with and support of communication multistakeholder international and beneficial change in methodology. partnerships. regional best the project in terms 2. Benchmark the 2. Consider ways and practice and norms of government communication means of improving for corporate policies and the approach and tools communication communication, regulatory used against the (1) between including governance environment. practice and share stakeholders and and anticorruption 2. Advocacy builds results with multidisciplinary (GAC) and support for stakeholders. experts working on sustainability incorporating 3. Maximize structural and themes. corruption risk coordination with nonstructural 2. Link risk assessments and environmental impact components of the management and governance assessment (EIA) and project, (2) within sustainability improvement plans, as the emergency project team and objectives at the well as new measures preparedness plan partner institutions, corporate and to advance dam (EPP) communication and (3) between the project levels to project sustainability, components to contractor and the stakeholder values such as environmental enable the public to construction work and expectations, flow assessments and participate in and to force. respectively. design aspects influence decisions 3. Track how 3. Adopt corporate relevant to climate that affect them. communication communication mitigation and 4. The four-phase affects project strategies that adaptation. development outcomes and explain policies to 3. Where feasible, communication project perceptions prevent and detect project authorities methodology is by the public and corruption, set out offer to hold field repeated to produce stakeholders. ethical behavior for trials for the most an operation stage 4. Undertake a working with promising new communication communication- stakeholders, and methodologies that strategy, drawing based evaluation for spell out disclosure add value to the lessons from risk management. and access to overall development implementation stage information policies. effectiveness of the communication. project and then transfer lessons to other dam projects in the basin, country, or region. Source: Lawrence J. M. Haas. 28 Opportunities in Dam Planning and Management Table 1.5 illustrates the differences in thinking and practice in creating en- abling conditions and adopting good practice communication in dam plan- ning and management. Table 1.5. What Is the Difference between Thinking and Practice? Modernizing Communication Practices in Dam Planning and Management Typical past thinking or practice Enabling or representing good practice Change of thinking ✂ Communication function for dam projects is ✓ Communication goes beyond transmission of mostly dissemination of information and messages; it is a two-way dialogue to engage public relations (PR). people in the development decisions affecting them. ✂ Unsupervised communication adds risk, has ✓ Communication is essential to advocating potential to stir up controversy, and opens good practice, advancing understanding, and “Pandora’s Box.” mitigating the risks each stakeholder perceives as important. ✂ Communication is important but not central ✓ Communication is essential to helping to the delivery of water and energy services. identify and adopt good practice across a range of issues and interests for sustainable infrastructure provision. ✂ Research and analytical components of ✓ Analytical components are central to development communication are nice if clarifying political and cultural dynamics affordable, but they come on top of routine and behaviors that hinder or advance project management judgments. reform, project goals, and functional multistakeholder partnerships. ✂ The “least-cost” strategy for communication ✓ A “least-cost” strategy for communication, investment in dam projects is to do the and the project as a whole, is to measure and minimum needed for information then manage expectations and empower dissemination and to respond to crises if and multistakeholder partnerships that resolve when they arise. and minimize conflict. Change of practice CBAs are not undertaken during project ☺ CBA tools connect decisions on dams to preparation to inform the project design. policy reforms at each stage of the project and help maintain multistakeholder partnerships. One project communication strategy is ☺ Communication strategies should be sufficient to cover all stages of the project prepared for each project cycle stage, cycle for dam projects, with minor updates. building on the previous stage as issues differ, expectations and risks evolve, people change, and actors change roles. Decisions on communication messages, ☺ Communication activities should be strategy, and activities are the responsibility benchmarked against relevant good practice of project management. and the results shared with stakeholders. Communication evaluations are rapid ☺ Communication evaluations should be exercises generally not shared with undertaken in close cooperation with stakeholders. stakeholders, and they should contribute to continual improvements in communication strategies to maintain a sustainable performance of dams in line with stakeholder expectations. Advocacy and Awareness Raising 29 Capturing Synergy from Governance, Communication Sustainability, and Communication The notion that communication plays a key role in Sustainability Governance introducing governance reforms and providing sus- tainable infrastructure is not new. What is new is link- ing these mutually reinforcing elements in dam planning and management as an explicit strategy. This new strategy makes conceptual and practical sense; it helps to manage risks and expectations systematically. Conceptually, the opportunity for three-way synergy stems from the fol- lowing typical situations: • Reforms, whether for anticorruption or water governance, are set within a par- ticipatory framework, requiring more open and inclusive decision processes. • Governance and sustainability connect in many issues and interests. These involve the same interested and affected parties who inform decisions on competing interests or cooperate on shared interests. • Synergy is achieved when the issues are tackled holistically, thereby achiev- ing more for less. This approach avoids inefficiency and unnecessary con- fusion on the ground. According to Transparency International’s Global Corruption Report 2008, “Few things are more fundamental to sustainable development than ensuring that the management of the world’s water resources is sustainable, equitable, efficient and free from significant governance failures, including corruption.” This quote highlights the juxtaposition between corruption and sustainability in water management.25 Communication supports anticorruption efforts, which in turn support sustainability by mitigating risks to the social and envi- ronmental performance of dam projects. In real life, many of these issues are inseparable to people on the ground. For example, when the project authorities meet with host communities or river users to talk about one set of issues such as the environmental manage- ment plan, people will generally raise all of the issues that concern them. Con- troversial issues are not easily dealt with in isolation—confidence and trust are built by resolving the issues that affect the whole relationship. The Berg Water Project, described in appendix A, is a clear illustration of synergy among issues important to stakeholder and project management. The multistakeholder environmental monitoring committee became the main platform for dialogue on resolving social sustainability concerns about the project, including the equitable sharing of benefits with the host community. In response to the concerns, the environmental monitoring committee (EMC) actually set up working groups to deal with aspects of project governance and sustainability. EMC members also agreed on a comprehensive communication protocol. This protocol guided member interaction, communication with re- spective constituencies, and engagement of the media. 30 Opportunities in Dam Planning and Management Figure 1.6. Multiple Aspects of Governance Reform and Its Impact on the Policy and Planning Context of Dam Projects Policy and • Anticorruption policy legislation • Water governance • Climate mitigation and adaptation • Delivery of public services • Public-private investment Macro level Infrastructure strategies, project Sector level concepts, identification, and selection Project level Project design, (dam project) implementation, and operation Source: Lawrence J. M. Haas. Connecting the Project to the Governance Reform Agenda Another practical aspect of three-way synergy is that it aligns different threads of governance reform evolving from infrastructure strategies to ensure that coherent approaches are followed to implement and manage what may be sev- eral dam projects throughout the basin or country. In most countries, interconnected governance reforms under way at the macro and sector levels create a changing policy dynamic for dam planning and man- agement, as illustrated conceptually in figure 1.6. Communication-based assess- ment diagnostics give task managers a better picture of the dynamic change and the need to link these aspects to project design and management decisions. Communication analysis helps in understanding the important nontechnical or adaptive challenges that impede the success and sustainability of reform ef- forts. Conversely, it is important to understand which reforms can be tried at the project level to demonstrate the efficacy of reforms, thereby advancing innova- tive thinking and the grounding of sector-level and macro reform policies. How Is Synergy Captured? Figure 1.7 is a simplified illustration of how to capture this synergy. From the anticorruption perspective, the impetus for improving governance typically originates in the public sphere. A good understanding of the public sphere helps to use advocacy effectively in including anticorruption measures in spe- cific dam projects and to decide the best approach operationally to introduc- ing GAC measures. From the sustainability perspective, it is important to understand how the performance of the dam connects throughout the sector. Relevant questions might be: What role does hydropower play in the sustain- able development of the power sector? Is it feasible to reduce the reservoir drawdown to improve environmental and social performance? How can one best meet greenhouse gas (GHG) or air quality emission reduction targets Advocacy and Awareness Raising 31 Figure 1.7. Synergy Starts by Linking Communication-Based Assessment with Other Strategic and Technical Assessments Project task team Strategic assessment/analysis Communication-based (technical, financial, assessment/analysis environmental, and social (communication practitioners analysis performed by and specialists) other area specialists on the task team) River basin context Public sphere framework (integrated water Dam resource management project Evolving sociopolitical and economic reforms) conditions that define governance reforms, intersecting dam planning and management Sector context Government, civil society, private (water, power sector partnerships, and role of sector, etc.) the media Source: Lawrence J. M. Haas. while balancing energy needs or water security? From the river basin manage- ment perspective, it is important to understand how the operation of the res- ervoir complements policies to achieve sustainable management of water resources and how to connect and implement a range of policies for long-term management of wetlands systems in the basin. Another aspect of figure 1.7 highlights the importance of linking the differ- ent practitioner assessments (e.g., sustainability assessments, corruption risk assessments, communication-based assessments) to identify and take advan- tage of synergy from an early stage in the project. All of these assessments are an important contribution to the design of the project governance structure. They enable the appropriate mechanisms to capture synergy in the implementation and operation stages and to build it into the project through monitoring, multistakeholder review, and annual feedback meetings with the host community and river users. Adding Value for Relevant Groups of Stakeholders Like any investment in a dam project, investments in communication must add value. From different perspectives, communication and the governance- sustainability-communication synergy can add value along several dimensions. 32 Opportunities in Dam Planning and Management Table 1.6. Added Value of Communication: Project Management and Stakeholder Perspectives Project management perspective Stakeholder perspective Communication offers . . . Communication offers . . . • Improved project and portfolio quality and • Opportunity to better communicate outcomes; alignment of dam decisions to expectations and have a voice in development evolving policy priorities decisions affecting stakeholders and their • Improved capacity to measure and manage community expectations and risks • Better service and multiple benefits flowing • Ability to achieve more for less; simplify from reduced corruption and sustainable responses to complexity by empowering performance of dams more robust partnership approaches; improve • Systematic attention to stakeholder-identified trust risks, which results in less frustration • Ability to reach difficult decisions on dam • Better integration of dam projects into the projects; enhance political legitimacy; local economy and culture minimize costly delays • Opportunity to view dam projects as major • Improved public acceptance of infrastructure development interventions, which is a catalyst strategies and decisions on large dams for local and regional development, leading to • Opportunity for task managers who use good greater opportunity and empowerment, such practice to facilitate work with stakeholders as job creation and gather more resources, including support from Bank management Table 1.6 illustrates the perspectives of project management and stakeholders on the value added by communication. If people feel they have been adequately consulted and involved in decision making, they will be more likely to support the resulting decisions. This theory has repeatedly received support in many fields and countries in the past, but it is relatively new to decision making for water resources and dam planning and management. Based on Australian experience in water management, figure 1.8 shows the pre- ferred level of public involvement in a partnership as opposed to community domination of decision making or top-down decision making by government or project authorities. Planning professionals also prefer partnership arrangements.26 The case studies in appendixes A and B illustrate the appetite of project-af- fected populations for adequate involvement in the decisions that affect them. Whether project authorities have the mandate to make management decisions is not the question; rather, it is the desire of stakeholders to ensure that their expectations to benefit are fully understood and realized to the maximum ex- tent possible, recognizing there may be trade-offs with other stakeholders. Reinforcing the Advocacy Roles of World Bank Task Teams Advocacy is a vital aspect of Bank-supported projects in several respects. First, as an international development institution that provides technical advice, guidance, and information to member countries, the Work Bank places Advocacy and Awareness Raising 33 Figure 1.8. Community and Planners’ Perceptions of Current Community Roles and Preferred Community Influence in Water Management Decisions 50 Current, community 45 Current, organizational 40 35 30 Percent 25 20 15 10 5 0 No interaction Informing Consulting Involving Shared Community Community planning decisions control Source: Energy Sector Management Assistance Program (ESMAP), “Stakeholder Involvement in Options Assessment: Promoting Dialogue in Meeting Water and Energy Needs—A Sourcebook,” World Bank, Washington, DC, July 30, 2003. great stock in advancing good practice and continual improvement in many areas of development policy. On the themes of sustainable infrastructure and anticorruption, the World Bank is at the forefront of developing good practice. The Bank’s own internal reformulation of its Operational Directives into the three-tiered structure of (1) policy, (2) procedures, and (3) good practice reflects its priorities of gener- ating and disseminating good practice.27 Second, it is in the interest of task managers to ensure the proactive promo- tion of good practice when working with client governments on Bank-sup- ported dam projects, according to contextual needs. Advocacy recognizes the intertwining roles of various stakeholders—such as the government, interna- tional organizations, nongovernmental organizations, civil society groups, and the private sector—that are essential in the development and manage- ment of sustainable infrastructure, as well as anticorruption reforms that serve everyone’s interests. Advocacy starts with understanding the development context and contin- ues with preparing key messages to influence perceptions and behavior in the early stages of project formulation and design. It is, however, also important during the implementation stages, which can span several years, because the operating arrangements of dam projects crucial to environmental and social performance are often decided closer to the project commissioning stage. Sim- ilarly for rehabilitation projects and operational improvements, various di- mensions of advocacy can be considered. Table 1.7 explains why steps to build anticorruption components into the design of dam projects are important from all stakeholder perspectives. It 34 Opportunities in Dam Planning and Management also shows why, to be convincing, an effective communication strategy should contain a common interest message to help form partnerships and coalitions. Task managers should work closely with country clients to identify oppor- tunities for building good practice measures in Bank-supported projects and to develop an effective advocacy strategy based on coalition approaches. Table 1.7. Why Fighting Corruption in Hydropower Is in the Interest of All Stakeholders Stakeholder group Corrosive effects of corruption • Less affordable electricity a • Less access to electrical services for poor and low-income people Electricity consumers • Slower pace of expanding access to electricity in the country • Lower reliability of supply and levels of service • More high-impact or “bad projects” approved Communities affected • Higher adverse livelihood impacts and impoverishment risks adversely by hydropower • Fewer funds for compensation, mitigation, and benefit sharing development • Fewer commitments kept for the construction and operation stage mitigation necessary for sustainable management of hydropower asset • Higher costs for bulk energy purchases or own supply • Higher borrowing and equity contribution costs for investments Electricity utilities • Greater financial constraint on expanding electricity access and improved levels of service • Expensive to operate and maintain infrastructure and delays • Higher power sector costs • Higher repayments for sovereign loans or guarantees Governments • Setbacks to social policies and poverty alleviation • Lower rates of economic growth that depend on expanded or improved electricity services with a comparable reduction in job creation • No level playing field for fair competition Public hydropower • Possible termination of licenses or approvals procured through developers and operators bribes, resulting in collapse of project and independent power • Distortion in criteria for forming project consortium producers (IPPs) • Disqualification from office or criminal prosecutions • Distorted and unfair competition for equipment suppliers • Higher and wasted tender expenses Contractors and E&M • Termination of contracts procured through bribes, resulting in the equipment suppliers collapse of the contractor and loss • Criminal prosecutions, fines, blacklisting, and reputational risk Financers: Export credit • Higher reputational risks if corruption is proven on project support agencies, multilateral • Higher than necessary requests for borrowing development banks, • Additional costs and fraudulent claims commercial banks, credit • Financial loss agencies, and insurers Source: Transparency International, extracted from the initial drafts of the Hydropower Section of the Global Corruption Report 2008. http://www.transparency.org/publications/gcr/gcr_2008. Note: E&M = electrical and mechanical. a On multipurpose projects, consumers include irrigators, urban water users, or any groups that would benefit from reducing corruption in water and energy service provision from multipurpose dams. Advocacy and Awareness Raising 35 Notes 1. In the language of economics, derived demand is where demand for one good or ser- vice occurs as a result of demand for another. 2. A vast difference exists between agreeing on what constitutes beneficial change in com- munication practices and agreeing to commit the necessary financial and human resources, particularly because the task manager’s aim is often to do more for less to meet budget constraints. Here it is necessary to overcome the resistance of some infrastructure practitioners to investing in modern communication. Their first instinct may be to see this investment as just another complication, or burden, rather than a derived demand that offers solutions to real-life complexity. It is clear that the challenges in proactively and simultaneously tackling corruption, enhancing sustainability, and improving com- munication around dam projects are intertwined, as are the many rewards. 3. See the World Bank’s Web site on infrastructure financing, http://web.worldbank.org/ WBSITE/EXTERNAL/EXTABOUTUS/ORGANIZATION/EXTINFNETWORK/0,,con tentMDK:20535656~menuPK:1827891~pagePK:64159605~piPK:64157667~theSit ePK:489890,00.html. 4. International Water Management Institute (IWMI, Colombo, Sri Lanka), “Water for Food, Water for Life: Insights” (paper prepared for Stockholm World Water Week, 2006). 5. These sectors are (1) realigning energy policies to reflect the urgency to move to low- carbon energy systems based on renewable energy resources, including hydropower, and meet emission reduction targets at the national and regional levels; and (2) advancing new financing models, such as public-private investment models for strate- gic infrastructure provision where the challenge is to find the proper balance between public and private sector risk allocation and responsibilities and public acceptance. 6. For example, to reduce global greenhouse gas emissions by replacing fossil generation with hydropower and providing the strategic flexibility to adapt to local manifestations of climate change by increasing water storage. In combination with demand manage- ment, additional water storage capacity relieves the pressure on existing water resource systems. It provides the climate with “headroom” to better adapt to climate variability and extremes. 7. According to George W. Annandale, president of Engineering and Hydrosystems Inc., the worldwide average annual rate of storage loss from reservoir sedimentation is on the order of 0.5–1 percent of total storage capacity. This amounts to having to replace some 300 large dams on an annual basis worldwide, at an estimated cost of $9 billion just to replace existing storage capacity (and not counting the cost to deal with envi- ronmental and social issues). Reservoir conservation and sediment management in reservoirs are an effective approach to maintaining existing storage capacity so that not as many new dams have to be constructed. It is also advisable to design new dams in a manner that will facilitate sediment management and long-term reservoir conserva- tion. George W. Annandale, “Reservoir Conservation and Sediment Management,” speech delivered to Water Week, World Bank, Washington, DC, April 2001. 8. The Bank has lent $20 billion for water-related projects in more than 100 countries. Projects support physical infrastructure as well as policy reform programs and coop- erative approaches to building institutional capacity for the management of water resources, from the local to the transnational level. The Bank’s Hydropower Business Plan (2008) foresees significant increases in hydropower development in many parts of the world, both for new facilities and for the rehabilitation and capacity upgrading of existing dam facilities. 36 Opportunities in Dam Planning and Management 9. There is also growing appreciation of the manifest linkages among water, environment, energy security, and climate change that require new channels for dialogue in developing infrastructure strategies that encompass both new dams and the rehabilitation and man- agement of existing dams. 10. Many reforms, complex or simple, involve behavioral change. The need is the same whether introducing water governance reforms, IWRM reforms, or anticorruption measures. Modern tools and approaches are indispensable. 11. Transparency International, Global Corruption Report 2008, http://www.transparency. org/publications/gcr/gcr_2008. 12. But this finding specifically excludes corruption risks in service provision. 13. Although the causes and impacts of corruption vary from country to country, corrup- tion in infrastructure is sometimes characterized as supply and demand–driven. Sup- ply represents the behavior of the “payer” or “supplier” and the reasons for his or her behavior. Demand describes the behavior of the “taker” or the “demander” and the reasons for his or her behavior. Either side can initiate a corrupt act. The supply side thus encompasses the domestic private sector involved in infrastructure, as well as international actors. TI’s Bribe Payers Index (BPI) ranks the propensity of private enterprises in particular countries to pay bribes. Instruments such as the OECD’s Con- vention on Combating Bribery of Foreign Public Officials are aimed at the interna- tional actors. However, TI has criticized OECD’s follow-up of the convention—apparently it has received only limited enforcement in at least two-thirds of OECD countries since it came into force in 1999. TI’s Corruption Perceptions Index (CPI) documents a country’s reputation for honest practice, and countries with an adverse rating appear to be high on demand-side corruption. 14. Some broader measures of reform that combat corruption are the following: • Ensuring that the basics of good governance are in place, such as the rule of law; participation, accountability, and definitions of basic legal rights, including access to defined public services standards; clear roles for the branches of government; and performance-based accountability. • Assessing service delivery performance as an important means of detecting corrup- tion—and one that is far more effective than performance audits. • Empowering citizens by supporting bottom-up reforms. • Disseminating information and rights to information. 15. This paper was widely circulated in 2006 and 2007 to private sector, government, and civil society representatives such as Transparency International for comment prior to its presentation at a meeting of the World Bank’s high-level Development Committee. Civil society and private sector feedback can be found at http://www.worldbank.org/gover nancefeedback. It is one basis for structuring the World Bank’s current GAC initiatives. 16. Reports on the GAC consultations are collected at http://go.worldbank.org/ DZQVU82PY0. 17. In the absence of national anticorruption initiatives that quantify the level of corrup- tion risk in the country, or any preexisting risk assessments in the sector, two indicator tools helpful at the project identification stage are Transparency International’s Bribe Payers’ Index, which ranks the propensity of private enterprises in particular countries to pay bribes, and TI’s Corruption Perception Index, which documents a country’s reputation on demand-side corruption. 18. Today, sustainable development is defined in legislation in most countries as it is in Vietnam: “Development that meets the needs of the present generation without compromising the ability of future generations to meet their own needs, on the basis of a close and harmonized combination of economic growth, assurance of Advocacy and Awareness Raising 37 social advancement and environmental protection”(Article 1, revised Law on Envi- ronment Protection, 2005). This law, which came into effect in July 2006, defines sustainable development for all sectors of the economy, including the power sector and hydropower. 19. This is illustrated in the Berg Water Project case study in appendix A—for example, larger outlets, variable-level intakes, and statutory monitoring. 20. Even though governance is synonymous with anticorruption at the World Bank, under the wider definition of governance (cohesive policies, processes, and decision rights) other gov- ernance reforms are integral to sustainable hydropower development and to managing the broader water resource implications of dams, including water governance reform, institu- tional reforms, and tariff reform, to name a few. IWRM is highlighted in figure 1.3 because the Bank–Netherlands Water Partnership Program mission is to improve water security by promoting innovative approaches to IWRM, thereby contributing to poverty reduction. 21. There is an impetus behind EFAs. As illustrated in chapter 3, alternative frameworks, approaches, and methods for environmental flow assessment now inform decisions as varied as regulatory assessment and licensing procedures for hydropower, basin stud- ies, design of outlet structures on dams, and the operating strategies of reservoirs that link the management policies of dams to the management strategies of downstream wetlands systems and water status indicators where statutory provisions require such. 22. In a 2000 report of the World Commission on Dams, Dams and Development: A New Framework for Decision-Making (http://dams.org), risks refer to the risks of all stake- holders in hydropower project development. The notion of risk extends beyond tradi- tional engineering, financial, and economic risk (e.g., voluntary risks taken by governments, developers, dam owners/operators, and financiers) to the involuntary risk absorbed by people affected by a project and the environment as a public good. As stakeholders in a hydropower development, project-affected communities face risks— to their rights as well as their access to resources, livelihoods, and welfare—that must be minimized. Their risk exposures also need to be managed, much like risk manage- ment for voluntary risk takers. The notion of risk in this application is further advanced in the paper “Rights, Risks and Responsibilities—Scoping Report: An Approach to Implementing Stakeholder Participation,” prepared in 2005 for the International Union for the Conservation of Nature (IUCN). 23. Various reports of the World Bank’s Development Committee on communication support for operations define these four areas of communication practice as follows: • Development communication. Exploring and assessing situations, building a wider consensus among stakeholders, and applying communication media and methods for change in order to enhance project effectiveness, governance, and sustainability. • Corporate communication. Using media and other methods to communicate, among other things, what the organization does, its code of ethics, and how it deals with questions of transparency; how the organization builds trust and public confidence to engage in dialogue on projects it undertakes; and how the organization will respond to the relevant governance reforms. The procedures, rules, and “communi- cation culture” of the agency or organization responsible for the policy planning initiative or project implementation fall in this category. • Advocacy communication. Communicating key issues effectively to raise awareness and to win support from the public or to influence relevant policy making. • Internal communication. Concerning oneself generically with communications within project teams, organizations, and the multi-entity governance structures involved in dam planning and management to ensure a timely and efficient exchange of information among the various teams, committees, units, departments, or staff. 38 Opportunities in Dam Planning and Management 24. This knowledge would also help to clarify what is expected from various project partners—in terms of communication activities and commitments—as part of the overall management of the project and of stakeholder expectations in an open and transparent manner. 25. Transparency International, Global Corruption Report 2008 (Berlin: Transparency International, 2008). 26. A single line is presented in terms of what is wanted by both parties, because there was virtually no difference between what stakeholders wanted and what government plan- ners wanted. 27. Good practices contain advice and guidance on policy implementation—for example, the history of the issue, the sectoral context, the analytical framework, and best practice examples. 2 How to Adopt Good Practice Five Key Messages on “How To” 1. The communication-based assessment (CBA) is the first opportunity to identify how communication might improve aspects of governance and sustainable performance and mitigate risks and to identify the advocacy actions needed to establish a consensus and the political will to integrate these aspects in the project design. 2. Benchmarking must be part of the preparation of the communication strategy and major communication products. Performance and pro- cess criteria can be used to benchmark against accepted good practice. Generic criteria are the following: (1) Have stakeholder expectations been measured and then managed? (2) Have the relevant stakeholder voices been empowered? (3) Has trust been built for functional partnerships? (4) Has value been added for different groups of stakeholders? (5) Have the tools for risk reduction—all forms of risk—been adequately advocated? 3. Communication strategies should be conceived as public documents, shared with or owned by stakeholders, who must be given an opportunity to provide inputs and comments. Typically, each major project activity and partnership group would have an overarching and detailed communication strategy. One cannot assume that the communication strategy on the last project will be the benchmark. 4. Communication strategies must be elaborated for each stage of the infrastructure project cycle: planning, implementation, and operation. In most cases, updated communication strategies are needed for several reasons: (1) issues and risks change between project stages; (2) stakeholders’ roles change; and (3) typically there is a long period of time between stages, because implementation can take several years. Similarly, the Development Assistance Committee (DAC) of the Organisation for Economic Co-operation and Development (OECD) advocates that communication strategies cover and be updated at each stage of the World Bank project cycle (a lending cycle). 5. Communication improvements must deliver value for money and value for stakeholders. Investments in project communication should be balanced against other project investments. Multistakeholder processes are the best way in which to inform judgments on the relative value that investments in communication add and how essential they are to all forms of risk management and meeting stakeholder expectations. 39 40 Opportunities in Dam Planning and Management Starting with a Communication-Based Assessment World Bank task managers have varying degrees of experience with modern communication theory and practice. How communication is handled within the Bank’s own growing portfolio of dam projects is shaped by a variety of contextual factors on a case-by-case basis: • Actions that the legislation and policies of client countries require in terms of information access, notification, and direct involvement of interested and affected parties in decisions about the design, implementation, and management of dams • Procedures, degree of commitment to public participation, and the “com- munication culture” of the public or private enterprise responsible for dam planning, implementation, and operation • Capacity of the media and civil society at the national and project levels and their experience in reporting on governance reforms and development issues associated with dam projects • Attitudes, procedures, and practices of institutional partners related to public communication and the partners’ behavior in partnerships • Collective pressure of interested and affected parties for two-way communica- tion and advocacy to enhance participation, transparency, and accountability • Past failures and deficiencies in project implementation directly attribut- able to poor communications. Often a particular project or context presents special communication needs. For example, a past controversy or historical grievances may define local atti- tudes toward the project—in postconflict settings often a postwar legacy of intercommunal strife or dislocation must be overcome. Good practice involves accounting systematically for all of these issues in the up-front communica- tion-based assessment. Box 2.1 describes what the traditional CBA typically seeks to achieve in dam projects. Box 2.1. What Is the Traditional Communication-Based Assessment (CBA)? A CBA is a family of techniques to assess a dam project’s local capacities, to gain insight into sociopolitical concerns and roadblocks, to understand percep- tions of risk, to probe fears and expectations, and to determine the knowledge level and perceptions of the media on the project and related issues. The purpose of the CBA is also to learn what partners and nongovernmen- tal organizations (NGOs) are doing in the same area and verify the availability and skills levels of national research and communication agencies. Finally, CBAs rely on qualitative and quantitative data to better understand the context of a dam project and to determine stakeholders’ perceptions, opinions, and beliefs. How to Adopt Good Practice 41 Table 2.1 is a simple checklist to illustrate the range of communication issues that may factor into different settings. Task managers can quickly assess whether the concerns are relevant to their project—the more checkmarks the greater the returns from investing in a proper communication-based assessment. Investing in a CBA is an investment in risk management. Contemporary risk management philosophy takes into account risks to stakeholder interests, whether it is risk of corruption or failure to meet stakeholders’ expectations in sustainable performance. Task managers begin by demonstrating a disposition to listening, respect for the stakeholders, and an interest in genuine engagement as development partners. Table 2.1. A Communication-Based Assessment: A Quick Checklist Does the dam project or initiative . . . Do institutional partners . . . ✓ have one or more controversial aspects that ✓ have corporate policies for prevention and need to be reconciled with stakeholders? detection of fraud and anticorruption, ✓ require innovation and new approaches to including codes of conduct? tackling governance and sustainability issues? ✓ have a track record on governance ✓ need to bring people and ideas together improvement and sustainable projects? across many different sectors, interests, or ✓ benchmark their communication, political jurisdictions? governance, and sustainability policies ✓ involve significant trade-offs between against accepted good practice? Routinely? economic, social, and environmental Never? performance, balancing competing rights? ✓ share the attitudes and culture of their partners important to communication? Does the policy environment . . . How communities view communication ✓ require linking dam decisions to policy ✓ Do local host communities want to be reform processes (e.g., water and electricity involved in decisions that affect them? Is governance, anticorruption reforms)? there significant resettlement? ✓ have requirements for public participation ✓ Do civil society and interested and affected processes and interested and affected party parties want to be involved in compliance involvement in the governance structures of and monitoring? the dam project? ✓ Do existing water users in the river basin ✓ require project authorities to ensure access want to be informed and consulted on to information on all project aspects? design and operation decisions? ✓ have governance and anticorruption reforms ✓ Do key project design and operation under way to link to or draw lessons from? decisions concern water management How does the country rate in terms of institutions and water user associations in corruption risk indicators? the basin? How do they confer and reach consensus? Advocacy is needed . . . Are there special communication needs . . . ✓ to include aspects of anticorruption in the ✓ to form and support the effective workings design of the project. of multistakeholder partnerships? ✓ to improve public participation and ✓ to facilitate conflict resolution on specific stakeholder information access. implementation or operation issues? ✓ to introduce new sustainability measures ✓ to enable the local and regional media to such as environmental flow assessment and function effectively? benefit sharing with local communities. ✓ to work in multiple languages and culturally ✓ to adopt any aspect of good practice the sensitive ways? World Bank promotes as a catalyst or model ✓ to build communication capacity with to advance for other dams in the basin. different water user groups and ✓ to advance any sort of advocacy products organizations, informing decisions on dam available and seek new products. building, design, and long-term management? 42 Opportunities in Dam Planning and Management One practical aspect is to link the different needs assessments conducted on dam projects. For example, the CBA must be linked to the social assessment conducted in the framework safeguard studies for the project, as well as to the corruption risk assessment (CRA) and others relating to the project’s sustain- able performance risk. These are some of the elements that encompass the broad definition of stakeholder-defined risk. Table 2.2 is a compilation of a generic list of “dos and don’ts” in assessing the project communication needs not only in project preparation but also along different stages of the project cycle. Applying Criteria to Benchmarking for Good Practice No formal standards for communication exist as yet for Bank-supported dam projects or, more generally, for dam planning and management. Until stan- dards are available, benchmarking against accepted good practice is a practical step that task managers can take to systematically identify and implement bet- ter or the best communication practices. Benchmarking is a widely accepted management tool to improve the per- formance of organizations, regardless of the field.1 It is a tangible commitment to the continual improvement of practice. On dam projects, it applies not only to communication but also to practice in governance, anticorruption, and sus- tainable performance.2 There is considerable methodological experience on which to draw. Many aca- demic and practitioner networks provide information on and tools to benchmark performance indicators and business processes against a variety of aspects such as social accountability, corporate governance, and anticorruption measures.3 How Is Benchmarking Communication Relevant? Benchmarking, which can be formal or informal, offers a structure for con- sidering improvements in communication practices in a collaborative way. Benchmarking communication practices on dam projects specifically helps task managers do the following: • Obtain value-added feedback from stakeholders, triggered by giving people the opportunity to see and to learn firsthand how other dam projects and stakeholder groups respond to communication challenges • Better judge the value of the incremental investments that communication offers, thereby reconciling investments in communication with other calls on project budgets • Firm up the business case for improvements in communication and, by extension, support improvements in governance and sustainability. What Is the Best Approach? On Bank-supported projects, the communication specialist would routinely add a benchmarking section to the main communication management How to Adopt Good Practice 43 Table 2.2. Some Dos and Don’ts in Starting a Communication-Based Assessment (CBA) Don’t do this Do this ✂ Don’t assume at the planning stage that all ✓ Do undertake a communication-based stakeholders understand how the dam assessment, giving due emphasis to project will affect them. governance and sustainability improvement ✂ Don’t assume it is “least cost” or a good risk opportunities along the project cycle. avoidance strategy to keep a “low profile” ✓ Do ensure that the terms of reference and deal with problems if and when they for the CBA reflect governance and arise, using crisis communication. sustainability improvements, and do ✂ Don’t forget to assess the scope for involve the task team appropriately in advocacy activities to influence thinking and discussion of the CBA scope. decisions positively to drive improvements ✓ Do ensure that the CBA covers the in governance and sustainability. requirements for public participation, routine ✂ Don’t forget about advocacy for other good information flow, and the communication practice elements promoted by the World needs of partnerships for project Bank and implicit in the government policy implementation and operation. framework but not yet in practice. ✓ Do cover all aspects of advocacy, ✂ Don’t forget communication between the internal communication, and corporate contractor and contract workforce. This communication—also with institutional workforce is often the main contact with partners. the local community, and this relationship ✓ Do ask communication specialists to involves many social sustainability issues. benchmark the CBA and the needs it ✂ Don’t forget about support for the identifies against emerging national and communication capacity of major regional good practice and with other dam stakeholder interests and partnerships, projects in the Bank’s portfolio. especially empowering local action to ✓ Do discuss the draft CBA with improve the overall effectiveness of project multistakeholder groups in the project development. governance structure with an open mind to solicit their feedback and suggestions for improvement. ✓ Do use the CBA as a first building block to create a culture of communication on the project and to build stakeholder confidence and good faith in the implementing agency. reports—for example, initially it would be part of the CBA, then the draft communication strategy, and eventually the evaluation phase report. The benchmarking framework would be discussed openly with stakeholders at an early stage. The following five generic, crosscutting criteria form a simple framework to benchmark communication practices for improvements in governance and sustainability: 1. Have stakeholder expectations been measured and then managed? 2. Have the relevant stakeholder voices been empowered? 3. Has trust been built for functional partnerships? 4. Has value been added for different groups of stakeholders? 5. Have the tools for risk reduction and benefit enhancement been adequately advocated? Good practices that respond to each of these criteria can be identified. 44 Opportunities in Dam Planning and Management How Are the Generic Criteria Applied? These or any other criteria can be systematically incorporated into the four- phase development communication methodology. As illustrated in figure 2.1, the process used to benchmark the communication strategy takes into account the relevant good practice, alongside the standard questions and CBA analysis used to formulate the project communication strategy.4 The dimensions of improvements in governance and sustainability receive explicit attention. The complexity depends on the situation. Two-way communication with stakeholders will reveal their perspectives on good practice that adds value. The communication strategy can then be modified to reflect stakeholders’ views. With allocation of time and resources, task managers can establish a small group, facilitated by the communication specialist, to answer the key question, “What needs to be benchmarked?” This group then helps to identify which aspects of a project should be emphasized in benchmarking reports that all stakeholder representatives would review collectively.5 A communication subgroup could undertake this task, or a “benchmarking team” composed of interested members drawn from a multistakeholder body already attached to the project. The team could be an existing stakeholder con- sultative committee or an environmental monitoring committee, such as the environmental monitoring committee (EMC) established for the Berg Water Project and now required for all water projects in South Africa, as described in appendix A. On dam projects it is important, at a minimum, to benchmark the following: • Communication-based assessment—scope, detail, and orientation • Communication strategy and action plan—all relevant aspects • Indicators of improvement in performance over time—related to the five generic criteria offered in this handbook and others deemed appropriate • The approach to ensure independent evaluation of the communication function and self-evaluation as appropriate • Engagement with the international, national, and local media • Communication mechanisms at all levels within major partner institutions and interested and affected partners at the grassroots level. Another aspect of good practice is how project governance structures and institutional arrangements help or hinder flexibility. This aspect includes practices to create rapid responses to communication challenges, to ensure messages are not overly complex, and to set out clear lines of responsibility and accountability for communication messages and context. The establishment of communication protocols should be considered. These protocols can ensure clarity on the communication roles of the actors in public participation processes (PPPs) and of individual institutional partners in key project partnerships. Communication protocols can clarify (1) issues such as responsibility for dealing with the media and on what issues and (2) the Figure 2.1. Benchmarking Communication Strategies within the Four-Phase Development Communication Process Governance dimensions Sustainability dimensions Start of process performance aspect Social performance Other reforms, etc. Water governance Anticorruption Environmental performance Economic aspect aspect Analysis (CBA) CBA questions and analysis to scope and formulate project communication strategies Monitoring Communication and Four phases strategy What are the communication ✓ ✓ ✓ ✓ ✓ ✓ evaluation design needs and objectives? Which audiences need to be ✓ ✓ ✓ ✓ ✓ ✓ reached by the communication Communication program component? implementation What behavioral changes are ✓ ✓ ✓ ✓ ✓ ✓ sought, what expectations are to be met, etc. What messages are appropriate? ✓ ✓ ✓ ✓ ✓ ✓ Which channels of communication ✓ ✓ ✓ ✓ ✓ ✓ and mechanisms are most effective? How to Adopt Good Practice How will the communication, ✓ ✓ ✓ ✓ ✓ ✓ Benchmark expectations, and behavioral change process be monitored and evaluated? Selected good practice examples from other projects plus generic benchmarking criteria Project communication ✓ Understand and manage expectations ✓ Add value for all stakeholders strategy ✓ Empower all voices ✓ Advocate tools for risk reduction 45 ✓ Build trust for partnerships Source: Lawrence J. M. Haas. 46 Opportunities in Dam Planning and Management responsibilities of individual stakeholders to faithfully represent the views of the constituencies represented. The following sections describe how each of the five generic criteria is rel- evant to benchmarking good practice communication consistently. Each crite- rion is placed in the context of the Berg Water Project (BWP) and the Lesotho Highlands Water Project (LHWP). The overall section concludes with a list in table 2.3 of dos and don’ts on benchmarking good practice communication for dam projects. Criterion 1: Measuring and Then Managing Stakeholder Expectations Failure to adequately measure and then to manage stakeholder expectations is a common misstep on projects. Managing expectations is not a cynical act of manipulation. Rather, it represents understanding what all stakeholders expect of a project and what they fear to lose, and then managing the risks people perceive as important. It also means not overpromising to deliver ben- efits and then failing to deliver. Controversy is fueled when the expectations of one or more stakeholders is not recognized from the start, or is not accommodated in the project design, or is simply not viewed as “important” in the scheme of things as the project proceeds. For partnerships to work, people must feel their expectations can be met or at least understood. This factor applies to all levels of partnership on dam projects and to all topics, ranging from collaboration on preventing and detecting corruption or revenue-sharing arrangements to enhancement of social sustainability during dam operation. Dialogue mechanisms that enable stakeholders to better understand each other’s views and expectations must be present. These mechanisms facilitate “good faith” negotiations when they are needed. Project authorities must listen and be proactive. Communication-based assessment tools gather information about stake- holders’ knowledge, perceptions, and attitudes. These tools help practitioners understand expectations. And they equip task managers with “radar” to iden- tify potential problems early and manage them better. Box 2.2 highlights how important measuring and managing expectations was to community acceptance and perception of outcomes on the BWP and LHWP.6 Criterion 2: Empowering Relevant Voices This criterion reflects thinking that few people contest. Success in enhancing governance and sustainability hinges on effective coalitions of the govern- ment, private sector, civil society actors, and people affected by projects. These coalitions not only advocate appropriate measures but also define and imple- ment them contextually. It is widely accepted that giving people a voice in the development decisions that affect them is just and equitable. It also makes practical sense on several levels: How to Adopt Good Practice 47 Box 2.2. The Multiple Expectations Associated with Dam Projects Berg Water Project. Within the host community in Franschhoek, South Africa, there were vastly divergent expectations of the project. Affluent and influential groups in the community wanted to minimize the adverse impacts on heritage, tourism, and the local environment. The poor and once eco- nomically marginalized groups in the community saw the effort as a public works project that would provide jobs during construction and operation. Accounting for all stakeholder expectations was fundamental to gaining public acceptance and to finalizing the project’s components and communication support. Among the innovative measures emerging from the dialogue with stakeholders was the “Franschhoek First” policy of maximizing local employ- ment and the economic spin-off during construction. This spin-off included a housing trust for the longer term, capitalized with money from the sale of construction phase housing. Lesotho Highlands Water Project. Project proponents in both Lesotho and South Africa had expectations about the distribution of the benefits from binational cooperation. These expectations were captured in the original project treaty negotiated in 1988. In 1998 the treaty’s terms were amended to reflect mutual agreement on the changed political conditions. Expecta- tions in the traditional Highland communities had evolved over time. Annual stakeholder conferences are now held with local communities and project management. Prior to these conferences, all stakeholders rate project per- formance on issues related to social and environmental sustainability (Bal- anced Score Card) to measure whether individual expectations are being met. Management must respond. • Two-way channels of communication are essential to providing stakeholders with genuine opportunities (1) to contribute expert and local knowledge to improving the development performance of dam projects, and (2) to partici- pate in a meaningful way in multistakeholder partnerships. • These partnerships raise many questions about the optimal development and management of dams. To some extent, trade-offs on different aspects of sustainable performance are negotiated, if not resolved. Decision author- ities at all levels are better informed to make trade-offs when voices are empowered. • Most governance and anticorruption measures at the sector and project level require active engagement with legitimate NGOs and civil society organizations (CSOs) and feedback from the consumers of services. • Inclusive approaches and partnerships require legitimate representation (e.g., spokespersons nominated by each interest group) and enlistment of trusted public opinion leaders, if necessary. Fundamentally, a set of rules and a framework are needed to empower the relevant voices in order to nurture and develop the appropriate communication capacity. 48 Opportunities in Dam Planning and Management Box 2.3. Using Rules and Dialogue in the Project Governance Structure to Empower Relevant Voices Berg Water Project. A multistakeholder environment monitoring commit- tee was the primary step in formalizing the voice of interested and affected parties in the BWP governance arrangement. The environmental monitoring committee (EMC) had an independent chairperson. Its 20-person member- ship consisted of representatives of the project authority, local and provincial government bodies, and various interested and affected party groups that included previously disadvantaged communities, ratepayers, and commercial interests in Franschhoek’s tourist trade, as well as downstream water user interests (such as irrigation boards in the process of converting to multiuser associations), farmers groups, industries, and conservation and recreational groups. Each constituency elected representatives to the EMC, which then formed seven subgroups for specific functions. One subgroup was respon- sible for developing a communication protocol that all EMC members en- dorsed (see appendix A). Lesotho Highlands Water Project. The governance structure of the LHWP included the Lesotho Highland Commission (LHC), which provided politi- cal oversight of the Lesotho Highlands Development Authority (LHDA). Five members of the commission were appointed to speak for the interests of the respective governments. Although the LHDA has a hierarchy of community representatives and processes for ongoing dialogue with local communities, the Office of the Lesotho National Ombudsman also backstops these pro- cesses and enforces the “rules of good faith engagement.” The ombudsman is empowered to intervene and arbitrate disputes between local communities and the LHDA and does so often (see appendix B). Box 2.3 describes the material steps used by the BWP and LHWP to empower relevant voices and how this empowerment was accommodated in project governance structures to benchmark progress. Criterion 3: Building Trust for Functional Partnerships Trust is one of the most essential ingredients of successful partnerships. Part- nerships are both a catalyst and vehicle for the cooperation needed to optimize the development performance of dam projects. From a communication stand- point, neither general information nor targeted messages are absorbed if stakeholders do not trust the source or their partners.7 Many factors go into creating trust among stakeholders in dam projects: transparency, commitment to participation, culturally appropriate communi- cation and feedback, and written commitments that can be verified and upheld. When projects have a conflicted history, steps must be taken to address legacy issues. How to Adopt Good Practice 49 Experience shows that trust does not come automatically; it has to be earned. Trust is dynamic not static, and, once lost, it can be very difficult to recover. In multistakeholder partnerships, trust is key to creating the space for agreement on sharing costs and benefits (within the policy framework and regulation) and on pursuing adaptive management of dams. Trust between riparian states is centrally important for mutually beneficial cooperation on international rivers. Task managers also need to ascertain the level of public trust in govern- ment agencies, as well as in the public or private sector entities that imple- ment dam projects and the regulators who may step in when unforeseen events occur. Establishing a policy of clear two-way communication from the start is essential to creating, building, and maintaining trust—not only stakeholders’ trust in authorities to act in “good faith” but also their trust in the mechanisms to reconcile stakeholder interests. Criterion 4: Adding Value for Different Groups of Stakeholders This criterion focuses on two aspects of adding stakeholder value through communication. First, any investment in communication must yield value for the money spent—that is, steps must be taken to maximize the impact of any communication activities. Second, communication must underpin inclusive decision making on dam design, delivery, and performance to ensure that they add value for different groups of stakeholders, not just some. Sharing benefits must be equitable and perceived as such. Value is also linked to the notion of doing more for less—that is, delivering services through sustainable infrastructure while minimizing costs. This approach includes guarding against corruption-related cost escalations and understanding the range of values that governments and stakeholders attach to different sustainability outcomes.8 More fundamentally, value is about viewing dams as a development inter- vention, as a catalyst for poverty reduction and local and regional develop- ment, and not just as a way to optimize physical assets for water and energy service delivery. Communication strategies should be aimed squarely at deliv- ering on stakeholder expectations. In most developing countries, attention to value added is critical for host communities and affected river users, who typically live in remote rural set- tings. This is value as they perceive and define it—that is, an addition to the value added for the primary beneficiaries of water and energy services who typically reside in towns and urban centers. Box 2.4 describes how communication investments in the BWP and LHWP were geared toward adding stakeholder value at all stages of the project cycle, both in extending the definition of value and in recognizing all stakeholders. 50 Opportunities in Dam Planning and Management Box 2.4. Using Communication to Create Stakeholder Value at All Project Stages Berg Water Project. Communication was central to involving the basin com- munities in BWP decisions at all stages. Media coverage of public participa- tion in the strategic demand-supply reconciliation studies and project-level environmental impact assessment provided political legitimacy for the government decision to advance the project—conditional on a 10 percent reduction in water demand. Public communication was important to explaining the water tariff increase in Cape Town when the Berg Water Capital Charge (BWCC) was introduced. Specifically, it explained the link between tariff measures for water demand management and the equity in the application of the tariff increases. Corporate sustainability reporting by the Trans-Caledon Tunnel Authority, the BWP implementing agency, was central to raising con- cessionary financing. Favorable credit ratings brought both lower water tariffs and value for all stakeholders. Lesotho Highlands Water Project. Communication was a very small com- ponent of the project budget in Phase IA of the LHWP, starting in 1991 with construction of the Katse and Muela Dams and power and water transfer facilities. By 2008 communication and public stakeholder consultation activities for Phase II accounted for more than a third of the feasibility stage budget. Lessons from Phases IA and IB revealed that many factors hinged on effective communication, including the political legitimacy of decisions, community ac- ceptance of the project and understanding of how it stood to gain, external perceptions of the project, and assurances to investors that measures for governance and anticorruption were in place to prevent, detect, and avoid a replay of the well-publicized corruption problems in Phase IA. Criterion 5: Advocating Forms of Risk Reduction Communication must support the identification and management of differ- ent forms of risk, with risk defined in an encompassing way, not narrowly. Communication can support a more holistic approach to risk assessment and management, starting with a dialogue platform from which stakeholders can inform decisions on risks, and communication activities to enable stakehold- ers to help manage risks. In practice, communication means ensuring that the risk exposures important to stakeholder constituencies are identified, properly assessed, and reasonably addressed from the outset of project preparation. Accurate identification of stakeholder expectations leads to greater accountability for risk management and better use of partnerships to manage the variety of risks. How to Adopt Good Practice 51 Box 2.5. Tools for All Forms of Risk Reduction Berg Water Project. The multistakeholder environment monitoring com- mittee was a de facto “integrated risk assessment” platform for the BWP. Members transparently identified the risks their constituencies perceived as the most important, informed decisions on how to manage them, and agreed on stakeholder roles. As the implementing and operating agency, the Trans- Caledon Tunnel Authority (TCTA) also formally linked its corporate gover- nance, risk management, and compliance objectives to the project funding and implementation philosophy: “Respond to all types of risk in all parts of the organization and business.” The TCTA routinely benchmarked its corpo- rate risk management practices, including anticorruption measures, against generally accepted risk management “best practice.” One key benchmark used by the TCTA during the BWP implementation phase was the 2002 report by the King Committee on Corporate Governance (the King II Report).10 Lesotho Highlands Water Project. In Phase IB of the project, the LHDA introduced a program of environment flow assessment and provision into the management of releases from the Katse Dam. This approach recognized the risks to the livelihoods of the traditional river users downstream. The program incorporated compensation, which is to be reassessed after 10 years. The well- publicized prosecutions and disbarment of international firms during Phase IA activities were another crucial part of the overall risk management approach. Important on this list are the risks that only local communities face. As local partners and risk absorbers, their voices are critical to project sustainability, taking into account “recognition of rights” and “assessment of rights at risk.” It is a matter of focusing not just on the voluntary risk takers such as contractors, owners, and financing agencies but also on communities.9 Communication activities must facilitate participation in risk assessments across a range of topics, from livelihood risks that relate to social sustainability, to environmental risks, to risk assessment for emergency preparedness pro- grams. Meanwhile, those in charge of these activities must develop strategies to make risks transparent and understood. Risk to what is often called an organization’s primary intangible asset— reputation—is also related to the risk of corruption. In major water projects, reputation is a vital concern for all parties and partners: developers, contrac- tors, and financing institutions, as well as for the CSOs and NGOs that par- ticipate in dam projects. Box 2.5 describes how important expanded thinking on risk management was to the project outcomes of the BWP and LHWP. 52 Opportunities in Dam Planning and Management Table 2.3. Some Dos and Don’ts on Benchmarking Good Practice Communication on Dam Projects Don’t do this Do this ✂ Don’t assume that benchmarking is another ✓ Do use benchmarking at the outset of the 1990s management fad well past its “sell by” communication-based assessment and draft date. communication strategy. ✂ Don’t assume that benchmarking applies ✓ Do use the five-criteria framework offered in only to business processes. this handbook, supplemented by any other ✂ Don’t forget to look for communication criteria proposed by the communication practices in the country and region that may specialist—be comprehensive. be relevant to benchmarking. ✓ Do involve the task team in the ✂ Don’t forget to check whether other good benchmarking exercise from the outset; practice topics that the World Bank present benchmarking as a stimulant for promotes in its own dam portfolio are innovative thinking, not as a compliance tool. relevant to the current project. ✓ Do provide an adequate opportunity to ✂ Don’t forget about benchmarking advocacy discuss the proposed benchmarking communication steps, such as incorporating framework at a meeting of stakeholder governance and anticorruption measures in representatives at an early stage. Be open to dam projects. stakeholders’ suggestions. ✂ Don’t forget to benchmark the ✓ Do put the results of benchmarking to good communication support required for use—for example, to refine a needs governance and sustainability tools. assessment or communication strategy. ✂ Don’t forget about involving partners in ✓ Do consider benchmarking for corruption benchmarking processes from the start and risk assessments and governance sharing benchmarking results more widely improvement plans and activities. with stakeholders. ✓ Do consider benchmarking for new ✂ Don’t restrict benchmarking to sustainability themes, especially local benefit communication alone; benchmarking should sharing and environmental flow assessment be applied to aspects of governance and and provision. sustainability improvement. ✂ Don’t forget that benchmarking is a continual process and a commitment to continual improvement. It should be updated formally on a periodic basis. Formulating Comprehensive Communication Strategies A project’s communication strategy Analysis (CBA) is the central document in manag- ing the communication function on Monitoring Communication and Four phases strategy dam projects. On Bank-supported evaluation design projects, the strategy is produced in the second stage of the four-phase Communication program implementation development communication pro- cess depicted here. Because dam projects incorporate many separate activities that concern differ- ent groups of stakeholders, a concise overarching communication strategy is typi- cally prepared. This strategy links to the main project objectives and major expec- tations of stakeholders. It also provides key messages about project implementation. Supporting this overarching strategy is a hierarchy or series of detailed communication plans for each significant project activity. Figure 2.2 illustrates How to Adopt Good Practice 53 Figure 2.2. Plans and Subplans of Dam Projects That Need a Communication Strategy Activities or plans that need a communication strategy Communication- Communication strategy • Land acquisition, compensation, based for sustainability and rehabilitation assessment enhancement elements • Environmental flows of dam project • Procurement • Corruption risk assessment • Governance improvement • Resettlement • Labor and skills • Environment mitigation and Communication monitoring support for various project • Public health and safety activities and plans • Watershed management • Fisheries mitigation and enhancement • Restoration and revegetation • Community interaction • Water users association Communication strategy • Institutional capacity development Overarching project for governance and • Sustainable utilization and communication anticorruption elements reservoir management strategy of dam project • Sediment management • Dam safety management • Emergency preparedness • Benefit-sharing arrangements Source: Lawrence J. M. Haas. the range and types of activities that require supporting communication strat- egies and components on dam projects. For the governance dimension, a corruption risk assessment engages stakeholders in a collaborative way. This engagement requires a communica- tion strategy starting with a CBA analysis to identify parties for the risk assessment, their manner of involvement, and the key messages to deliver to policy makers and different stakeholder interests. The communication strat- egy should include: • An advocacy component that seeks, where needed, to remove the stigma of talking about corruption • Awareness raising of corruption impacts, showing clearly the common interest in combating corruption (see table 1.7 in chapter 1). • An effort to seek consensus on a framework of measures to prevent and detect corruption and to outline stakeholder roles for implementation. What Makes a Communication Strategy Comprehensive? Three steps in the process of formulating a communication strategy help task managers ensure that the strategy is sufficiently comprehensive and flexible: 1. Reflect in the strategy all dimensions of modern communication practice contextually: development communication, internal communication, corporate communication, and advocacy communication. 54 Opportunities in Dam Planning and Management Twenty years ago, the World Bank did not talk about corruption. The staff called it the c-word, our shareholders and Board said it was too political, and we self-censored it out of our documents. Today fighting corruption is a key part of World Bank projects and programs. Our shareholders know corruption is a drag on economies, taxes the poor, and strangles opportunity. An empowered public is the foundation for a stronger society, more effec- tive government, and a more successful state. —Robert B. Zoellick, President, The World Bank Group address, the Peterson Institute for International Economics, April 6, 2011 2. Prepare the strategy openly and inclusively with ownership by stakehold- ers, because genuine involvement will ensure a sufficiently comprehen- sive, relevant, and value-added plan. 3. Prepare a new or updated project communication strategy to start each new phase of the infrastructure project cycle (i.e., while moving from planning and design to implementation and operation) to make improve- ments as the cycle progresses. How Are These Steps Reflected in Practice? In the Berg Water Project in South Africa, the Department of Water Affairs and Forestry (DWAF) was responsible for the communication strategy during the strategic planning, project identification, and approval stages of the BWP. During that period, the DWAF comprehensively expanded the communica- tion strategy for the strategic demand-supply reconciliation studies and proj- ect environmental impact assessment (EIA) to reflect new water legislation and the “co-operative governance” model embodied in the constitution (1996). Once construction was authorized, the TCTA assumed responsibility for developing the communication strategy for the implementation stage. It did this in cooperation with its major institutional partners, DWAF and the City of Cape Town, and residents of the Berg River basin. Box 2.6 describes the three interrelated streams of the implementation phase communication that the TCTA prepared in 2003. The public participation process stream formed during the approval stage reflected statutory requirements to involve stakeholders in issues vital to main- taining public support. This involvement included government commitments to linking decisions on the physical design and operation of the project to the Berg River Catchment Management Strategy and Environmental Reserve Determination for the river system. The PPP communication strategy was also benchmarked against the DWAF’s Generic Public Participation Guidelines (containing 16 principles) and the recommendations of the World Commission on Dams on stakeholder involvement.11 As custodian and facilitator of open dialogue processes, the PPP communication stream consolidated the role of the implementing agen- How to Adopt Good Practice 55 Box 2.6. Communication Strategy: Three Streams for the BWP Implementation Phase Public participation process (PPP). Facilitates communications integral to stakeholder engagement in ongoing decisions about design and implementa- tion of the project, largely organized around the environmental management plan and social aspects. Environmental monitoring committee (EMC). Facilitates functioning of the multistakeholder EMC as a cooperative governance mechanism and as a two- way dialogue between EMC members and their constituencies. Project communication. Disseminates timely, accurate information on project components, status, and implementation issues to the public and stakeholder interests via newsletters, media, and various channels. cies in managing relations with various public, civil society, and private sector interests. The EMC communication stream was precedent-setting for South Africa. It enabled the multistakeholder EMC to have a legally recognized, collective voice and capacity for independent public and media communications. With its substantive communication protocol, the EMC formulated its communication strategy around the environmental monitoring and manage- ment plan and social sustainability components of the project. Consistent Messages as Part of a Comprehensive Strategy Consistent information and messages from the major institutional partners are important. The BWP placed great importance on this goal because of the complex approval history and range of interests arrayed around implementa- tion and operation decisions. The TCTA’s role was accepted as the “first among equals” in coordinating government communication on the project but not to the point where the coordination biased outcomes. The TCTA developed a protocol to which the other main institutional part- ners agreed. The terms of the agreement captured in the communication strat- egy included the following: • Partners convey consistent core messages to the public and their respective stakeholders. The main message was that the Berg Water Project was an effec- tive partnership between TCTA, DWAF, and CCT that delivered on its prom- ises: a high-quality water supply project, associated social development, ongoing demand management, as well as integrated water resource management. • Partners adapt core messages to various audiences, including information about delays, problems, and failures. • Partners participate in public announcements through the media, advertise- ments of major events, sponsorships of surveys, participation in national campaigns, or any other public communication process deemed beneficial. 56 Opportunities in Dam Planning and Management Table 2.4. Some Dos and Don’ts in Formulating a Comprehensive Communication Strategy Don’t do this Do this ✂ Don’t assume the communication specialist ✓ Do base the communication strategy on a can produce the project communication baseline assessment and a strong analysis to strategy in isolation. deliver project objectives and stakeholder ✂ Don’t forget to benchmark the value. comprehensiveness of the communication ✓ Do prepare a concise overall project strategy and use the results in developing communication strategy and ensure that further strategy. each governance and sustainability aspect ✂ Don’t forget that ideally each major project has a clear plan with the appropriate detail. partnership needs a communication strategy ✓ Do ensure that multistakeholder bodies can and a protocol for member communication. contribute to the communication strategy ✂ Don’t assume that engagement of the media and take their comments into account. can be avoided and that a clear strategy and ✓ Do align the project communication strategy messages for the media are unnecessary. with the corporate communication strategies ✂ Don’t forget to include communication of the implementing agency and major capacity building in the communication institutional partners. strategy. ✓ Do link communication objectives to the ✂ Don’t forget to include communication with objectives of the project and broader sector the construction workforce in the strategy. policy on governance and sustainability ✂ Don’t forget to formulate a new improvement. communication strategy for the start of ✓ Do prepare communication strategies and each stage of the infrastructure project communication activity plans for all cycle. multistakeholder bodies on the project. ✂ Don’t forget to update the project Web site ✓ Do consider communication protocols for monthly at a minimum with postings such as the major institutional partners so they the minutes of key partnership meetings. disseminate clear and consistent information and messages to all. ✓ Do establish a project Web site for national and external stakeholders, and do put the communication strategy on the Web site. • Although some divergence in conveying messages could (and did) occur, in the event of a crisis a crisis communication plan would be drafted and managed by the TCTA. In addition, the communication strategy had to complement communica- tion for other key sector programs. Important in this sense was (1) vertical integration with the sector communication strategy to implement policy and institutional reforms in water resource management and water service deliv- ery and (2) horizontal integration with the communication strategies of other water programs and projects connected to BWP performance, such as the downstream water quality management programs. Corporate Communication as Part of a Comprehensive Strategy The corporate communication strategies of private companies and public enter- prises are relevant to implementing dam projects, particularly in terms of feeding accurate and timely information to stakeholders and the media. In South Africa, relevance was illustrated by the TCTA linking the BWP project communication to its own corporate communication strategy through information and messages conveyed to shareholders via its Web site, media statements, and annual report. How to Adopt Good Practice 57 The TCTA’s corporate communication strategy promoted (1) its mandate within the countrywide reorganization of water service delivery to implement bulk water supply projects that conformed to international principles for sus- tainable infrastructure development and management, while recovering capi- tal and operating costs from tariffs; (2) the alignment of the bulk water supply business with the relevant public policy, including cooperative governance, access to information, and black empowerment; and (3) its emphasis on cor- porate social responsibility, anticorruption, and the philosophy of implement- ing water projects in partnership arrangements.12 Multiple Objectives from Key Messages to Advocacy To be fully comprehensive, communications strategies must support innova- tion and leadership to develop practices on a range of issues: • Demystifying the media process so the media are an opportunity rather than a threat. Demystification means taking steps to overcome the wariness of many practitioners to engage the media and to build good relations with key audiences through the media. • Mobilizing stakeholder support for advocacy positions on governance and sustainability improvements that carry weight and have political relevance. • Supporting functional partnerships, ensuring adequate representation and a level playing field, appointing designated spokespersons, controlling rumors, and ensuring that communication vital to partners is timely, open, and accurate. Table 2.4 is a list of dos and don’ts on formulating a comprehensive com- munication strategy for dam projects. Improving Communication along the Project Cycle This section explains what improving communication along the project cycle means on Bank-supported dam projects, and it offers practical “how-to” ideas for task managers.13 Two project cycles are of concern to practitioners, the World Bank project cycle and the infrastructure project cycle. World Bank Project Cycle This cycle, illustrated in figure 2.3, is similar to the project cycle that other international public institutions use for investment and development policy lending, with the possible exception of the macro planning stages. This hand- book simplifies the Bank project cycle into four stages: 1. Macro planning—that is, a country assistance strategy (CAS) and poverty reduction strategy paper (PRSP)—and project identification 2. Project preparation (combining preparation, appraisal, negotiation, and approval) 58 Opportunities in Dam Planning and Management Figure 2.3. World Bank Project Cycle for Investment Lending 8. Evaluation 1. Country assistance strategy The Bank’s independent Operations Evaluation The Bank prepares lending and advisory services, Department prepares and audit report and based on the selectivity framework and areas of evaluates the project. Analysis is used for comparative advantage, targeted to country future project design. Co poverty reduction efforts. ass unty 7. Implementation and ista n stra nce 2. Identification tio tegy completion lua Projects are identified The Implementation Eva that support strategies Completion Report is and that are financially, Ide prepared to evaluate plet n economically, socially, ion nti tio the performance of and environmentally fic and menta both the Bank and ati sound. Development the borrower. com on strategies are analyzed. le The Imp 6. Implementation and supervision 3. Preparation Project The Bank provides The Borrower tion implements the Cycle policy and project Im su an advice along with para project. The Bank ple pe d ensures that the loan financial assistance. me rvis Pre proceeds are used for Clients conduct studies nta ion the loan purposes with and prepare final projects tio documentation. n due regard for economy, efficiency, and effectiveness. Neg l ot sa and iations prai 4. Appraisal 5. Negotiations and b app oard Ap The Bank assesses the board approval rova economic, technical, institutional, The Bank and borrower agree on l financial, environmental, and social aspects loan or credit agreement and the project is of the project. The project appraisal document presented to the board for approval. and draft legal documents are prepared. Source: World Bank. 3. Project implementation (implementation and supervision) 4. Project evaluation (combining implementation, completion, and evaluation). The time pressures that task managers face in the project preparation and appraisal phases are a key consideration in “what is feasible” to improve practice relative to other stages of the project cycle. Part of the solution is creative consid- eration of how to deliver continual improvements in practices along the project cycle without simply loading more tasks into project preparation. The Infrastructure Project Cycle Non-Bank practitioners are more familiar with the infrastructure project cycle. The four main stages are illustrated in figure 2.4. Dam rehabilitation is highlighted as part of the operation stage because many dam projects in the World Bank portfolio involve rehabilitation, uprating, or modification of res- ervoir operations to conform to reforms for integrated water resource man- agement (IWRM). Consideration of both the Bank and infrastructure project cycles helps to define the best entry point to improve communication, governance, and sus- tainability practices contextually. In fact, there are multiple entry points, rec- ognizing that Bank projects typically have three components: the first to sup- port sector policy and regulatory improvements, the second for investment in hard infrastructure, and the third for capacity building. How to Adopt Good Practice 59 Figure 2.4. Communication and the Infrastructure Project Cycle for Dam Projects Decision Points Which project(s)? 1 Key Strategic planning Multiple 1 Design? Finance? 2 Project preparation 4-step DevComm methodology 2 Multiple decisions Analysis (CBA) Project implementation Monitoring Communication Communication and Four phases strategy strategies evaluation design 3 At each stage of R&U Operational the project cycle 3 Communication program implementation Project operation 4 5 Source: Lawrence J. M. Haas. The communication strategy must inform key decisions at each stage of the project cycle, providing the relevant communication analysis and implemen- tation of the communication program to underpin public participation and stakeholder involvement in the most important decisions at each stage.14 Good practice today involves preparing a new communication strategy to move from one stage of the infrastructure project cycle to the next, using the four-phase development communication methodology depicted in figure 2.4. Why? • Actors change. Institutional actors frequently change between stages. If all do not change, many institutional actors and stakeholders will perform dif- ferent roles. • Risks and issues change. Issues, risks, and stakeholder expectations change between stages, reflecting the nature of activities. • The policy environment evolves. Time frames for dam projects are long: the implementation phase can span several years or more. Over this period, those in charge must take into account policy transformations, look afresh at opportunities for governance improvement, and rebalance expectations with social, environment, and economic performances. Clearly, the communication strategy is built and adapted from one stage to the next. The case studies in appendixes A and B demonstrate this progression clearly. The evolution of practice reinforces the need to build communication capacity within the implementation and operation agencies, the capacity for communication in multistakeholder partnerships that serve affected people in decision making, and especially the capacity and skills of the in-country communication specialists attached to the project who facilitate, assist, and train others in communication. On Bank-supported projects that have a 60 Opportunities in Dam Planning and Management wider development remit, the role and capacity of the local media to report on advances in governance and sustainability should be assessed. The OECD’s Development Assistance Committee (DAC) summed up the needs when in 2006 it called on communication and infrastructure practition- ers to collaborate “to develop an effective communication strategy that covers all phases of the project” to advance “noteworthy achievements in quality, cost-effectiveness, and sustainability, as well as any incidents of alleged collu- sion, fraud, or corruption.” The World Bank Project Cycle for Investment Lending This section looks at how interventions and products that reinforce communi- cation, governance, and sustainability for dam projects map onto the Bank proj- ect cycle. It suggests the steps that task managers can consider in encouraging this three-way synergy. Chapter 3 provides more details on the specific tools. Mapping Interventions and Products Along the Bank Project Cycle Figure 2.5 illustrates how interventions and products in the four-stage devel- opment communication methodology map onto the Bank project cycle.15 What does such an approach mean for task managers of Bank dam proj- ects? They recognize the following: • More emphasis can and should be placed on macro- and sector-level com- munication analysis (a CBA) where policy formulation, strategic planning, and project identification take place. Figure 2.5. Mapping of Development Communication Interventions and Products along the Bank Project Cycle CAS and Identification Preparation Appraisal Approval Implementation Evaluation PRSP Operational communication program phase Strategy and Communication Monitoring Research Analysis communication program and component design implementation evaluation Communication interventions and products Country • Sector survey • Project document inputs • Multifaceted • Communication portfolio communication • Full communication- communication program review assessment based assessment of strategy performance • Sociopolitical project components implementation evaluation risk assessment • Communication • Supervision • Consultation strategies for preparation • Technical schemes and implementation assistance • Public opinion stages—multilayered and advice Client research and • Communication program • Training and Knowledge survey analysis implementation plan capacity building products Note: CAS = country assistance strategy; PRSP = poverty reduction strategy paper. How to Adopt Good Practice 61 • With project preparation and appraisal stages compressed in time, project communication activities must begin early to engage stakeholders effec- tively from the start. Otherwise, risks become stored-up problems. • Because implementation of dam projects spans several years or more, com- munication capacity building should begin at the project preparation stage or early in the implementation stage. It is not capacity building after the work is done. • The communication strategy for the implementation stage must be flexible and regularly revised. This strategy is more than just fine-tuning or reallo- cating within the communication resources. • Project supervision budgets need a degree of flexibility to accommodate the introduction of good practice in implementation appropriately. Task man- agers need Bank-wide support to build contingencies into project supervi- sion budgets that deliver continual improvement. Using the same framework, figure 2.6 illustrates how the main governance and anticorruption (GAC) interventions and products relevant to dam proj- ects map along the Bank project cycle. Figure 2.6. Mapping of Governance and Anticorruption (GAC) Interventions and Products along the Bank Project Cycle CAS and Identification Preparation Appraisal Approval Implementation Evaluation PRSP GAC interventions and products • GAC policy • Dialogue and • Full corruption risk • Coalition formation • GIP review assessment assessment (CRA) on and facilitation evaluation • National • Survey project components • Supervision of • Audits on assessments • Awareness emerging in project multifaceted GIP process and raising preparation implementation outcomes, • Benchmarking good practice (e.g., IPs, declarations accountability • Linkage of • Strategic risk • Stakeholder dialogue and on procurement, whistle- benchmarks, international assessment agreement on GP measures blower protection, budget tools such as and national • Advocacy and stakeholder roles tracking systems) Citizen Report GAC strategy to • Design of multifaceted • Information access and Cards frameworks embed GAC governance improvement accountability reporting • Multistake- improvements plans (GIPs) • Evaluation holder in dam reports platforms projects • Project document inputs • Monitoring and • Public • Benchmarking • Capacity building and compliance reports consultation good practice training programs • Technical assistance (GP) • Agreements such as • Capacity building integrity pacts (IPs) (installation and partnerships) Knowledge products Note: CAS = country assistance strategy; PRSP = poverty reduction strategy paper. 62 Opportunities in Dam Planning and Management What does such an approach mean for task managers of Bank dam proj- ects? They recognize the following: • It reinforces DAC’s call for improvements in communication at all stages of the project cycle, recognizing that most if not all GAC tools have roles for stakeholders and measures to be taken at each phase. • It reinforces the emphasis on governance-relevant analysis and assessment at the macro and sector levels by introducing GAC concepts into project identification documents and mobilizing the awareness and political will to incorporate GAC measures in the project design. • It highlights that corruption risk assessments (CRAs) need to be part of an integrated approach to risk assessment and management, with potential efficiencies between sector-level and project-level CRAs. For example, a sector CRA would routinely and efficiently incorporate CRAs in all dam projects that move from planning to implementation stages. • It shows that CRAs at the project preparation and appraisal stages contrib- ute to the design of a governance improvement plan for the implementa- tion stage, which encompasses a variety of tools for detecting and preventing corruption (identified in chapter 3). • Finally, it shows the scope to incorporate stakeholder views of GAC in the project evaluation stage to capture perceptions of corruption to that point and perceptions of risk going forward, and to draw lessons for improving the policy framework and future project implementation. Figure 2.7 illustrates how sustainability enhancement interventions and products map along the Bank project cycle. These actions improve the envi- ronmental, social, or economic performance of dam projects beyond the cur- rent environmental and social safeguards. This approach relates to the good practice the Bank promotes (such as an environmental flow assessment and benefit sharing) that are not safeguard requirements. What does this approach mean for task managers of Bank dam projects? They recognize the following: • The mapping reinforces that strategic (integrated) sustainability assess- ments undertaken during project identification and preparation stages are central to systematically identifying opportunities for introducing improve- ments in good practice sustainability. • Existing strategic environmental assessment (SEA) tools can identify the relevant practices in collaborative processes. This objective and task, how- ever, must be made explicit in the terms of reference for the SEA.16 An inte- grated sustainability assessment in project preparation that looks at environmental, social, and economic performance holistically can reveal new opportunities and mobilize stakeholder awareness and support. • It is important to identify the sustainability improvement measures that stake- holders prefer. Measures needing attention should be defined in detail and nego- tiated during project preparation. Those that can wait for further study should How to Adopt Good Practice 63 Figure 2.7. Mapping of Sustainability Interventions and Products along the Bank Project Cycle CAS and Identification Preparation Appraisal Approval Implementation Evaluation PRSP Sustainability enhancement interventions and products • Dam portfolio • Strategic • Integrated sustainability • Supervision of • Adaptive review assessments of assessment (context- implementation of social, management • Policy survey sustainability specific incorporation of environmental, and • Compliance on improving improvement sustainability elements, economic sustainability monitoring sustainability • Options e.g., EFA, benefit components feedback for aspects assessments sharing, IWRM linkages) • Trial implementation of policy for demand-supply • Benchmarking of good enhancement measures reconciliation practice and arrangements • Sustainablity • Linkage to • Collaboration on • Facilitation of partnerships audit with international • Project document sustainability design in engaging decisions on public and regional inputs partnership approaches sustainable performance consultation sustainability • Advocacy for • Public participation • Benchmarking good • Renewal of frameworks added processes informing practice partnerships and sustainability steps design parameters for the arrangements • Dialogue platforms long-term • Project document inputs • Monitoring, compliance operations • Partnership agreements evaluation reports • Riparian agreements • Technical assistance and on cooperation in knowledge sharing sustainability • Capacity building for improvement (as institutions and appropriate) partnerships Knowledge products Note: CAS = country assistance strategy; PRSP = poverty reduction strategy paper. be held for project implementation. Measures that would take effect after project commissioning, such as adaptive management of reservoirs, can wait.17 • The trade-off is that task managers must first identify a program for con- tinual improvement in which measures could be introduced during proj- ect implementation. Second, and perhaps more important, at the preparation and appraisal stages task managers must remain vigilant to maintain the operational flexibility needed to accommodate the good practice in the implementation and operation stages that is provided for in the project design. • Operational flexibility helps to rebalance the environmental, social, and economic performance aspects of the dam. This flexibility is found not only in the physical structures of the project (e.g., the size of outlets to accommodate larger downstream releases), but also in the various project agreements and legal documents. It is in the Bank lending instruments, as well as in the key agreements such as the power purchase agreements, bulk water supply agreements, and concession agreements. This multilay- ered flexibility provides scope for future operational changes and adaptive management.18 64 Opportunities in Dam Planning and Management • This approach underlines the need to plan and deliver capacity building in the two- to five-year period after commissioning a dam project and to look for more creative ways to ensure adequate operation budgets to support stakeholders’ roles in monitoring and adaptive management.19 • Evaluation-stage sustainability audits can contribute to discussions on introducing sustainability improvements for dams in the pipeline. This approach helps regulators to promote rather than constrain the adaptive management of dams. Macro Planning and Project Identification The CAS and PRSP are produced in collaborative processes with government and interested stakeholders. Initially, task managers become involved in proj- ect identification to generate the internal Project Concept Note (PCN). This process reflects macro planning priorities and sector analysis; it is where the need for a dam is identified. Figure 2.8 illustrates interventions and products that form the workspace to link the various activities that advance communi- cation, governance, and sustainability at these stages. To better capture three-way synergy, task managers may seek to ensure that the internal PCN and the Project Information Document (PID) released to the Figure 2.8. Workspace in the Macro and Project Identification Stages CAS and PRSP Project Identification Communication interventions and products Country portfolio review • Sector survey communication assessment • Sociopolitical risk assessment • Consultation schemes Client survey • Public opinion research and analysis GAC interventions and products • GAC policy review • Dialogue and assessments • Surveys • Survey • Awareness raising • Linkage of international and national GAC • Strategic risk assessments frameworks • Advocacy strategy to embed GAC improvements • Multistakeholder platforms in dam projects • Benchmarking good practice Sustainability enhancement interventions and products • Dam portfolio review • Strategic assessments of sustainability • Policy survey on improving sustainability improvement aspects • Option assessments for demand-supply reconciliation • Sector policy inputs • Linkage to international and regional • Project document inputs sustainability frameworks and arrangements • Advocacy for added sustainability steps • Dialogue platforms Note: CAS = country assistance strategy; PRSP = poverty reduction strategy paper; GAC = governance and anticorruption. How to Adopt Good Practice 65 public reflect ongoing improvements in relevant practices and benchmarking, and that the Integrated Safeguards Data Sheet, a public document that sets out project preparation priorities, shows that governance and anticorruption are an integral part of project risk. Supporting analysis and technical advice can iden- tify expectations and clarify stakeholder roles in connection with improvements in governance and sustainability on the proposed project, thereby ensuring that this philosophy moves forward during project preparation.20 More broadly, governments, CSOs, companies, and communities them- selves have a role to play in advocating measures that meet their expectations so that projects can perform as development catalysts. Making the business case for good practice is essential. Dam developers recognize it is increasingly difficult to do business without building good rela- tions with communities and other stakeholders on issues of governance and sustainability.21 Sector strategic assessments performed in open multistake- holder processes must enlist developers’ support for good practice. Project Preparation Stage At the preparation stage, task managers play an advisory role and supervise the technical and financial support extended to the government and its implementing agencies. Although the Bank is wholly responsible for appraisal, it must provide stakeholders with an opportunity to review preparation outcomes and resolve outstanding questions on project design. The appraisal sets the tone for participation and partnership approaches going forward. Preparation can span several years. When the task team is under considerable time pressure, it is often compressed to two to three years (inclusive of project appraisal and approval). Figure 2.9 depicts the interventions and products that form the workspace in which task managers have to advance activities for communication, gover- nance, and sustainability. To better capture three-way synergy, task managers may seek to undertake the following: • Ensure that government-led project preparation uses benchmarking and multistakeholder review to bring to light “good practice” for improvements in governance and sustainability. • Advocate that a CRA is an integral part of the risk management framework and must be carried out in a collaborative way. • Ensure that topic-specific assessments are not undertaken in isolation—for example, linking the CBA to the CRA and integrated sustainability assessments. • Use stakeholder processes to inform decisions on which sustainability enhancement measures to detail in project preparation and which to detail closer to commissioning and operation. • Review project design, agreements, and legal documents to ensure that they promote, not limit, the introduction of adaptive management. • Involve community members on governing or multistakeholder advisory bodies as contextually appropriate. 66 Opportunities in Dam Planning and Management Figure 2.9. Workspace in the Project Preparation Stage Preparation Appraisal Approval Communication interventions and products • Project document inputs • Full communication-based assessment of the project components • Communication strategies for preparation and implementation stages—multilayered Communication program implementation plan Governance and anticorruption interventions and products • Full corruption risk assessment (CRA) of project components emerging in project preparation • Benchmarking good practice • Stakeholder dialogue and agreement on good practice measures and stakeholder roles • Design of multifaceted governance improvement plans • Project document inputs • Capacity building and training programs • Agreements such as integrity pacts (IPs) Sustainability enhancement interventions and products • Integrated sustainability assessment: context-specific incorporation of sustainability improvements such as an environmental flow assessment (EFA), benefit sharing, integrated water resource management (IWRM) linkages • Benchmarking of good practice • Collaboration on sustainability design in partnership approaches • Public participation processes informing design parameters • Project document inputs • Partnership agreements • Riparian agreements on cooperation in sustainability improvement (as appropriate) These steps are more likely to happen if the government and implementing agency take an active interest in the philosophy of continual improvement, as noted in the case study in appendix A.22 Bank task managers can measure the commitment to continual improvement using the communication-based assessment. Implementation and Supervision Stage The borrower government imple- ments dam projects over a period of years; the task manager is responsible for advice and Bank supervision. Implementation may continue for up to five years after the dam is commissioned—a period revealing sustainable perfor- mance. Although good practice improvements in sustainability can be intro- duced in the implementation and early operation stages (depending on their nature), improvements in governance to prevent and detect corruption in procurement are delivered during implementation. Figure 2.10 illustrates interventions and products that form the workspace to advance aspects of communication, governance, and sustainability at the implementation stage.23 To better capture three-way synergy in supervision, it is helpful for task managers to do the following: • Follow through with preset benchmarks for continual improvement in evaluating and introducing good practice. How to Adopt Good Practice 67 Figure 2.10. Workspace in the Project Implementation Stage Implementation Communication interventions and products • Implementation of multifaceted communication strategy • Supervision • Technical assistance and advice • Training and capacity building Governance and anticorruption interventions and products • Monitoring and compliance reports • Technical assistance • Capacity building (institutions and partnerships) • Coalition formation and facilitation • Supervision of multifaceted GIP implementation (e.g., integrity pacts and declarations on procurement, whistle-blower protection, budget tracking systems) • Information access and accountability reporting Sustainability enhancement interventions and products • Supervision of implementation of social, environmental, and economic sustainability components • Trial implementation of enhancement measures and arrangements • Facilitation of partnerships engaging decisions on sustainable performance • Monitoring, compliance evaluation reports • Technical assistance and knowledge sharing • Capacity building (institutions and partnerships) • Monitor changes in the policy environment that will unlock opportunities to introduce further good practice, using multistakeholder partnerships to review and advocate their inclusion. • Closely monitor how well key institutional and multistakeholder partner- ships function and provide appropriate communication support, including conflict resolution. • Build capacity for stakeholder participation in the operation stage of dam projects that is vital to maintaining trust in governance measures and in improvements to the evolving sector and river basin management (IWRM) policy environment. • Seek and support opportunities to benchmark corporate governance and the communication practices of implementing and operating agencies. • Prior to project commissioning, prepare a new communication strategy for the operation stage, recognizing that risks and stakeholder roles will change. • More broadly, task managers should seek ongoing improvements in com- munication practices, which require flexibility in supervision budgets. Completion and Evaluation Stages At the end of the disbursement period, task managers identify in an implementation completion report (ICR) the accomplishments, problems, and lessons learned. In the evaluation phase, the Bank’s independent Operations Evaluation Department (OED) may conduct 68 Opportunities in Dam Planning and Management Figure 2.11. Workspace in the Project Evaluation Stage Evaluation Communication interventions and products • Communication program performance evaluation Governance and anticorruption interventions and products • Governance improvement plan (GIP) evaluation • Audits on process and outcomes (accountability, benchmarks, tools such as Citizen Report Cards) • Evaluation reports • Public consultation Sustainability enhancement interventions and products • Adaptive management • Compliance monitoring feedback for policy • Sustainability audit with public consultation • Renewal of partnerships for the long-term operations a separate audit or prepare a project performance report (PPR) to measure project outcomes and their sustainability against the original objectives. The Bank’s Independent Evaluation Group (IEG) reviews the ICRs using stan- dardized criteria and may also perform more rigorous independent impact assessments of social, environmental, or other aspects. Figure 2.11 illustrates the interventions and products at the evaluation stage. To better capture three-way synergy, it is helpful for the ICR and audit process to do the following: • Highlight successes and failures in reflecting the philosophy of continual improvement from project preparation through implementation • Emphasize the extent to which major-country policy and institutional reforms influence improvements in project governance and sustainability and the degree of integration in the project to understand whether oppor- tunities were seized or missed • Highlight accomplishments, problems, and lessons learned in adopting good practice communication, governance, and sustainability • Indicate the attitudes, values, and perceptions of stakeholders revealed through participatory processes and partnerships that facilitated ongoing improvement. OED and IEG evaluations should highlight good practice in governance and sustainability improvements in the World Bank’s own portfolio of dam projects. The IEG criteria may look for the project’s degree of benchmarking and use of the Bank’s own good practice, seek reasons why these were (or were not) adopted, and propose remedies in general project cycle activities where appropriate. Figure 2.12 unites these aspects to provide an overall picture of the relationships. How to Adopt Good Practice 69 Figure 2.12. Governance, Sustainability, and Communication in Interventions at All Stages of the Bank Project Cycle CAS and Identification Preparation Appraisal Approval Implementation Evaluation PRSP Operational communication program phase Strategy and Communication Monitoring Research Analysis communication program and component design implementation evaluation Communication interventions and products Country • Sector survey • Project document inputs • Multifaceted • Communication portfolio communication • Full communication-based communication strategy program review assessment assessment of project components implementation performance • Sociopolitical • Communication • Supervision evaluation risk assessment strategies for preparation and • Technical assistance • Consultation implementation stages—multilayered and advice schemes • Communication program • Training and capacity • Public opinion implementation plan building Client research and survey analysis Governance and anticorruption (GAC) interventions and products • GAC policy • Dialogue and • Full corruption risk • Coalition formation • GIP review assessment assessment (CRA) on project and facilitation evaluation • Surveys • Survey components emerging during • Supervision of • Audits on • Awareness project preparation multifaceted GIP process and raising • Benchmarking good practice implementation outcomes, • Stakeholder dialogue and (such as IPs, declarations (accountability • Linkage of • Strategic risk agreement on good practice on procurement, whistle- benchmarks, international assessments measures and stakeholder roles blower protection, budget tools such as and national • Advocacy • Design of multifaceted tracking systems) Citizen Report GAC strategy to governance improvement • Information access and Cards) frameworks embed GAC plans (GIPs) accountability reporting • Multistake- improvements • Evaluation holder in dam • Project document inputs • Monitoring and reports platforms projects • Capacity building and compliance reports • Public • Benchmarking training programs • Technical assistance consultation good practice • Agreements such as • Capacity building integrity pacts (IPs) (institutions and partnerships) Sustainability enhancement interventions and products • Dam portfolio • Strategic • Integrated sustainability • Supervision of • Adaptive review assessments of assessment (context-specific implementation of social, management • Policy survey sustainability incorporation of sustainability environmental, and • Compliance on improving improvement elements such as environmental economic sustainability monitoring sustainability • Options flow assessments, benefit components feedback for aspects assessments sharing, IWRM linkages) • Trial implementation of policy for demand-supply • Benchmarking of good practice enhancement measures reconciliation • Collaboration on sustainability and arrangements • Sustainability • Linkage to • Sector policy design in partnership • Facilitation of partnerships audit with international inputs approaches engaging decisions on public and regional • Public participation processes sustainable performance consultation sustainability • Project document informing design parameters • Renewal of frameworks inputs • Monitoring, compliance partnerships and • Advocacy for • Project document inputs evaluation reports for the arrangements added • Partnership agreements • Technical assistance and long-term sustainability steps • Riparian agreements on knowledge sharing operations • Dialogue platforms cooperation in • Capacity building sustainability (institution and improvement (as partnerships) appropriate) 70 Opportunities in Dam Planning and Management Table 2.5. Some Dos and Don’ts in Improving Communication along the Bank Project Cycle to Support Improving Governance and Sustainability in Dam Projects Don’t do this Do this ✂ Don’t forget that many dam developers ✓ Do introduce the philosophy of continual now acknowledge their role to promote improvement at project conceptualization. community development but have limited ✓ Do share the Bank’s good practice experience experience with community issues. with government and project stakeholders ✂ Don’t forget to monitor the functioning of from the start. key institutional and multistakeholder ✓ Do encourage working relationships and partnerships and their evolving functional protocols for dam developers and communication support needs. local communities. ✂ In the identification stage, don’t forget ✓ Do ensure there is adequate contingency and to embed the process of ongoing flexibility in communication budgets for improvement. project supervision. ✂ In the preparation stage, don’t forget to ✓ Do adopt good practices and supporting incorporate multistakeholder processes to functional partnerships in implementation. benchmark against good practice. ✓ Do look at the project agreements and legal ✂ In the appraisal stage, don’t forget to defer documents at the appraisal stage to ensure some aspects of good practice to they do not constrain recognized good implementation, but build intentions, practice and adaptive management, flexibility, and triggers into project design. especially after project starts operation. ✂ In the implementation stage, don’t forget to assess changes in the policy environment and to benchmark against good practice. Table 2.5 is a summary of some dos and don’ts on improving practices and capturing three-way synergy during the conception and supervision of dams along the Bank’s project cycle. Investing in Communication for Governance and Sustainability This section illustrates the budget implications of introducing good commu- nication practices in support of improvements in governance and sustainabil- ity on dam projects. There is no simple answer to how much time and how many resources are involved. Two important questions, however, must be asked: Are project outcomes improved? How do good communication prac- tices otherwise improve the capacity of practitioners to manage risks and stakeholder expectations? Relevance for Communication Budgets Table 2.6 depicts the relative impact of adopting good communication practices on communication expenditures at different stages of the dam project cycle.24 These improvements are to some extent reflected in today’s trends in project activities. For example, figure 2.13 illustrates recent patterns in communication activities in Bank projects, though not exclusively dam projects. Although it looks at the basic question of communication from a different angle (communi- cation activities that “seek inputs” and communication activities “that seek out- puts”), it demonstrates how communication activities increasingly support stakeholder engagement processes.25 However, the CBA remains underutilized. How to Adopt Good Practice 71 Table 2.6. Relative Impact of Communication Improvements on Project Budgets Stage of Relative project cycle budget impact Key improvements featured or delivered Identification None Indicates a process of continual improvement over the project cycle Preparation Moderate to Enhanced communication-based assessment (CBA) significant Enhanced communication support for stakeholder participation Enhanced governance and anticorruption (GAC) support for partnerships Introduction of good practice for improving sustainability Supervision/support for communication capacity development for operating entities Appraisal Moderate Enhanced support for stakeholder participation in reviews Enhanced support for partnerships Negotiation + Modest Agreement on a process of continual improvement over the APPROVAL project cycle: definition, milestones, triggers, etc. Implementation Significant Enhanced supervision/support for communication capacity of Plus greater institutional and multistakeholder partnerships contingency Supervision/support for four-stage preparation of operation and flexibility stage communication strategy for ongoing Supervision/support for communication capacity improvement development for operating entities and stakeholder roles in adaptive management and operation stage governance improvement plan (GIP) Supervision/support for communication capacity development of media Completion Modest to Elicit stakeholder views and feedback in implementation moderate completion report (ICR) Evaluation None to Depends on Operations Evaluation Department (OED) and modest Independent Evaluation Group (IEG) An example of this trend is the increase in spending on communication activities in the Lesotho Highlands Water Project from the Phase IA and IB project preparation stages to the current Phase II. Communication was a very small component of the LHWP total during the Phase IA and IB project prep- aration in the 1990s and early 2000s. By 2008, however, communication and public stakeholder consultation activities for Phase II feasibility studies accounted for more than 35 percent of the total budget. Communications Budgets: Current Practice Baseline Useful here is a look at the communication expenditures for two active Bank- supported dam projects: the 1,200-megawatt Nam Theun 2 project in Laos and the 50-megawatt Bumbuna hydropower project in postwar Sierra Leone. The Nam Theun 2 project budgeted $250,000 to contract out the CBA activities and collaborative preparation of the communication strategy for the implementation phase. 72 Opportunities in Dam Planning and Management Figure 2.13. Profile of Communication Activity on Bank-Supported Projects in 2007 Communication activities in Bank’s FY07 portfolio [total of projects analyzed = 276] Key 67% 41% 47% 31% 32% 30% 15% 2% Communication 4% assessment Stakeholder analysis Consultation Public opinion research/surveys Information dissemination Information & awareness campaign Information & education campaign Communication strategy Outreach activities Activities that seek inputs Communication outputs These sorts of communication These sorts of communication activities require more emphasis activities need more emphasis in in dam projects, especially those dam projects, especially the activities connected to risk communication strategies that identification and mitigation that support stakeholder roles in link to stakeholder expectations. governance and sustainability improvement. Source: Task Team Leaders Survey, Latin American and the Caribbean (LAC) Region, Development Communications Division, World Bank, 2004. This figure, which excluded supervision costs, was just one item in the total project communication budget. The consultant hired provided assistance in conceptualizing, designing, and implementing a campaign, including a stake- holder mapping exercise, opinion research, and design and implementation of short- and medium-term communication strategies; holding training, work- shops, and clinics; preparing effective public information materials; and devel- oping and managing an interactive Web site.26 The Bumbuna project budgeted $200,000 for the CBA, development of a communication action plan during project preparation, and two years of implementation. This figure excluded supervision costs. Incremental Costs of Improvements in Governance and Sustainability In preparing this handbook, the authors estimated the incremental cost of developing a governance and anticorruption component of a water supply project. Table 2.7 shows the time and budget involved in project preparation. The activities described in table 2. 8 revolve around a rigorous review of the corruption risks associated with the current project organizational struc- ture and the development of a governance improvement plan to mitigate the main project corruption risks in implementation. It includes hiring a three- person team of experienced governance experts—international, regional, and local. The team would interview representatives of various project and stakeholder interests, including public sector, private sector, civil society, and funding organizations. How to Adopt Good Practice 73 This example excludes the cost of a two-day workshop in which stakehold- ers would collectively review CRA results and discuss the main elements of the governance improvement plan (GIP) and their respective roles. Table 2.9 outlines the content and cost of the workshop. At the workshop, organizers would present the CRA and the outline of the GIP and the perspective papers by different stakeholder interests on the sought-after Table 2.7. Communication Budget, Project Table 2.8. Representative Cost of Corruption Preparation, and Implementation Risk Assessment (CRA) and Stages, Bumbuna Hydropower Governance Improvement Plan Project, Postwar Sierra Leone (GIP) for a Water Supply Dam A. Communication Action Plan Expected A plan setting out the sectoral/ output project corruption risk map, as – Salaries $84,000 well as a GIP – Training 1,500 Orientation Link to sector regulation and – Equipment 14,500 and linkage policy framework, looking at risk – Running costs 4,200 of corruption at all stages of the project cycle Communication with involved 4,400 institutions Communication Parallel CBA analysis of attitudes component toward corruption of key sector Communication with general 47,778 agencies and project stakeholder public interests Communication with local 38,500 Preparation of awareness building communities and advocacy strategy Communication with international 7,840 Estimated International, 2.0 community (Web site) person-months Regional, 1.0 Subtotal $202,718 Local, 2.0 Estimated cost $119,000 Table 2.9. Representative Cost of Multistakeholder Workshop for Three-Way Synergy from Governance, Sustainability, and Communication Expected output Recommendations by project participants of factors to emphasize in project preparation Stakeholder perspective position papers plus presentations Workshop dialogue and relationship building among stakeholders Orientation and Participants would be major project stakeholders, including donors and representatives linkage of local interests and ministries. Workshop could be organized as part of larger a stakeholder workshop using breakout sessions. Communication Parallel CBA analysis of attitudes and expectations on corruption and the sustainability component dimensions of the project Preparation of advocacy strategy and key messages for different stakeholders Estimated International, 1.0 person-months Regional, 0.5 Local, 1.0 Logistics $10,000 Estimated cost $70,000 74 Opportunities in Dam Planning and Management improvements in sustainability and communication.27 Outputs would include consensus on an action plan to use in the project preparation activities. Project stakeholders (such as municipal representatives, affected community representatives, water user representatives, donors, concerned government agen- cies, procurement agencies, and civil society representatives) would be invited to participate in the workshop. Side events could include media and CSO capacity- building workshops. Breakout work group sessions would develop a priority list of steps that actors could take individually and collectively to build sustainability into the project, as well as the action and financing plans. Notes 1. See Margaret Matters, The Nuts and Bolts of Benchmarking (North Carlton, Victoria, Australia: Alpha Publications Pty. Ltd., 1995). 2. Benchmarking is a broader management tool for improving the performance of orga- nizations, regardless of the field or whether it is a public enterprise, private sector com- pany, or civil society organization. 3. Transparency International provides specific suggestions on benchmarking anticorruption measures for Bank-supported infrastructure projects: http://www.transparency-usa.org. 4. Formulation of the strategy requires qualitative judgment, familiarity with good prac- tice today, and access to the database on good practice that the Bank’s Development Communication Division (DevComm) itself is continuously building though various activities, including its working paper series. Chapter 3 explains how non-Bank practi- tioners can access that series. 5. For example, the emphasis that should be placed in the benchmarking exercise on media relations and the media’s roles, multistakeholder partnerships, crisis communication pre- paredness, the use of CBA tools such as opinion research, or issues dealing with the man- ner in which organizations are structured to respond to communication challenges and the work processes they employ in the management of the communication function. 6. As explained in the synopses in appendixes A and B and elaborated in the full case studies published by the World Bank, there were still challenges and failures. But most impor- tant, the mechanisms were in place. See Lawrence J. M. Haas, Leonardo Mazzei, Donal T. O’Leary, and Nigel Rossouw, Berg Water Project: Communication Practices for Gover- nance and Sustainability, World Bank Working Paper No. 199 (Washington, DC: World Bank, 2010); and Lawrence J. M. Haas, Leonardo Mazzei, and Donal T. O’Leary, Lesotho Highlands Water Project: Communication Practices for Governance and Sustainability, World Bank Working Paper No. 200 (Washington, DC: World Bank, 2010). 7. As the Development Communication Division (DevComm) of the World Bank notes, neither general information nor targeted messages are absorbed, or shared, if stakehold- ers do not trust the government, project authorities, or others with whom they partner. 8. Combating corruption related to the project cost (which ultimately affects water and electricity tariffs) would, for example, add value for the low-income urban or periur- ban consumers most adversely affected by tariff increases. Similarly, the rural poor are often those most adversely affected by the failure to incorporate measures to promote environmental sustainability. Such a failure leads to the unnecessary loss of ecosystem services, which affects rural quality of life and livelihoods. 9. In an integrated risk management approach, “recognition of rights” and “assessment of risks” (particularly rights at risk) form the basis for more effective participation in handling risks in the planning and management of dams. How to Adopt Good Practice 75 10. King Report on Corporate Governance for South Africa. Parktown, South Africa: Insti- tute of Directors in Southern Africa, 2002. 11. As noted in the full BWP case study and in the interest of balance (in relation to pro-dam and anti-dam perspectives), some EMC members categorically rejected the PPP bench- marking, as well as several environmental NGOs and CSOs that had been affiliated with the Skuifraam Action Group (see appendix A). 12. The TCTA stated that its aim was to grow its reputation, not only to enhance collabora- tion with local partners on the BWP, but also to build public support for its involve- ment in future bulk water supply projects in the Western Cape and nationally. The TCTA’s public messages explained that maintaining a good reputation helped it to maintain a good credit rating for projects. A good rating in turn helped reduce borrow- ing costs (thereby reducing water tariffs for consumers) and gave South Africa better access to financial markets for future bulk water supply investments. 13. As explained in chapter 1, the Word Bank’s Development Committee called for infra- structure practitioners to improve communication along the project cycle to advance governance and anticorruption in Bank-supported infrastructure projects. This call is relevant to advancing sustainability in the provision of infrastructure. 14. The most important decision at the strategic planning stage is whether to advance and approve a dam project. Key decisions at the project preparation stage are related to the project design and financing arrangements. During project implementation, multiple decisions are made about the infrastructure, social, and environment management aspects. And during operation, key decisions are related to the adaptive management of economic, social, and environmental performance. 15. Adapted from an internal presentation, Development Communication Division, World Bank. 16. For example, to (1) incorporate a policy review, recognizing it is often possible to dem- onstrate that the legislation and existing policy framework calls for good practice sus- tainability improvement measures, but that the actual measures themselves have not yet been translated into dam projects; (2) benchmark against accepted good practice; and (3) provide a multistakeholder platform that enables discussion of priorities. 17. Task managers need not expend the time and resources to advocate the measures if the government does not see them as an immediate priority. 18. One example of this flexibility is how the bulk water supply agreement between the Department of Water Affairs and Forestry and the City of Cape Town incorporated the Berg Water Capital Charge that enabled the operator (TCTA) to make flexible changes in downstream releases from the dam to accommodate monitoring of water quality and ecological status without compromising its financial position and ability to service debt. This risk was borne by the consumers of water and energy service. It was wholly justified on the basis of internalizing in tariffs—not through a government subsidy— the cost of providing sustainable infrastructure. 19. Few Bank projects provide support for dam operations, but many aspects of the sus- tainable performance of dams hinge on adaptive management. 20. One example of strategic assessment in the governance area is Transparency Interna- tional’s Bribe Payers Index (BPI), which ranks the propensity of private enterprises in particular countries to pay bribes. TI’s Corruption Perceptions Index (CPI) documents a country’s reputation for honest practice. Countries with an adverse rating can be perceived as high on demand-side corruption. 21. Companies also recognize it is increasingly difficult to do business without building good relations with communities and other stakeholders. If companies understand that consultation or consent is part of the process of obtaining a legal license, gaining good community relations would be cheaper and easier. Companies are beginning to 76 Opportunities in Dam Planning and Management acknowledge that they have a role to play in promoting community development, but many have limited experience with community issues. 22. Some developers will engage in efforts to improve governance and sustainability because of an expressed commitment to social responsibility and reputational inter- ests. Others are required to do so by regulation and legislation. 23. Other practical aspects include ensuring that many of the task team members are not the same as those who participated in preparation of the previous project, and seeking a longer implementation phase, which will provide an opportunity to look at many new aspects of good practice. A key issue is to ensure flexibility to introduce relevant good practice over time. 24. Direct comparisons with past budget practices is difficult as it depends on how spend- ing is now captured in project budgets—for example, whether growing expenditures for community consultation are captured in the resettlement or livelihood enhance- ment budget or the communication budget. 25. Activities that seek input are communication assessment, or stakeholder analysis, and public opinion research and consultations to inform decisions about and the design of project components. Activities that produce outputs are information dissemination, information and awareness activities, information and education campaigns, and out- reach activities—all captured under communication strategies. 26. World Bank, A Toolkit for Procurement of Communication Activities in World Bank- Financed Projects (Washington, DC: World Bank, 2005), http://siteresources.world bank.org/EXTDEVCOMMENG/Resources/toolkitENfinal.pdf. 27. Whether this workshop is combined with review of benchmarking of the draft com- munication strategy would depend on factors such as the size of the project and com- plexity of those processes and whether a multistakeholder group had already taken ownership of the process to validate the project communication strategy. 3 Tools and Resources: Some Thumbnail Sketches Five Key Messages on Field Experience, Tools, and Resources 1. Many tools used for dam planning and management originate in the dif- ferent areas of communication practice: development communication, corporate communication, internal communication, and advocacy com- munication. These tools are not used to their full potential in part because infrastructure practitioners are not aware of them. 2. The main tools used to embed governance and anticorruption measures in dam projects are (1) corruption risk assessments, prepared up-front in the project identification and preparation stages, and (2) governance improve- ment plans to implement recommended measures. Practitioners can choose from a wide variety of anticorruption tools. However, a consensus among stakeholders can help in choosing the most effective set for a particular situation. 3. Although the choice of tools depends on the context, an integrated sus- tainability assessment that considers all the dimensions of sustainability is a good starting point. This assessment, involving representative groups of stakeholders, ensures a common point of reference to determine how en- vironmental, social, physical, financial, and institutional sustainability work together. For example, without financial and institutional sustainability any proposed measures for social and environmental sustainability become very difficult to implement. 4. Technical advice on how to apply these tools in specific contexts is available to World Bank task teams. The priority in applying the tools is to adopt collaborative approaches and to add value from stakeholder perspectives. 5. Anyone formulating training and capacity-building measures should look carefully at shared learning approaches for knowledge on mainstream- ing tools. It is important for World Bank task teams to designate country counterparts for orientation training on these themes, including at a minimum one communication expert and one infrastructure practitioner. 77 78 Opportunities in Dam Planning and Management Communication Tools These thumbnail sketches of tools from the development communication field are written with infrastructure practitioners in mind, especially non- Bank practitioners who are less familiar with communication support from the Bank’s Operational Communication Division. This section begins with an inventory of communication tools, focusing on the four-phase development communication approach depicted here. This inventory is followed by a section that describes at which stages of the World Bank and infrastructure project cycle the communication tools apply and add the most value. Analysis (CBA) Monitoring Communication and Four phases strategy evaluation design Communication program implementation Development Communication Tools Phase 1: Communication-Based Assessment (CBA) • Communication needs assessment (CNA) • Qualitative and quantitative communication research, including: • Polling • Perception studies • Baseline studies • Surveys • Interviews (client, project, sector, regional) • Qualitative research (in-depth interviews and focus group discussions) • Sociopolitical analysis • Stakeholder analysis • Participatory techniques • Assessment of media and local communication capacity The tools useful in phase 1 of the four-phase development communication approach are described in the sections that follow. Communication needs assessment (CNA). A CNA is a set of techniques used to assess local capacities, gain insight into sociopolitical concerns and roadblocks that affect the dam project, and determine the knowledge level and perceptions of the media about the project and related issues. It reveals what nongovernmental organizations (NGOs) are doing in the same area and veri- fies the availability and skills levels of research and communication agencies in Tools and Resources: Some Thumbnail Sketches 79 the country. CNA studies rely on interviews and analysis of the available data to better understand the socioeconomic, cultural, and political contexts and to determine stakeholder perceptions, opinions, and beliefs. Qualitative and quantitative communication research. Based on qual- itative and quantitative methods, this research delves into why people do what they do and think what they think. It investigates what behavioral or policy change is needed for the reform or development intervention to suc- ceed. Ideally, this research links to the social assessments conducted in the framework of the project—that is, the project preparation studies. These research results help to decide on the directions for the communication policy, the improvements to be sought in operations, and the design of the communication strategy. The specific activities performed include but are not limited to polling, per- ception studies, baseline studies, surveys, and qualitative research (in-depth interviews and focus group discussions). Regional surveys inform the development of region-wide strategies and new products and services. These surveys can measure attitudes toward approaches among elites or the general population. Sector surveys measure views on specific interests in a policy, project prior- ity, or priority areas of development. Project surveys inform the development of targeted communication strategies that resonate with critical audiences and the general population and provide teams with a more complete understanding of the project environment. Client surveys are macro-level surveys undertaken in the development stages of the country assistance strategy (CAS) to engage with clients through a tracking survey sent to stakeholders in the country. This survey assesses the attitudes of stakeholders toward financing agencies and work in the country, as well as toward broader development issues. Client satisfaction and value-added surveys are conducted for clients trying to measure their own clients’ attitudes and sense of value added toward meet- ings, events, and so forth. Sociopolitical analysis techniques. Policies and development interven- tions cannot be effective without understanding the political environment not only for the initiatives but also for the communication functions that support them. This analysis provides details on the political risk environment for the reform policy or the project, the degree of transparency in similar develop- ment initiatives, the government’s capacity to communicate with stakeholders, the institutional support for communications, the human resources needed to implement and evaluate communication strategies, and the legal framework for communication activities. 80 Opportunities in Dam Planning and Management Various analytical tools such as public opinion polling are used to help decision makers in governments, development institutions, the private sec- tor, and NGOs understand the stakeholder dynamics at the country, sector, and project levels. The analysis can also identify the pre-reform, political, or economic influences of change in society such as the media, NGOs, universi- ties, think tanks, or ethnic and religious groups. Stakeholder analysis techniques. Stakeholder analysis is a tool for plan- ning and managing relations on most development initiatives. It can assess not only stakeholders’ degree of understanding and buy-in of the government’s reform policy, program, or development initiative in any field, but also their perceptions and priorities. Identifying, disaggregating, and tracking stake- holders’ perceptions and expectations lead to a better understanding of the opportunities and limitations of the project. With the support of the Bank’s Operational Communication Division, the information can reveal segmenta- tion of stakeholders and audiences, identify opinion leaders or allies, recognize the relevant social topics, and help task managers understand stakeholders’ experiences and expectations. Stakeholder analysis is commonly used in dam planning and management. However, the relative importance it is given by the task manager, and conse- quently the resources allocated to it, varies considerably. This variation affects its detail, scope, and usefulness to task and risk management. Participatory techniques. Today, most practitioners accept that the mean- ingful participation of stakeholders and partnerships from an early stage is central to informed decision making, leading to better-quality development initiatives and more sustainable results. Consultation implies the active solici- tation of stakeholder perspectives to help shape projects and policy, instituting mechanisms for two-way information flow, building consensus, and providing conflict management when necessary. The CBA approach provides practitio- ners with the social mapping they need to advance constructive engagement with beneficiaries and interested parties who help to shape public attitudes from the beginning of a project. Box 3.1 illustrates the practical questions addressed. These sample ques- tions could relate to dam project management of resettlement and local development. Techniques for assessing the media and local communication capacity. The Bank’s Development Communication Division advocates two steps for determining the media tools appropriate for different target audiences: (1) identify the channels each segment of society uses to receive and dissemi- nate information, and (2) evaluate the degree of trust existing in each channel. Tools and Resources: Some Thumbnail Sketches 81 Box 3.1. Social and Participatory Communication Analysis: Issues to Be Covered by the CBA Social Forms of Information • What are the spaces (such as schools and churches) of social interaction for the community? • How are the beneficiaries represented? How are those leaders elected? Is the development initiative aware of these activities? • How does the community make decisions (by means of meetings, com- mittees about common problems)? How often? Have they discussed the topics related to the project in their meetings? What did they agree on? • Have the beneficiaries produced some communication products in their communities? Can the project use these as communication mechanisms? • Are there informal organizations in the community? What kinds of groups? What are their main activities? Participation through a Two-way Communication Process • Have the beneficiaries been consulted about the initiative? When? How were they informed? Which materials or messages did they receive? Which institution produced them? What was the final outcome of the consultation? What are the next steps for strengthening communication and interaction with them? • How do the beneficiaries participate in the project? When did they start this process? What communication mechanisms do they use? • Is the local political culture familiar with the concepts and outputs of the project? Building Consensus • Have the interests of the formal and informal community and local lead- ers been identified in project benefits and changes? What is the relation- ship among them? Have they worked together on past experiences? What were the results? • Have there been previous conflicts among these people? Current con- flicts? What is the magnitude? Could they affect the project? • What common points have been identified for starting a consensus- building project? What is the degree of commitment for negotiating? • Does the government support the community agreements? What is the community’s opinion of governmental intervention? What about other stakeholders’ interventions (such as the private sector or NGOs)? Identifying Networks • Who are the champions? How important are they for the beneficiaries and stakeholders? • What other institutions are participating in community development? How do they coordinate to take actions? What is the level of community involvement? How do the other institutions measure this involvement? 82 Opportunities in Dam Planning and Management The CBA framework media analysis provides a picture of different stake- holders’ reasons for using specific communication channels, their level of trust in their sources, and the expectations generated by receiving information through mass media channels. The tools useful in phase 2 of the four-phase development communication approach are described in the sections that follow. Phase 2: Communication Strategy Design • Definition of communication objectives • Situation and risk analysis (ranging from political to impoverishment risk analysis) • Detailed communication strategies and action plans Definition of communication objectives. This stage begins by finalizing and adjusting the communication objectives to the overall goals of the project or development initiative. This process is usually straightforward, based on the recommendations emerging from the CBA framework. Table 3.1 outlines the sequential steps commonly taken in preparing the com- munication strategy, using the example of changing farmer behavior to control the incidence of fires in watersheds. This example is not specifically linked to dam planning and management or integrated water resources management (IWRM) in catchment management, but it does illustrate the technique. Situation and risk analysis (ranging from political to impoverishment risk analysis). This risk analysis is similar to the political risk analysis identified earlier in this chapter. This analysis, however, is able to focus more specifically on project and stakeholder risks, thereby complementing stake- holder analysis. Some tools in the social field, for example, cover risk analysis and so would work for project preparation studies and safeguard studies. From the communication perspective, this analysis identifies the most effec- tive ways to deal with stakeholder concerns and perceptions about risk and to maximize the value that communication adds in risk mitigation for all stakeholders. Communication strategies and action plans. Community strategies and action plan documents guide communication implementation activities. A communication strategy is a well-planned series of actions aimed at achieving specific objectives through the use of communication methods, techniques, and approaches. Tools and Resources: Some Thumbnail Sketches 83 Table 3.1. Steps in the Design of a Communication Strategy Basic steps Main activities Practical examples 1. Review the focal Define the main problem and Fires started by farmers because of problem probe its causes lack of knowledge of fire-control techniques 2. Define SMART Transform solutions into objectives, Reduce forest lost from objectives and stated in a feasible and measurable uncontrolled fires by 80 percent identify key themes way, identifying key messages within next two years 3. Define primary Define and probe main group(s) of Local farmers and their cultural and audiences/ interest or define and probe socioeconomic contexts stakeholders (1SHs) audiences 4. Identify secondary Identify other groups of interest or Farmers’ families, other local audiences/ audiences related to the overall actors, NGOs, government stakeholders (2SHs) objective agencies 5. Define Assess objectives, audience 1SHs: capacity building, technical communication context, and budget to select the training approaches and most effective approach, linear or 2SHs: awareness-raising media tactics interactive mode campaign 6. Select channels and Select most appropriate media for 1SHs: use preferred sites and media 1SHs and 2SHs venues to provide information 2SHs: select appropriate media mix in that context 7. Design content Define key issues and most 1SHs: instructional design, key topics and messages effective way to package them technical issues 2SHs: messages for raising awareness and knowledge 8. Assess the expected 1SHs: change in behaviors and 1SHs: farmers adopt more secure results of the practices to reduce forest techniques to reduce incidence of strategic design for destruction uncontrolled fires success of 2SHs: raising awareness of the 2SHs: become more aware of the development importance of conservation importance and benefits of initiative preserving forests Source: Paolo Mefalopulos, Development Communication Division, World Bank (Sierra Leone), 2006. Action plans set out the details (e.g., the design of communication materi- als and training of relevant staff) and instructions on producing and distrib- uting media and information products. Figure 3.1 depicts the typical com- ponents of the communication action plan.1 Typically, a dam project would include these components, as well as other components related to dealing with riparian countries. An effective communication plan would ensure that all activities, costs, and responsibilities are defined, justified, and monitored. The tools useful in phase 3 of the four-phase development communication approach are described in the sections that follow. 84 Opportunities in Dam Planning and Management Figure 3.1. Components of a Communication Action Plan for Dam Projects PIU capacity building Community Coordination development with EIA and plan RAP teams* Communication action plan External Institutional communication coordination Grassroots Media relations communication Source: Leonardo Mazzei. Note: EIA = environmental impact assessment; RAP = resettlement action plan; PIU = project implementation unit. Phase 3: Communication Implementation Tools to implement activities specified in the communication strategy: • Internal communication • Corporate communication • Advocacy communication • Development communication Decision template for five communication management objectives: • Project-related information dissemination tools • Conflict resolution tools • Professional development and training • Capacity-building tools The communication action plan identifies the different communication tools and resources needed to implement the communication strategy. Decision template for five communication management objectives. When communication management needs are relatively straightforward, the tem- plate for five communication management decisions can be used as a basis for monitoring the communication strategy for the project or program. The template essentially addresses five questions: Tools and Resources: Some Thumbnail Sketches 85 1. Which audiences need to be reached by the communication component? 2. What are the required behavior changes? 3. What messages are the most appropriate? 4. Which channels of communication will be most effective? 5. How will the communication process be monitored and evaluated? In more complex projects, the template may be appropriate for aspects of the project that are relatively straightforward. For example, in environmental flow policy the template could be used in developing and monitoring com- munication support to contribute to reservoir operation parameters. Other aspects of the project, such as the public-private, may require more complex treatment. Project-related information dissemination tools. The following list of tools provided by the Bank’s Operational Communication Division is by no means comprehensive. • Information dissemination/campaigns are the targeted dissemination of information to fill specific knowledge gaps. This approach relies heavily on diffusion models through media campaigns, which apply in a number of circumstances, either for broader national audiences or for popula- tions in specific areas. In the past, campaigns tended to rely heavily on a single, specific medium. Today, they take advantage of a mix of different media. • Information, education, and communication (IEC) refers to a broader set of tactical approaches to disseminate information and to educate large audi- ences. It is based on the linear transmission model in which information is disseminated through a number of media. • The education/training approach applies to programs requiring instructional design, often based on an interactive modality. Educational approaches aim to increase knowledge and comprehension, whereas training approaches focus on improving professional skills. • Institutional strengthening seeks to strengthen the internal capacities of an institution (e.g., through training) or to position and improve its image with external audiences. • The community mobilization approach is a systematic effort to involve the community in resolving specific issues related to its well-being. The approach may require the formation of groups designated to participate in the decision-making process and to follow up on specific issues (e.g., monitoring the activities in a project work plan). The communication strategy will take into account the many channels that can be used to reach different audiences. These channels range from the elec- tronic media, such as the Internet, print media and broadcast media, to the traditional channels, such as popular theater, drums, and storytelling. 86 Opportunities in Dam Planning and Management Conflict resolution tools. The CBA can advise on the different conflict resolution tools that may be needed to deal with issues arising among proj- ect stakeholders. These tools are well documented in the literature. What is important here is that the communication strategy identify the types of tools that can be deployed to support communications needs. Professional development and training. The existing formal, informal, and on-the-job training courses and programs are either available or can be accessed regionally. During implementation, the key stakeholders involved in the project would be given access to training based on needs identified in the CBA. Capacity-building tools. These tools fall into two categories: (1) tools to identify communication possibilities as part of a project or program, and (2) tools to build capacity for communications to support the project or the successful and sustained application of reform. The tools useful in phase 4 of the four-stage development communication approach are described in the sections that follow. Phase 4: Communication Evaluation • Traditional results and ex post evaluations • Participatory monitoring and evaluation • Public opinion tracking studies • Randomized design, baselines, and surveys According to the Bank’s Operational Communication Division, evaluation is a crucial aspect of development communication interventions. Measuring and evaluating the impact of social interventions are never simple, and in development communication that task becomes more difficult and complex, mostly because of its broad role. The following sections describe some of the tools used in communication-based monitoring and evaluation. Traditional results and ex post evaluations (based on indicators of the ex ante evaluation). Ex post evaluation tools and indicators can be developed for all communication interventions. Periodic feedback from the main stakeholders is of primary importance, however. This feedback may help redefine the implementa- tion of both the development initiative and the communication program to better accomplish the development goals. Participatory monitoring and evaluation. This step is an extension of participation in the project design with the aim of informing deci- sion making on all aspects of a project. A variety of tools and techniques can be used to involve stakeholders in determining the value and support offered by communication activities. For example, the implementation of community development initiatives with revenue-sharing funds and the Tools and Resources: Some Thumbnail Sketches 87 implementation of environment and social mitigation management mea- sures through local action can be highly communication-intensive activi- ties (including, for example, local community radio and newsletters). Thus evaluation techniques are essential for ongoing improvements and for adapting management of the activities. Public opinion tracking studies. Tracking public views on issues such as public-private financing arrangements for hydropower and tariff reforms that ensure sustainable financing of environmental and social components is essential for the sustainability of the whole initiative. Randomized design, baselines, and surveys. A variety of survey techniques can calibrate and assess stakeholder attitudes on the high-value communica- tion aspects of the project. Properly designed and implemented, these surveys can provide watershed managers and operators of dams with valuable infor- mation, as well as feedback for sector-based strategies to manage and improve the development performance of other dams in the country. Operational support in the areas just described are available from the World Bank. The following are just some of the operational support activities offered by the Operational Communication Division, but they do indicate the type of support that the task managers and development practitioners responsible for hydropower projects and dam planning and management may require: • Communication-Based Assessment • Developing Communication Strategies • Communication for Behavior Change • Fostering the Participatory Process Communication Tools along the Project Cycle The World Bank’s Development Committee (DC) recommended that task managers, to improve governance and counter corruption in infrastructure, improve communication strategies and tools at each stage of the project cycle. According to the DC, it is important to develop an effective communication strategy that covers all phases of the project. The communication plan must provide for consistent messages to be conveyed to all of the relevant stakehold- ers: government officials in the implementing agency; contractors, suppliers, and consultants who may be involved in bidding on the project; members of civil society affected by the project; and (as appropriate) the local press. The role of the media (and civil society) may be especially important if the plan includes the use of publicity—both positive and negative stories—as a tool for reducing the level of fraud and corruption in Bank projects. The objec- tive would be to highlight both noteworthy achievements in quality, cost- effectiveness, and sustainability, as well as any incidents of alleged collusion, fraud, or corruption. Table 3.2 shows how to apply the communication tools 88 Opportunities in Dam Planning and Management Table 3.2. Mapping of Development Communication Tools along the Project Cycle World Bank project Infrastructure project cycle, stages cycle, stages Rehabilitation/uprating/ Project implementation Project preparation and Macro planning (CAS) Project identification Project preparation, appraisal, approval Project evaluation Strategic planning implementation Construction/ reoperation Operation design Phase 1 : Communication-based assessment Communication needs assessment ✓ ✓ ✓ Qualitative and quantitative ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ research: • Polling, perception studies, baseline studies, surveys • Interviews: client, project, sector, regional • Qualitative research: in-depth interviews and focus groups Sociopolitical analysis ✓ ✓ ✓ Stakeholder analysis ✓ ✓ ✓ ✓ ✓ ✓ Participatory techniques ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Media and local communication ✓ ✓ capacity assessment Phase 2: Communication strategy design Definition of communication ✓ objectives Situation and risk analysis (ranging from political to impoverishment ✓ ✓ ✓ risk analysis) Detailed communication strategies ✓ ✓ ✓ and action plans Phase 3: Communication implementation Tools to implement activities specified in the communication ✓ ✓ ✓ ✓ ✓ ✓ ✓ strategy: • Internal communication • Corporate communication • Advocacy communication • Public communication Five communication management decisions template Project-related information ✓ ✓ ✓ ✓ ✓ dissemination tools Tools and Resources: Some Thumbnail Sketches 89 Table 3.2. Continued World Bank project Infrastructure project cycle, stages cycle, stages Rehabilitation/uprating/ Project implementation Project preparation and Macro planning (CAS) Project identification Project preparation, appraisal, approval Project evaluation Strategic planning implementation Construction/ reoperation Operation design Conflict resolution tools ✓ ✓ ✓ ✓ ✓ Capacity-building tools ✓ ✓ ✓ ✓ ✓ Professional development and ✓ ✓ ✓ ✓ ✓ training: formal, informal, on-job Phase 4: Communication evaluation Traditional results and ex post evaluations (based on indicators of ✓ the ex ante evaluation) Participatory monitoring and ✓ evaluation Public opinion tracking studies ✓ Randomized design, baselines, and ✓ surveys Qualitative program and product ✓ evaluations Note: A communication strategy would be prepared for each stage. This table indicates the main use of the tools. CAS = country assistance strategy. just described along both the Bank project cycle and the infrastructure project cycle, as discussed in chapter 2 of this handbook. Each new stage requires a new communication strategy, repeating the four- phase process, and each successive strategy builds on the previous stage of the project. As issues change along the project cycle, the stakeholders’ views of risk may change and the stakeholders themselves may change or operate in differ- ent capacities. Anticorruption Tools This section is a primer on the anticorruption tools and techniques relevant to dam planning and management. This description of these tools is adapted from a detailed discussion of the tools by Transparency International.2 This section begins with the tools needed to embed anticorruption mea- sures in government reforms and development projects. It identifies the range 90 Opportunities in Dam Planning and Management of anticorruption tools, starting with the primary ones for dam projects, cor- ruption risk assessments (CRAs) and governance improvement plans (GIPs). Both the CRA and GIP require a clearly articulated communication compo- nent that reveals the engagement of all stakeholders to ascertain their percep- tions of corruption—its risk, type, impact, detection, and prevention. Thumbnail sketches of the CRA and the GIP are followed by those of other anticorruption tools organized by use at the national, sector, and project levels. Some of these tools would be incorporated in a GIP for dam projects. An illustrative mapping of these tools along the project cycle follows. Types of Anticorruption Tools Corruption Risk Assessment A corruption risk assessment is an explicit analysis of the functional areas in a development project or program to uncover vulnerabilities to corruption. With stakeholder participation, the assessment identifies major corruption risks, assesses their potential impact, and determines the adequacy of the control envi- ronment, using analytical communication techniques for risk assessment. Good practice suggests a structured process with full engagement of the range of stakeholders in the assessment of risks and public consultation on the results. Valuable outcomes include recommendations for additions to or modifications of an organization’s operational practices, procedures, systems, or controls, so that the risk of corruption is reduced. Governance Improvement Plans A governance improvement plan is a specific plan of action to (1) assess cor- ruption risks in a specific program or project; (2) identify anticorruption mea- sures involving all stakeholders in a collaborative process; and (3) outline a strategy for systematic implementation and monitoring as an integral part of the project. The GIP embodies a range of measures identified in the CRA process and multistakeholder review. It includes a communication strategy that incorpo- rates two components: an advocacy component directed at policy makers and their role in creating policy and regulation and a public participation compo- nent to engage the public and to seek support of the necessary partnerships to implement specific anticorruption measures. Infrastructure is classified as a sector at high risk for corruption. Although presently there are few examples of GIPs on hydropower projects, some elements of GIPs are at work. The road sector is perhaps the most advanced in providing examples of anticorruption and governance improvement plans, and they could be readily adapted to hydropower and dam planning and management. Other Anticorruption Tools To construct a more comprehensive approach, the fight against corruption in dams can be waged at the national, sector, or project level. Tools and Resources: Some Thumbnail Sketches 91 Anticorruption Tools Available at the National Level • National integrity system (NIS) • National integrity pact (NIP) • Access-to-information laws • Anticorruption laws • Lobbyist registration • Complaints and ombudsman office • Independent anticorruption agencies • Office for access to public information The sections that follow describe examples of the currently available tools applicable at the national level. National integrity system (NIS). This system approach takes the “Insti- tutional Pillars of Integrity” as a starting point and recognizes that societies become resistant to corruption when a whole range of institutions are present and function well. Organizations work together to develop good governance practices to fight corruption and take mutually reinforcing steps in their own spheres of influence or “shops.” The NIS identifies an explicit set of reinforcing measures that encourage public officials and companies to refrain from practices such as bribery. And it aims to give companies greater assurances that their competitors will also cooperate, so that those who adopt good governance practices are not penal- ized. Governments and government officials also have the assurance of a clear framework that protects them from dubious offers: they know clearly what form of behavior is not acceptable. The NIS introduces a monitoring system that provides for independent oversight and accountability, typically involving civil society. In 2006 an NIS was prepared for Japan.3 It looks at “the enormous public- works burden on Japanese local governments that renders these governments highly vulnerable to pressure for corruption in building dams.” As a tool, such country studies provide a starting point for identifying areas that require pri- ority action and a basis for stakeholders’ assessments of existing anticorrup- tion initiatives. In general, the NIS country studies help explain which pillars of the NIS have been more successful, why, whether they are mutually sup- portive, and what factors support or inhibit their effectiveness. National integrity pact (NIP). An NIP is a specific agreement reached between a government or a government department (at the federal, national, or local level) and bidders for a public contract. The agreement sets out the rights and obliga- tions for all sides: (1) no payment, offer, demand, or acceptance of bribes; (2) no collusion with competitors to obtain the contract; and (3) no engagement in such abuses while bidding for, approving, negotiating, or carrying out the contract. 92 Opportunities in Dam Planning and Management Access-to-information laws. Most countries have legislation providing access to information. The extent to which these laws are applied in practice, however, can vary considerably. Anticorruption laws. Most countries have some form of criminal legisla- tion related to corruption and bribery. The concern is to ensure specificity in the laws and the appropriate implementation mechanisms. Advocacy may center on introducing tighter and more specific anticorruption laws, enforcing the compliance of existing laws, or both. Lobbyist registration. Registering lobbyists is an effective tool for increasing the transparency around lobbying for specific projects and policies or lobby- ing to prevent new legislation that promotes transparency and accountability. Complaints and ombudsman office. This office enables the diverse voices of society to raise concerns about corrupt practices and to call for time-based actions to investigate and recommend measures to stamp out corruption in different sectors. Independent anticorruption agencies. These agencies provide indepen- dent oversight and capacity (with legal power) to investigate reported instances of corrupt behavior and practices at all levels, including political levels. Office for access to public information. This office establishes standards for public information and seeks to overcome problems with weak institutions and lack of resources. It makes critical documents on strategically important proj- ects available to any interested party; members of the public, civil society, and the media can view official information at these offices. Corruption thus becomes more difficult to pursue and to conceal. A central office does not replace the need for project-specific information offices, particularly those in the project locations. The sections that follow describe the currently available tools applicable at the sector level. Business principles for countering bribery. The principles are a practical tool for companies seeking a model or template to adopt a comprehensive Anticorruption Tools Available at the Sector Level • Business principles for countering bribery • Minimum standards • Codes of ethics • Public service disclosure of income and assets • Oversight committees • Independent audit function • Accountability benchmarks • Surveying and monitoring perceptions of corruption Tools and Resources: Some Thumbnail Sketches 93 antibribery program and to find a starting point for developing their own antibribery programs or providing a benchmark for existing ones. From the industry or private sector perspective, it is important that infrastructure actors work together and with other stakeholders groups. Transparency Interna- tional has witnessed many situations in which industry members have worked together. Minimum standards. Minimum standards can be developed and applied to needs assessment, design, preparation, and budgeting activities prior to the contracting process; to the contracting process itself; and to contract imple- mentation. Standards can extend to all types of government contracts (includ- ing procurement of goods and services); supply, construction, and service contracts (including engineering, financial, economic, legal, and other consul- tancies); privatizations, concessions, and licensing; subcontracting processes; and involvement of agents and joint-venture partners. Codes of ethics. Codes of ethics or codes of conduct are important guides to making decisions on complicated ethical issues. They provide the basis for an environment in which citizens are aware of the basic standards of behavior expected from public sector employees. Codifying standards of behavior is not by itself, however, sufficient to ensure ethical conduct by public officials. Public service disclosure of income and assets. Many countries have rules requiring public officials to declare their assets and wealth because disclosure reduces the chance of corruption. The purpose of public officials’ declarations is to identify what wealth is not fairly attributable to income, gift, or loan. The compilation demonstrates the wide range of approaches to restraining offi- cials’ undesirable conduct.4 Oversight committees. Sector-level committees can provide oversight on issues as diverse as awarding licenses to private power developers to implement- ing codes of ethics within the agencies that implement public procurement. Independent audit function. Formal audits of public and private project agencies conducted by independent entities help to prevent and detect cor- ruption. Public dissemination of audit information helps to build trust in the project. Prompt publication of audit reports ensures that their impact is undiminished. Accountability benchmarks. These benchmarks identify the main areas needing better accountability and formulate the questions at the core of the problem, allowing comparison of answers from public servants (and political levels) and monitoring of subsequent performance. Surveying and monitoring perceptions of corruption. Surveys at the national or sector level help to increase public awareness of the level of 94 Opportunities in Dam Planning and Management Anticorruption Tools Available at the Project Level • Governance improvement plans embedded in projects • Corruption risk assessments • Integrity pacts for public procurement • Project anticorruption system (PACS) • Minimum standards • Codes of ethics • Project compliance plans corruption in various sectors, such as hydropower development in the water sector, and to understand views on how to tackle corruption. The sections that follow describe the currently available tools applicable at the project level. Governance improvement plans embedded in projects. As detailed ear- lier, this specific plan of action (1) assesses corruption risks in a specific pro- gram or project, (2) identifies anticorruption measures involving all the major stakeholders in a collaborative process, and (3) sets out a governance improve- ment plan that will be systematically implemented and monitored as an inte- gral part of the project. Corruption risk assessments. As detailed earlier, this is an explicit assess- ment of the risk for corruption in a development project or program, using a range of communication techniques. Good practice includes an indepen- dent assessment of risks, public consultation, and a structured process to fully involve the main project stakeholders. Integrity pacts for public procurement. An integrity pact revolves around an agreement between a government or a government department (at the fed- eral, national, or local level) and all bidders for a public contract.5 The agreement sets out rights and obligations for all sides: (1) no payment, offer, demand, or acceptance of bribes; (2) no collusion with competitors to obtain the contract; and (3) no engagement in such abuses while bidding for, approving, negotiating, or carrying out the contract. The integrity pact also introduces a monitoring system that provides for independent oversight and accountability. Project anticorruption system (PACS). PACS is an integrated, comprehen- sive system to help prevent corruption on construction projects. The system comprises PACS Standards, which are anticorruption measures for construc- tion projects, and PACS Templates, which are the tools used to implement PACS Standards. Although PACS is designed as a project system, some modules (such as dis- closure, training, and rules for individuals) may be used by companies. PACS measures have impacts on all project phases, on all major participants, and at Tools and Resources: Some Thumbnail Sketches 95 various contractual levels. PACS may be a prerequisite for project approval, or it may be required by financiers as part of the funding package or by public or private sector project owners as a condition of participation in a project. Minimum standards. Like minimum standards at the sectoral level, mini- mum standards at the project level could be a component of the governance improvement plan. Codes of ethics. As at the sector level, codes of ethics could apply not only to procurement activities during project construction but also to the operation stage, during monitoring and evaluation and during the provision of services. Project compliance plans. Plans for dam projects are recommended by the World Commission on Dams (WCD), identifying all the major commitments needed for the social and environmental components of the project and for monitoring. Compliance on all aspects is reviewed with the key stakeholders and in public consultations as appropriate. The sections that follow describe examples of other anticorruption tools. Selection of Other Anticorruption Tools • Participatory budgeting and budget tracking systems • Citizen Report Cards as an aid to public accountability in service provision and access • Whistleblower protection • Public participation and education tools • Ethics training • Anticorruption radio spots and media campaigns Participatory budgeting and budget tracking systems. A budget or expen- diture tracking system can be used to report transparently on expenditures for programs and projects. Whether simple or more complex, these systems must make the information accessible and open for scrutiny. In one of the many practical illustrations of how these systems help to detect and prevent cor- ruption, in Sierra Leone a public expenditure tracking survey exposed overall discrepancies between money allocated to line ministries and money received at the grassroots level.6 The different components of dam projects offer con- siderable scope for budget tracking, including the expenditure on resettlement and compensation. Citizen Report Cards. This tool enables the beneficiaries of programs or proj- ects to report their exposure to corruption as an aid to public accountability in service provision and access. Indeed, Citizen Report Cards help to open chan- nels of communication between governments and their citizens. In Mongolia, for example, hotlines have been established to provide citizens with a means of reporting administrative-level corruption that affects them directly. Citizens are 96 Opportunities in Dam Planning and Management also now contributing to the corruption report cards being generated from the calls into the hotlines. The initial results of this pilot effort were publicized at the Press Institute, and they contributed to the Asia Foundation’s goal of advancing pride and integrity in the public and private sectors. Whistleblower protection. This protection is extended to any individ- ual, employee, former employee, or member of a business or government agency who reports misconduct to people or entities with the power and a presumed willingness to take corrective action. The misconduct is a viola- tion of a law, rule, or regulation, or a direct threat to the public interest such as fraud or bribe taking. The UN and the development banks such the European Bank for Reconstruction and Development (EBRB) offer whistle- blower protection.7 An employee who complies in good faith with her or his duty to report suspected misconduct and who discloses information is pro- tected from “pressure, retaliation or reprisal” in connection with the coop- eration. Protection extends throughout the disciplinary and appeal process, including guarding the reputation of the whistleblower. Such policies could be introduced into any government organization or company engaged in dam planning and management. Public participation and education tools. Public education builds public trust. Those delivering this education are participants in the political, social, and bureaucratic arrangements that monitor and coordinate anticorruption strategies. A variety of public information programs can be launched in con- nection with a particular project or program. Specific tools include public meetings, media campaigns, school programs, public speaking engagements, and publications. Ethics training. Professional staff and employees at all levels would receive training on business ethics and ethical practices for government workers. Ori- entation training is a first step toward increasing employees’ awareness, not only of the detrimental effects of corruption but also of the penalties. Anticorruption radio spots and media campaigns. These tools are part of public information and awareness programs. Mapping Anticorruption Tools along the Project Cycle Table 3.3 illustrates where the anticorruption tools just described are applied along both the Bank project cycle and the infrastructure project cycle, as discussed in chapter 2. Each tool has a communication component that is reflected in the overall project communication strategy. Tools and Resources: Some Thumbnail Sketches 97 Table 3.3. Mapping of Anticorruption Tools along the Project Cycle World Bank project Infrastructure project cycle, stages cycle, stages Rehabilitation/uprating/ Project implementation Project preparation and Macro planning (CAS) Project identification Project preparation, appraisal, approval Project evaluation Strategic planning implementation Construction/ reoperation Operation design National level National integrity system (NIS) ✓ ✓ National integrity pact (NIP) ✓ ✓ Access-to-information laws ✓ ✓ Anticorruption laws ✓ ✓ Lobbyist registration ✓ ✓ ✓ Complaints and ombudsman office ✓ ✓ ✓ ✓ Independent anticorruption agencies ✓ ✓ Office for access to public information Sector level Business principles for countering ✓ ✓ ✓ bribery Minimum standards ✓ ✓ ✓ ✓ ✓ Codes of ethics ✓ ✓ ✓ ✓ ✓ Public service disclosure of income ✓ ✓ ✓ ✓ ✓ ✓ and assets Oversight committees ✓ Independent audit function ✓ ✓ ✓ ✓ ✓ Accountability benchmarks ✓ ✓ ✓ ✓ ✓ Survey and monitoring perceptions ✓ ✓ ✓ ✓ ✓ of corruption Project level Corruption risk assessments ✓ ✓ ✓ ✓ ✓ Governance improvements plans ✓ ✓ ✓ ✓ ✓ ✓ ✓ embedded in projects Integrity pacts for public ✓ ✓ ✓ ✓ ✓ ✓ procurement Project anticorruption system (PACS) ✓ ✓ ✓ ✓ ✓ ✓ Minimum standards ✓ ✓ ✓ ✓ ✓ ✓ Codes of ethics ✓ ✓ ✓ ✓ ✓ ✓ Project compliance plans ✓ ✓ ✓ ✓ ✓ ✓ Other project-specific tools to incorporate in a GIP Participatory budgeting and budget ✓ ✓ ✓ ✓ tracking systems Citizen Report Cards as an aid to public accountability in service ✓ ✓ ✓ ✓ ✓ provision and access continued 98 Opportunities in Dam Planning and Management Table 3.3. Continued World Bank project Infrastructure project cycle, stages cycle, stages Rehabilitation/uprating/ Project implementation Project preparation and Macro planning (CAS) Project identification Project preparation, appraisal, approval Project evaluation Strategic planning implementation Construction/ reoperation Operation design Whistleblower protection ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Public participation and education ✓ ✓ ✓ ✓ ✓ ✓ tools Ethics training ✓ ✓ ✓ ✓ ✓ ✓ ✓ Anticorruption radio spots and media ✓ ✓ ✓ ✓ ✓ ✓ campaigns Note: A communication strategy is prepared for each tool. Project advocacy argues for national and sector measures on Bank-supported projects to help demonstrate good practice. CAS = country assistance strategy. Sustainability Tools Figure 3.2, which also appears in chapter 1 of this handbook, depicts a framework of process- and performance-oriented themes that are relevant to delivering sustainability in dam projects. The various themes and their supporting tools and techniques reinforce and overlap. Anyone viewing dams in the context of a wider development intervention will find that sustainability tools can help deliver the wide governance reforms needed to encompass dam planning and management and sustainable water resource management. As emphasized in this handbook, the governance and anticorruption theme is an integral part of the sustainability equation. Thus the anticorruption tools discussed in the previous section are part of the “tool kit” that infrastructure practitioners need to deliver sustainability. The sections that follow provide thumbnail sketches of a selection of existing and new tools to deliver each of these concepts. Each section begins by illustrat- ing the relevance of each element to advancing the sustainable performance of dams and the value that communication adds in implementation. These differ- ent aspects of sustainability are intertwined in the development and manage- ment of infrastructure such as dams. It is not enough to look at each aspect in isolation—effective communication ensures key linkages. The final section explains how these tools are mapped along the project cycle. Integrated Water Resource Management (IWRM) Tools The mission of the Bank–Netherlands Water Partnership Program (BNWPP) is to improve water security by promoting innovative approaches to integrated water Tools and Resources: Some Thumbnail Sketches 99 Figure 3.2. New and Old Sustainability Themes in Dam Planning and Management Process- IWRM Performance- Oriented Tools Principles & Reforms Oriented Tools Environmental Climate change assessment (mitigation + adaptation) Communication Integrated sustainability for sustainable Benefit sharing assessment infrastructure (monetary & nonmonetary) (dam-oriented) Local participation Dam safety & Physical & Partnerships performance Anti-corruption (prevention, detection, and prosecution) • Process-oriented tools • Performance-oriented tools • IWRM tools • Benefit sharing • Community participation • Climate change adaptation and partnership tools and mitigation • Environmental • Dam safety and physical assessment tools performance • Integrated sustainability assessment tools Source: Lawrence J. M. Haas. resources management, thereby contributing to poverty reduction. The Dublin- Rio principles for IWRM place the planning and management of dams in a river basin context. In theory and in practice, IWRM reforms achieve the following: • Reorient decision-making criteria for dam planning and management and involve a wider range of stakeholders in decisions about hydropower, including options on site selection, design, and operation (e.g., those with impacts on water allocation, quality, and use) • Offer a wide variety of IWRM tools that are directly relevant to dam plan- ning and management or at a minimum require linkage to IWRM tools • Increase the need for communication and dialogue mechanisms among dam practitioners, river basin entities, and various basin-level, river use, and water use committees What value can communication add? • The establishment of clear priorities and issues on which to engage IWRM stakeholders 100 Opportunities in Dam Planning and Management • A better understanding of the positions taken by the various IWRM stake- holders, of the project information they need, and of the methods of addressing their concerns • Structured processes to engage IWRM stakeholders effectively in activities ranging from hydropower ranking studies to dialogue about the design and operating parameters of reservoirs and their impacts on competing water uses, as well as ecological and cultural values • The deployment of conflict resolution tools where needed—for example, on water access and rights transformed by flow regulation and dam operations • More informed public briefs and timelier access to information to create conditions for collaboration and avoid unnecessary conflicts caused by lack of accurate information • An improved capacity to engage with and involve the media in linking the effects of dam operations to IWRM principles and water security concerns for all users The Global Water Partnership (GWP) is perhaps the most recognized net- work promoting IWRM adoption at the national, regional, and global lev- els. The IWRM Toolbox maintained by the GWP provides a compendium of good practice instruments and 50 different tools to facilitate priority actions to improve water governance and management.8 The IWRM Toolbox has three categories of tools: (1) tools to create the enabling environment—that is, laws, policies, incentives; (2) tools to build appropriate institutions and capacity within institutions; and (3) manage- ment tools to deliver different aspects of IWRM principles.9 For illustration, the GWP’s crosscutting management tools are listed in box 3.2. It is important to recognize the communication elements from advocacy to supporting partnerships. The BWP case study also illustrates the essential role of communication in the IWRM. Community Participation and Partnership Tools Most governments have explicit pro-poor policies that are part of their infra- structure development strategies linked to the Millennium Development Goals. Many countries have also instituted governance reforms to increase local participation in the decision-making processes in the water and energy sectors. Local participation is based on these tenets: • Local community participation is central to the design and implementa- tion of pro-poor measures in dam projects, responding to issues of voice, empowerment, and opportunity. • Local action is often central to plan, implement, and monitor the social and environmental sustainability components of dam projects. • Local action is needed to successfully introduce many anticorruption mea- sures such as Citizen Report Cards to track anticorruption behavior. Tools and Resources: Some Thumbnail Sketches 101 Box 3.2. IWRM Management Tool Classification C1. WATER RESOURCES ASSESSMENT—Understanding resources and needs C1.1 Water resources knowledge base C1.2 Water resources assessment C1.3 Modeling in IWRM C1.4 Developing water management indicators C1.5 Ecosystem assessment C2. PLANS FOR IWRM—Combining development options, resource use, and human interaction C2.1 National integrated water resources management plans C2.2 Basin management plans C2.3 Groundwater management plans C2.4 Coastal zone management plans C2.5 Risk assessment and management C2.6 Environmental assessment (EA) C2.7 Social impact assessment (SIA) C2.8 Economic assessment C3. EFFICIENCY IN WATER USE—Managing demand and supply C3.1 Improved efficiency of use C3.2 Recycling and reuse C3.3 Improved efficiency of water supply C4. SOCIAL CHANGE INSTRUMENTS—Encouraging a water-oriented society C4.1 Education curricula on water management C4.2 Communication with stakeholders C4.3 Information and transparency for awareness raising C5. CONFLICT RESOLUTION—Managing disputes, ensuring sharing of water C5.1 Conflict management C5.2 Shared vision planning C5.3 Consensus building C6. REGULATORY INSTRUMENTS—Allocation and water use limits C6.1 Regulations for water quality C6.2 Regulations for water quantity C6.3 Regulations for water services C6.4 Land use planning controls and nature protection C7. ECONOMIC INSTRUMENTS—Using value and prices for efficiency and equity C7.1 Pricing of water and water services C7.2 Pollution and environmental charges C7.3 Water markets and tradable permits C7.4 Subsidies and incentives C8. INFORMATION EXCHANGE—Sharing knowledge for better water management C8.1 Information management systems C8.2 Sharing data for IWRM Source: Global Water Partnership. 102 Opportunities in Dam Planning and Management • Local action and community participation are needed to translate other governance reform themes to action on the ground (e.g., IWRM reform, dam safety, or payment for ecosystem services of value to sustainable man- agement of reservoirs and dam-related assets). What value can communication add? • More effective integration of the overlapping aspects of community partici- pation for different governance reforms (e.g., anticorruption, IWRM, local revenue sharing) • Streamlined processes and reduced complexity in managing relations with local communities; clarity on accountability questions • Improved climate of trust, good will, and cooperation to reach agreements with local communities adversely affected by hydropower • Direct job creation and information on the new employment opportunities created by the project—empowerment + opportunity • Exchange of ideas and experience on community-driven development ini- tiatives linked to sustainable management of the hydropower asset, such as watershed management measures • Communication mechanisms that empower the voice and choice of local com- munities and see that community needs are clearly understood and acted upon • Help to build coalitions for local action to implement governance reforms. Many NGOs and development organizations offer a range of participant tools to use in dam planning and management, especially those components of projects that directly involve local communities either contributing to deci- sions or relating to environmental and social mitigation and management. Today, a variety of the approaches or frameworks for community participation incorporated into compensation and resettlement programs on dam projects are contextually defined. Increasingly, dam projects are including livelihood restora- tion programs (generally time-bounded) and actual long-term benefit-sharing mechanisms (benefit sharing is discussed later in this chapter). Apart from reset- tled people and resettlement host communities, involvement of the communities of traditional river users and land users in catchment is essential. The World Bank’s Participation and Civic Engagement Group focuses on the following themes for local community engagement in development proj- ects—themes that encompass dam projects: • Social accountability promotes the participation of citizens and communi- ties in exacting accountability from the primary institutional actors in the government and the private sector. • Enabling environment for civic engagement promotes conditions that enable civil society to engage effectively in development policies and projects over all stages of the project cycle. • Participatory monitoring and evaluation (PM&E) promotes the participa- tion of local beneficiaries in the monitoring and evaluation of projects and Tools and Resources: Some Thumbnail Sketches 103 programs, which is a key consid- eration in the sustainable perfor- Decide who mance of dams and governance and participates anticorruption. Establish Take • Participation at the project, program, action Participatory goals and policy levels promotes partici- monitoring & evaluation Share Develop patory processes and stakeholder results indicators engagement at the three levels.10 Analyze Gather results information Two illustrations of the supporting tools that help to indicate communi- cation needs follow. PM&E. A range of tools and methods are available for carrying out PM&E, but their relevance and applicability depend on the context. Anyone choosing PM&E approaches should ask several important questions. First, who leads and who fol- lows? Externally led or project staff and representatives of beneficiaries co-design and manage the entire cycle (as depicted in the figure above). Second, what is the purpose of PM&E? The answer is project planning and understanding and nego- tiating stakeholder perspectives or public accountability. Social accountability. These mechanisms are applicable within vari- ous contexts to build citizen voices and create spaces for the more proactive engagement of citizens and civil society with project authorities and with for- mal decision processes. These mechanisms include citizen advisory boards, vigilance committees, public interest litigation, public hearings, citizens’ char- ters, and the right to information. These communication tools and social accountability tools can be applied to budget questions, as noted in figure 3.3. Figure 3.3. Communication and Social Accountability Tools Applied to Budget Questions Budget formulation Performance Budget review Civic monitoring & analysis engagement Budget/Expenditure tracking 104 Opportunities in Dam Planning and Management For dam projects, there is considerable potential in involving communi- ties in social and environmental management budgets and also in local area development and revenue sharing. This involvement ensures that the social and environmental management components address the concerns that are relevant to local stakeholders and improve their perceptions of the social and environmental performance of the project. At the same time, these measures improve community relations and enhance the overall effectiveness of the dam as a development intervention. Environmental Assessment Tools A broad range of environmental assessment and management tools span the family of strategic environmental assessments (SEAs) and cumulative impact assessments (CIAs) used in up-front planning of the operation stage environ- mental monitoring and management plans (EMMPs) and comprehensive environmental management systems.11 Today, communication is generally recognized to be an essential part of environmental assessment and manage- ment tools. Effective communication is essential to identifying the environ- mental performance risk faced by all stakeholders, from the livelihood risks faced by local communities to the reputational risks faced by financing part- ners. These tools inform and invite participation: • Dam projects have and continue to be criticized for real or perceived lack of information access, public consultation, and meaningful engagement with affected groups on various types of environmental assessments from SEAs to EMMPs. • New tools such as environmental flow assessments (EFAs) can substantially contribute to the environmental performance of hydropower projects, but few people are aware of the value of these tools, understanding of them remains low, and they are confused with older practices. • The scope for advocacy to implement the current generation of good prac- tice environmental assessments is considerable. • Most environmental assessments have substantial explicit and implicit communication needs. Failure to provide effective two-way communica- tion undermines their value and credibility, which leads to controversy over dam projects or a suboptimal design, thereby increasing the risk exposure for all stakeholders. What value can communication add? • Improving the design and management of communication components for environmental assessments assisting with project approval and financial support. • Encouraging private sector lenders to undertake more effective, reliable, and accurate due diligence of the environmental components of dam projects. Tools and Resources: Some Thumbnail Sketches 105 • With more effective stakeholder engagement, identifying environmental concerns early, focusing efforts on the problems, improving the quality and acceptance of environment assessments, and reducing the risk of unneces- sary controversy. • Capturing and reflecting the local knowledge and best available information in environmental assessments and mitigation and monitoring programs. • Overcoming the technical language and jargon barriers that stand in the way of local understanding of and local inputs to assessments. • Applying relevant lessons from other projects in the country or region. • Conveying an understanding of environmental stewardship and the respective roles of the project authorities, government agencies, and local communities. A range of well-known but constantly evolving environmental assessment tools includes those for strategic and project-level work. At the sector, basin, or strategic level, they are strategic environmental assessments, cumulative impact assessments, and environmental flow assessments. At the dam project level, they are project-level initial environmental examinations (IEEs), envi- ronmental impact assessments (EIAs), and so on; environmental monitoring and management plans; and environmental flow assessments. A considerable body of literature describing these tools has been under development since the 1970s and 1980s. The CIA and EFA tools are the more recent in terms of refinement of techniques and their specific application to promoting sustainability in dam planning and management. The following description of EFA tools highlights their relevance at different stages of the project cycle and as communication-intensive in nature. Environmental flow assessment (EFA) and provision. An environmental flow (or ecological flow in some jurisdictions) is the provision of water within rivers and associated ground water systems in sufficient quality, quantity, tim- ing, and duration to maintain freshwater ecosystems and wetlands and their benefits where the river is subject to competing uses and flow regulation. Vari- ous international organizations have compiled tools for environmental flow assessment and provision, including organizations such as IUCN, World Wide Fund for Nature, World Bank, and the GWP. Figure 3.4 illustrates three general categories of EFA tools and applications: 1. Policy and regulatory tools. Policies and regulations on river flows, ranging from prescriptive to negotiated outcomes. 2. Quantification tools. Four main families of methods in order of increasing complexity and data intensiveness: • Index methods/look-up tables • Rating methods/desktop analysis • Functional methods/expert panels • Physical habitat models 106 Opportunities in Dam Planning and Management Figure 3.4. Environmental Flow Assessments in Integrated Water Resource Management Formulation of water allocation policy and regulatory provisions Representative applications Basin-scale planning and management for different timeframes Project-level Environmental flow infrastructure assessments assessment, design, and operational management Wetland and protected Employing a mix of area planning and site qualitative and management quantitative techniques appropriate to the application River restoration planning, monitoring, and evaluation Source: International Union for Conservation of Nature, Mediterranean Flows Pamphlet, http://iucn.org/places/ medoffice/en/en_wetland.html. 3. Broader frameworks. More in-depth procedures, incorporating one or more of the quantification tools into wider assessment frameworks: • Downstream Response to Imposed Flow Transformation (DRIFT) • Instream Flow Incremental Methodology (IFIM) The IFIM framework, which was developed in the 1970s in the United States, has undergone considerable transformation over the years. Legally mandated in a number of jurisdictions, it is an integral part of hydropower licensing proce- dures. The DRIFT framework, developed in South Africa, addresses all aspects of the river ecosystem. It employs four modules to construct scenarios and their ecological, social, and economic implications, which are developed in a collab- orative process with river users and community stakeholders. The DRIFT methodology is featured in the two case studies in appendixes A and B. In fact, both of these projects are pioneering efforts to implement environmental flow assessments, starting with pre-project baseline assess- ments and then linking monitoring to adaptive management of the reservoirs. In the BWP project, environmental flows were essential for river ecology and Tools and Resources: Some Thumbnail Sketches 107 maintaining the critical functionality of ecosystems, and the environmental flow releases were critical for maintaining water quality in downstream river reaches to support a variety of water use needs, including irrigation for high- value crops that are the mainstay of the local economy and offtakes for the municipal water supply, tourism, and recreational values. Communication platforms and dialogue mechanisms were critical at all stages of approval of the Berg Water Project and are maintained during the operational phase. Integrated Sustainability Assessment Tools Tools to identify sustainability in dam projects and to screen out controversial projects from the national inventory of potential sites at an early stage are continually evolving. Such assessment tools are now used as indicators of eli- gibility for financial support (e.g., requirements by the Organisation for Eco- nomic Co-operation and Development to support sustainable hydropower projects)12 or as rapid appraisal techniques to identify aspects of hydropower and multipurpose projects that require additional scrutiny or due diligence. Another dimension of sustainability is the financial sustainability of service provision and financing to meet ongoing environmental and social manage- ment commitments, linking to tariff reform policies. The present sustainable guidelines include the following: • Low-impact hydropower certification schemes are now available or pro- posed in North America and Europe. • The International Hydropower Association (IHA) has developed volun- tary protocol and sustainability guidelines endorsed by industry and IHA members. • Multistakeholder initiatives are under way to widen the acceptance and utility of the current sustainability guidelines such as those of the IHA. • Mechanisms, such as using a portion of project revenue to ensure the finan- cial sustainability of environmental and social management components of hydropower projects, exist, but they are not used widely (e.g., to fund catchment management also linked to revenue sharing). Communication will encourage public acceptance of tariff levels that inter- nalize the social and environmental costs of hydropower projects, leading to the financial sustainability of reliable levels of service and of the social and environmental management components of hydropower projects. What value can communication add? • An advocacy strategy to encourage the adoption of sustainability criteria and guidelines in hydropower ranking studies to screen out unsustainable projects early • Tools to evaluate what aspects of design need to be improved to enhance their sustainability 108 Opportunities in Dam Planning and Management • A clear message to the public on why it is important to internalize the envi- ronmental and social costs of hydropower projects and generation options in tariffs and processes, leading to a dialogue on the implications for sus- tainable tariffs • Voluntary sustainability assessments to identify problem areas in inde- pendent power producers (IPPs) or privately financed projects in settings where environmental standards may be weak or the institutional capacity to deliver national standards is low • A consensus on what criteria apply to assessing the sustainability creden- tials of proposed hydropower projects • Better feedback on what electricity consumers will accept or trade off in the selection of generation options and the effect on retail tariffs. Advice on how good sustainability scores can enhance the financing pros- pects for hydropower projects and access to innovative financing such as car- bon financing. This sustainability theme has three dimensions: (1) sustainability protocols and guidelines (for hydropower and dam projects generally); (2) financial sus- tainability of operations for service provision; and (3) physical performance sustainability of hydropower assets and dam infrastructure. Sustainability Protocols and Guidelines The International Hydropower Association took the industry lead in devel- oping protocols and guidelines for hydropower. Other low-impact certifica- tion tools are available. Some existing and potential future applications of protocols and guidelines are to score projects against the guidelines to evalu- ate a portfolio of projects, identify areas requiring greater attention or due diligence, establish the eligibility of projects for loan financing for different agencies, evaluate eligibility for carbon financing, and certify projects for green financing labeling. Each of these applications needs communication support. Sustainable Operations The financial sustainability of existing and planned hydropower is important from all perspectives—that is, those of the operators, government, and elec- tricity consumers. Two aspects are critical: (1) financially viable operations and (2) sustainable financing of environmental and social management com- ponents to meet commitments. The tools are generally part of the wider set of financial and economic evaluation tools and tariff evaluation tools. From a communication perspec- tive, a central issue is to provide clear and consistent messages to stakehold- ers and electricity consumers about the need for tariffs to enable financial sustainability. Tools and Resources: Some Thumbnail Sketches 109 Physical Sustainability Proper maintenance is central to ensuring the smooth performance of exist- ing structures and equipment on a day-to-day basis. However, it cannot fully eliminate the aging process to which all large infrastructure projects (such as bridges, roads, buildings, ports, and dams) are subjected. It is therefore neces- sary to occasionally undertake rehabilitation projects in order to avoid both lower revenues and higher operation and maintenance costs.13 Figure 3.5 illustrates how the performance established at the commission- ing of a project continues for a number of years until it begins to deteriorate. The rate and level of the duration depend on project-specific circumstances. In certain types of projects in which, for example, live storage is lost over time, the project may become uneconomic. If the project is not maintained, failure is a risk (see section on dam safety tools later in this chapter). Otherwise, restoration works can maintain the project at or near its original performance levels. Depending on the situation, hydropower projects can also be uprated. Beyond that, there is room for nonstructural optimization to improve per- formance, such as how the hydropower project is operated in the grid system. As the WCD has reported, nonstructural optimization can increase performance by 15 percent or more, but the opportunities are case-specific. With physical sustainability, communication again comes into the pic- ture: (1) it involves stakeholders in decision processes in the same way they Figure 3.5. Performance at Commissioning Performance Nonstructural optimization Uprating Restoration to “as new” level and life extension (rehabilitation) Failure? Initial Commissioning Restoration and uprating Time implementation Source: Lawrence J. M. Haas. 110 Opportunities in Dam Planning and Management participated in the decisions about the selection, design, and implementa- tion of the original project; (2) it offers opportunities to enhance the social and environmental performance at the same time as the technical aspects; and (3) it reflects the other governance themes discussed that contribute to sustainable hydropower development. Benefit-Sharing Tools Benefit sharing is increasingly attracting attention worldwide as a uniquely powerful, practical, and adaptable management tool. It underpins the kinds of partnerships needed to genuinely involve people in the development decisions that affect them and to put IWRM principles for the sustainable management of large dams into practice. Benefit sharing occurs at different levels, from sharing between riparian states to sharing national benefits with basin and dam-affected populations and river users. Some considerations follow: • Many observers argue that benefit sharing is a necessary condition for multi- country cooperation on international rivers. By focusing on the division of benefits that derive from water use, not the physical allocation of water, planners can identify substantive mutual gains.14 • Local benefit sharing has three forms: (1) equitable sharing of infrastruc- ture services; (2) nonmonetary benefits such as enhanced access to natural resources to replace the loss or transformation of access before the project; and (3) monetary forms of revenue sharing with the local community or the wider basin community that hosts the project. • Many countries now have legislation in which local communities that give up their land entitlements or access to natural resources receive a monetary share of the project revenues, but revenue sharing is not yet common prac- tice. In some countries, revenue sharing funds local action for sustainable management of the dam assets such as tree planting in headwater forests or payment for ecological services, which have mutual benefits for both the local communities and dam operations.15 • The design and implementation of benefit-sharing measures have greater and different communication needs—indeed, much greater than those for compensation and resettlement stages—and require long-term com- munication capacity building. Rampant corruption or abuse of power in the administration of revenue sharing can seriously undermine public confidence. What value can communication add? • Offering structured processes for dialogue with riparian states or local communities on the design and set-up of benefit-sharing measures • Linking the dialogue on benefit sharing with the community dialogue on the social and environmental management components of the dam project, Tools and Resources: Some Thumbnail Sketches 111 giving new dimension and meaning to partnership philosophies and meet- ing expectations • Integrating benefit sharing into the regular local development processes and ensuring that the government will not reduce the regular local develop- ment entitlements of those people anticipating benefit-sharing programs • Developing a clear sense of corruption risks and vulnerabilities and a clear sense of social accountability needs and achieving a consensus on how to tackle the concerns raised and effective action plans • Advocating more effectively at the sector or regulatory levels to introduce benefit-sharing policies and improve understanding on how they apply to hydropower projects • Enabling the use of community-driven development (CDD) approaches and the use of revenue-sharing funds according to beneficiary preferences (bottom-up and not top-down) • Enabling local communities to exchange information, ideas, and approaches to maximize the benefit of revenue-sharing funds • Establishing mechanisms such as trusts and setting up representative boards for governance to ensure full local ownership and local manage- ment responsibility Benefit sharing has recently come to the forefront of international thinking about ways to develop and manage large dams sustainably and distribute the benefits and costs more equitably within society.16 Sharing benefits equitably is a way to deliver value for all stakeholders, as well as a practical approach to catalyzing and funding local actions that join together many strands of water governance reform and sustainable thinking within the IWRM framework. Benefit-sharing mechanisms reinforce social equity in infrastructure strategies and promote sustainability rather than narrowly optimize dams as physical assets that deliver water and energy services. Many countries now have policies under which local communities that give up their land entitlements or access to natural resources receive a monetary share of the project revenues, but examples are still few and far between. In Vietnam, sustainable development is a central theme of the 2004 Electricity Law. It is defined as “development that meets the needs of the present gen- eration without compromising the ability of future generations to meet their own needs, on the basis of a close and harmonized combination of economic growth, assurance of social advancement and environmental protection.”17 The general principles of benefit sharing apply equally to sharing between riparian states and sharing between the national and local levels.18 Three broader approaches can be taken to sharing the national benefits of dam developments with local communities and river basin populations. First, in equitable sharing of project services, local populations, as target beneficiaries, receive equitable access to the water and energy services produced by dam projects to support their development and welfare opportunities.19 Second, in nonmonetary forms 112 Opportunities in Dam Planning and Management of benefit sharing, the target beneficiaries receive entitlements giving them access to other natural resources or support to pursue other forms of livelihood and welfare that offset the permanent loss of or reduction in access to land or water resources caused by the dam.20 And, third, in revenue sharing, targeted beneficia- ries share part of the monetary benefits generated by the project, typically in the form of a portion of the revenue from bulk electricity sales or bulk water sales on an annual basis. These arrangements are generally maintained over the economic life of the dam project. They commence after the project becomes operational. Other forms of benefit sharing may begin during the project implementation stages, which can span several years. These forms include investments to maximize local employment in the construction workforce and local supply of goods and services to the project, as well as investments in physical infrastructure such as local roads (e.g., those that increase a community’s accessibility to agricultural markets or, for villages near reservoirs, to health care) and other public services that have sustainable long-term benefits for communities. The notion of local benefit sharing goes beyond a onetime compensation payment and short-term resettlement support for displaced people. It treats both displaced people and the communities that host the hydropower project and give up land or access to other resources as legitimate partners in the proj- ect and first among its beneficiaries. The supporting tools include advocacy tools for legislation that enables the establishment of benefit sharing, community participation tools, social accountability tools, and tools that support community-driven development approaches. These tools are inherently participatory and communication- intensive in nature. Climate Mitigation and Adaptation Tools Climate change has many implications for the provision of water and energy services and for hydropower development from two perspectives: that of miti- gation (i.e., reducing the emission of greenhouse gases in electricity genera- tion) and that of adaptation (i.e., adapting dam delays and other hydropower structures and water resource systems to increasing climate variability and extremes). Adaptation and mitigation raise the following needs: • On the mitigation side of the equation, hydropower offsets thermal green- house gas (GHG) emissions, but the potential for reservoir emissions should be taken into account and subtracted. On the adaptation side of the equation, drought and flood extremes need to be factored into dam plan- ning, design, and management in transparent and explicit ways. • The combined effects of climate variability in terms of changes to the hydrological cycle and the loss of the hydrological contribution to ecosys- tems transformed by dam operations need to be better understood and the best available information applied. Tools and Resources: Some Thumbnail Sketches 113 • Opportunities to access international financing sources for carbon financ- ing are available for hydropower. However, these tools are still nascent and have high transaction costs. Controversy over the eligibility of hydropower remains, along with a lack of clarity, particularly on how storage projects are treated. Operational tools also need to be revamped to address, for example, impacts on the “fill vs. spill” dilemma and planning for energy reliability (in times of drought) and to introduce sediment management strategies to cope with accelerated soil erosion and reservoir sedimentation. What value can communication add? • Better understanding of the questions surrounding climate change adapta- tion and mitigation relevant to the project and a consensus on what actions to reflect in it • Better local participation in climate vulnerability and the risk assessments needed to factor into strategic planning and project design activities • Clearly structured processes for an informed dialogue with national and international stakeholders on the climate issues that arise on the project • Ability to mobilize efforts to deal with any problems that may arise with the application for or use of carbon financing tools to enhance the sustainabil- ity of the project (e.g., Clean Development Mechanism eligibility, registra- tion, or selling carbon credits to third parties) • Tapping previous experience and in-country expertise to exchange infor- mation and to understand the opportunities, complexities, and limitations of carbon trading • Better links between the national scientific community involved in fore- casts of climate variability and extremes and practitioners involved in dam planning and management • Ability to inform national and local stakeholders of progress in securing carbon financing support and decisions on the use of funds • Strategy to inform the public and special interest groups on how projected climate variability and extremes are taken into account in the project iden- tification stage and in the design and operating strategies of the project. A variety of tools are being developed to address the risks to the sustainable performance of dams arising from climate variability. Many tools for climate mit- igation and adaptation are directly relevant to the water sector.21 Some specific tools are appropriate for hydropower, focusing on drought and flood extremes, including vulnerabilities from a planning and design perspective, from an opera- tional perspective, or from an environmental or water regime perspective.22 Proactive and planned climate change adaptation is a relatively new chal- lenge in dam planning and management. The need to retool practices and adjust design criteria is generally recognized by dam practitioners—for exam- ple, the impact of the probable maximum flood (PMF) on the design and 114 Opportunities in Dam Planning and Management capacity of spillway structures and the storage capacities needed to respond to changes in long-term flow, seasonal variability of flow, and seasonal changes in demand. Operational tools also need to be revamped to address, for example, the “fill vs. spill” dilemma, to plan for energy reliability (such as in times of drought), and to introduce sediment management strategies to cope with increased res- ervoir sedimentation. A variety of communication tools are needed to link actions to wider river basin management reforms and processes. And water users should receive help in “climate proofing” ecological and dam services. For example, drought management policies could be introduced that take into account extractions from reservoirs, water courses, and downstream reservoir releases in order to maintain the critical functionality of wetlands or other vulnerable areas dur- ing deeper and more prolonged periods of drought. The following approaches and tools could be used as well: • Information providers to help in risk assessment: • For spatial-temporal hydroclimatic state variables: NAPA Platform, PRECIS23 • To assess hydrological impacts: computer-based models such as DGIS or ORCHID project design tools • Screening tools and processes to support local adaptation to climate change: • Integrating climate change considerations and adaptation into current risk management strategies and planning processes such as impact and vulnerability assessments at varying levels and scale • Using tools to assess the vulnerabilities of the social and environmental components of dam projects to climate change—for example, CRiSTAL24 • Using guidebooks on adapting to climate changes such as those by the United Nations Development Programme (UNDP) and the U.S. Agency for International Development (USAID) Climate Change Mitigation The potential role of hydropower in reducing GHG emissions from the power sector is well recognized. Methodologies and tools are now available to help quantify the relative value of dams in mitigating GHG emissions and to facili- tate maximizing the contribution. They include: • Electricity generation portfolios and minimum portfolio standards in stra- tegic planning (linked to emission reduction targets) • Carbon trading, including the United Nations Framework Convention on Climate Change (UNFCCC)-sponsored Clean Development Mecha- nism (CDM) for trading certified emission reductions (CERs) measured Tools and Resources: Some Thumbnail Sketches 115 in terms of CO2-equivalent verified emission reductions (VERs), which do not fall under the CDM • Baseline carbon flux assessments (as part of project environmental impact assessments) • Reservoir emissions mitigation and monitoring (various computer and field measurement techniques) • Methodologies for assessing the carbon offset and the potential of alterna- tive generation technologies in simple and more complex power systems (e.g., as evolving in the CDM process)25 Communication Particularly in water-stressed basins, it is important that an open communi- cation process is established with stakeholders to link the dam management strategy and associated catchment management measures to the risks facing water users, consumers of dam services, and basin communities associated with increased climate variability and extremes. The BWP case study described in appendix A notes that South Africa has taken the position that the IWRM framework captures many measures that would help river basins and dams adapt to climate change. Climate change is still a relatively new field. In order to move forward, cop- ing with climate change and creating local capacity, it is important to commu- nicate these issues in the partnerships between the scientific community and the users of the information, and also within the dam industry itself. Dam Safety Tools Dam safety has received considerable attention in the past few decades. New regulatory frameworks and standards for dam safety have been or are being introduced or reinforced in most countries, especially in transitional econo- mies. Dam safety issues and remedial measures are linked to other sustainabil- ity and governance reform themes (e.g., IWRM, anticorruption, sustainable finance, and climate change). Various factors such as the aging population of dams, the highly variable design standards of old dams, and the increased variability in the climate system (flood risk and higher PMF estimates) have brought attention to dam safety issues. Some observations about dam safety programs follow: • Many of the tools for dam safety programs require information exchanges, technical cooperation, and coordination among dam owners, regulators, and dam safety officials. • Dam safety programs also incorporate agency and public response pre- paredness measures. 116 Opportunities in Dam Planning and Management • Although dam safety is important in new dams, the bulk of the work at present is in dealing with the existing dams. • Dam safety programs have a variety of communication support needs for dialogue and information sharing among professional agencies and with local communities. What value can communication add? • Effective engagement of technical bodies and regulatory bodies in dam safety programs relevant to the project • Better understanding of risks and how local communities and agencies responsible for emergency preparedness perceive them • Structured processes for an informed public dialogue on dam safety issues • Consensus on priority investments in dam safety for existing dams using inclusive and participatory processes; information packages to inform the public about the dam safety measures adopted • Effective engagement with the local communities on emergency prepared- ness programs and awareness of response measures in the event of an emer- gency event • Dialogue mechanisms that maintain local and public confidence in the safety and integrity of the dam structures and emergency preparedness. Typically, dam safety programs utilize some tools that need varying degrees of communication support. One example of dam safety tools is Dam Safety Program Management Tools (DSPMT), an information collection and man- agement system used by U.S. federal and state dam safety program managers to provide as-requested and periodic information on local dam safety, pro- gram needs, and accomplishments within each organization’s jurisdiction.26 The DSPMT is a set of interactive software programs that can serve as a resource to dam safety data owners, managers, and data providers. It currently includes four distinct functional areas: (1) Dam Safety Program Performance Measures (DSPPM);27 (2) NID Electronic Submittal Workflow; (3) Palm-based Inspection Checklists; and (4) the DSPMT Web site (http://www.safedams.org). The tools applied on an individual project will depend on the outcome of the initial dam safety risk assessment. The project-specific communication support needs can be inferred from the type of training offered in a comprehensive dam safety program: • Technical training • Conducting continuing education courses for dam safety engineers and technicians Tools and Resources: Some Thumbnail Sketches 117 • Collecting and posting information about technical training available from other organizations and agencies • Sponsoring state personnel to attend continuing education • Support for state programs • Disseminating public and dam owner awareness tools for state dam safety programs • Compiling guidelines for dam safety programs • Offering peer review services to help states recognize their weaknesses and improve their programs • Partnering • Strengthening the cause by bringing together organizations and agen- cies involved with dam safety • Working jointly with other organizations on projects to improve dam safety • Public awareness • Sponsoring public awareness workshops • Educating state and federal lawmakers about the need for strong dam safety programs • Working with the media to spread the message about the importance of dam safety to the public • Information exchange • Maintaining a clearinghouse of information on dam safety • Reaching the public through the Internet • Providing research services • Producing educational publications and periodicals and statistical analyses • Networking • Offering avenues for communication between dam safety professionals • Promoting and organizing regional and state meetings to bring together dam owners and regulators • Bringing together people to present a strong message on dam safety to lawmakers and to the public. Sustainability Tools along the Project Cycle Table 3.4 illustrates where the sustainability tools discussed previously are applied along both the Bank project cycle and the infrastructure project cycle, as discussed in chapter 2 of this handbook. 118 Opportunities in Dam Planning and Management Table 3.4. Mapping of Sustainability Tools along the Project Cycle Stage of project cycle at which tools are applied 3, some Sector 2, more strategic 1, most Macro Planning/ Project Construction Operation level regulation preparation phase phase 1. IWRM tools Improving the enabling environment Creating the institutional environment Management tools 2. Community participation tools Social accountability Enabling environment for civic engagement Participatory monitoring and evaluation Participation at the project, program, and policy levels 3. Environmental assessment tools SEAs (sector, basin, etc.) IEE, EIA, etc. Environment management, mitigation, and monitoring Environmental flow assessment 4. Hydropower sustainability tools Sustainability protocol Sustainability guidelines 5. Climate mitigation and adaptation tools Emission reduction tools Adapting dams 6. Benefit-sharing tools Revenue sharing Enhancing resource access entitlements Equitably sharing project outputs 7. Dam safety tools Dam safety regulation Dam safety programs Project-specific tools Tools and Resources: Some Thumbnail Sketches 119 Notes 1. Institutional communications can encompass internal communications. 2. Transparency International, http://www.transparency.org/tools. TI has successfully applied some of these tools to hydropower projects and water infrastructure services in various countries in partnership with government agencies, developers, utilities, and civil society organizations. 3. The Transparency International Country Study Report of Japan is part of a 2006 series of national integrity system country studies of East and Southeast Asia, http://www.trans- parency.org/content/download/14728/156321/file/japan_r.pdf. 4. World Bank, http://go.worldbank.org/QXV28CEF90. 5. On April 17, 2006, Oil and Natural Gas Corporation became the first Indian company to sign an integrity pact with Transparency International. The pact was signed by com- pany chairman and managing director Subir Raha and Admiral R. K. Tahliani, former chief of naval staff and chairman of TI India. The company had used the pact since July 2005. Developed by TI, the integrity pact is a tool to prevent corruption in public con- tracting. Transparency International, TI Watch, May 2006. 6. For details on this system, see Anti Corruption Commission, Republic of Sierra Leone, http://www.anticorruption.sl/addressing_corruption.htm. 7. See http://www.whistleblower.org/template/index.cfm and http://www.ebrd.com/ about/strategy/general/whistle.htm. 8. Global Water Partnership, “ToolBox: Integrated Water Resource Management,” http:// www.gwptoolbox.org. 9. Ibid. 10. World Bank, Participation and Civil Engagement, “Tools and Methods,” http://web. worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTSOCIALDEVELOPMENT/EXTP CENG/0,,contentMDK:20509330~menuPK:1278210~pagePK:148956~piPK:216618 ~theSitePK:410306,00.html. 11. Examples are SEAs at the basin or sector level, project environmental impact assess- ments (EIAs), environmental flow assessments (EFAs), EMMPs, and CIAs. 12. See the 2003 Recommendation on Common Approaches on Environment and Offi- cially Supported Export Credits [C(2003)236, as amended by Council in C(2004)213] and updated in 2005, http://webdomino1.oecd.org/olis/2005doc.nsf/43bb6130e5e86e 5fc12569fa005d004c/db22f47098127953c1256fb3005ec629/$FILE/JT00179362.PDF. 13. Laurent Bellet, Jean-Michel Devernay, Donal O’Leary, and Alessandro Palmieri, “Frame- work for Policy and Decision Making on Dam and Hydro Plant Rehabilitation and Uprat- ing,” http://www.un.org/esa/sustdev/sdissues/energy/op/hydro_bellet_paper.pdf. 14. T. Yu and H. Winston, “Benefit Sharing in International Rivers: Findings from the Sen- egal River Basin, the Columbia River Basin, and the Lesotho Highlands Water Project,” Report No. 46456, Africa Region Water Resources Unit Working Paper 1,World Bank, Washington, DC, 2008, http://go.worldbank.org/U87VJHWH20. 15. Examples of these benefits are capturing cross-sectoral synergies in land management, local income generation, and sustainable management of dams as physical assets; extending the operating lives of reservoirs by planting trees in headwater areas; or shift- ing to agricultural and livestock grazing practices that combat desertification, soil ero- sion, and sediment processes in river catchments—multiple benefits. 16. Beyond the dam sector, benefit sharing is actively pursued today in other natural resource extraction and transformation sectors. The numerous models from the mining, petroleum, and forestry sectors range from nationally administered rev- enue funds that target improvements in public services to affected communities, to 120 Opportunities in Dam Planning and Management revenue-sharing contracts between companies (or state production enterprises) and local communities. 17. Article 4 of the Electricity Law (2004) calls for developing a “sustainable power sector based on optimal development of all sources.” Article 1 of the revised Law on Environ- mental Protection (2005) that came into effect in July 2006 defines sustainable devel- opment for all sectors of the economy. 18. Multicountry arrangements are typically more complicated because of their cost- sharing dimensions, varying benefits for each country, and the decades-long agree- ments that can ensue if political relations between states are complex. 19. For electricity services, a range of measures can be considered such as mandatory elec- trification of resettlement communities; priority in rural electrification programs for connection or improved levels of service; financial assistance for individual household service connections, and possibly energy-efficient appliances such as lighting; or pref- erential electricity tariffs for a stipulated period of time. 20. Nonmonetary benefits can be as valuable to local communities as the monetary bene- fits, especially measures that empower and build local capacity for management of natural resources and access to ecosystem services. But they may also have an indirect cost. The cost may be minor, such as deferment of potential local tax revenue when local fishermen are granted preferential licenses for reservoir fisheries, or they may have a more measurable impact on overall project economics, such as when water is released from reservoirs to maintain recession agriculture downstream (though the net development and sustainability gain remains positive). 21. United Nations Framework Convention on Climate Change, http://unfccc.int/files/ adaptation/methodologies_for/vulnerability_and_adaptation/application/pdf/water_ sector_tools.pdf. 22. Canadian Climate Impacts and Adaptation Research Network, “Hydropower and Cli- mate Change: A Workshop Report,” 2006, http://www.c-ciarn.ca/pdf/hpccwksreport .pdf. 23. For more details, see United Nations Framework Convention on Climate Change, http://unfccc.int/adaptation/methodologies_for/vulnerability_and_adaptation/ items/2674.php. 24. Project-based tools are piloted for undergoing pilot studies in Nicaragua, Mali, Tanza- nia, and Sri Lanka in sectors such as water resource management, infrastructure, and natural resource management. The tools deliver vulnerability and livelihood profiles, as well as details for project modification. For more information, see International Institute for Sustainable Development, http://www.iisd.org/security/es/resilience/cli- mate_phase2.asp. 25. United Nations Framework Convention on Climate Change, http://cdm.unfccc.int/ Panels/index.html. 26. For more information, go to http://www.safedams.org/ and http://www.fema.gov/ plan/prevent/damfailure/information.shtm. 27. The DSPPM is made up of the following modules: DSPPM 1 - Dam Safety Program Management Authorities and Practices; DSPPM 2 - Dam Safety Staff Size and Relevant Experience; DSPPM 3 - Inspections and Evaluations; DSPPM 4 - Identification and Remediation of Deficient Dams; DSPPM 5 - Project Response Preparedness; DSPPM 6 - Agency and Public Response Preparedness; DSPPM 7 - Unscheduled Dam Safety Program Actions. Appendix A Berg Water Project The Berg Water Project (BWP), which consists of the Berg River Dam and the supplemental diversion scheme, is designed to augment the raw bulk water supply to the greater Cape Town metropolitan area in the Western Cape Region of South Africa. The BWP captures and stores winter runoff from the mountainous upper reaches of the Berg River basin. The runoff is then trans- ferred to the existing to Western Cape Water Supply System (WCWSS) to help meet 18 percent of the urban and irrigation demand during the dry summer periods. The river diversion project must also release enough water into the downstream of the Berg River system for a statutory “reserve” flow to meet the basic human and ecological needs and seasonal water needs of a variety of downstream river users and for water quality management. Looking through the lenses of governance, sustainability, and communica- tion, the BWP is an interesting case study in several respects: • The BWP was the first major bulk water transfer scheme approved in the post-1994 era under South Africa’s progressive water legislation, and was the largest water project in the country at the time (see box A.1). The design parameters and the decision to build the BWP were the first major test of the new legislation. • The BWP richly illustrates a contextual translation of progressive macro policy reforms first into an infrastructure strategy and then into a project— and the challenges this translation entails. Appendix A is adapted from Lawrence J.M. Haas, Leonardo Mazzei, Donal T. O’Leary, and Nigel Rossouw, Berg Water Project: Communications Practices for Governance and Sustainability Improvement, World Bank Working Paper No. 199 (Washington, DC: World Bank, 2010). 121 122 Opportunities in Dam Planning and Management Box A.1. Berg Water Project: Its Genesis The BWP was part of a multitrack drive to improve water security for over 3 million people served by the integrated Western Cape Water Supply System (WCWSS), where combined demand from urban and agriculture users will exceed the water yield available from conventional water resources in the area well before 2020. The initial project planning occurred during fundamental governance trans- formations in South Africa in the 1990s. The project was eventually approved in 2002, but only after exercises in cooperative governance involving interested and affected parties (I&APs) in three parallel public processes (1) on assigning priority to water demand and supply reconciliation options in the Berg Water Management Area, (2) on the project environmental impact assessment (EIA), and (3) on Cape Town’s targets and investment plan for water services improve- ment, a statutory requirement. Cape Town residents were subject to stringent curbs in water use during the drought of 1998–2000 when these decisions were in process. This situation had an effect on public perceptions about water security and deeply polarized views about how to deal with scarcity. Many environmental nongovernmental organi- zations and right-based civil society organizations were firmly against the BWP, contending that demand management was a better investment and the only envi- ronmentally sustainable solution. The City of Cape Town argued that demand and supply measures were complementary and that both were urgently needed. The BWP was approved by the South African Cabinet conditional on Cape Town taking steps to ensure a 20 percent reduction in projected water demand by 2010. The Trans-Caledon Tunnel Authority (TCTA), a state-owned entity mandated to implement raw bulk water infrastructure in South Africa, began construction in 2004, and the project became operational in 2008. • As the formative Catchment Management Authority (CMA) and its sup- porting water user entities gradually become functional, the BWP prom- ises further insights on adapting the operation of a dam to a catchment management strategy founded on integrated water resource management (IWRM) principles and competing ecological, economic, and social values. Macro Planning and Project Preparation Stages In 1966 South Africa’s new constitution introduced the notion of cooperative governance to involve people in the development decisions that affect them. The constitution’s principles were translated into South Africa’s much acclaimed water laws by the Department of Water Affairs and Forestry (DWAF) in open processes engaging all levels of government, civil society, and the private sec- tor. In keeping with the emerging international consensus on water governance, IWRM, and sustainability principles, South Africa separated the responsibilities for water resources management and water services provision and introduced a new system to allocate water equitably. Appendix A: Berg Water Project 123 A retrospective look at the 14-year strategic planning process that identified the BWP and eventually led to its approval in 2002 reveals that contemporary political, economic, cultural, and technical concerns had to be balanced before a political decision on the dam could be made—especially because this process unfolded during a period of fundamental political transformations. The decision to proceed with the BWP was reached only after the partici- patory planning processes, which received considerable media coverage, led politicians to judge that a “sufficient consensus” had been reached. The first enabling step was to move the comprehensive options assessment “upstream” in the planning system. This move was accomplished in public participation processes (PPPs) in the mid-1990s built around the strategic water demand- supply reconciliation analyses of the Berg Water Management Area (WMA). Through the PPPs, representatives of stakeholder interests participated in set- ting the criteria to select options and the actual evaluation of options. But it was more than an options assessment. Consistent with the new water laws, the minister for water affairs and forestry advised the National Parliament in 1998 that a positive response to the request by the City of Cape Town (CCT) to proceed with the BWP would be predicated on three actions: (1) a review of Cape Town’s water demand projections, (2) a clear indication of the commitment of the CCT and transitional local and district councils to demand-side water management, and (3) better technical information on demand management potential and actual budgetary support for water conservation/water demand management (WC/WDM) programs. This pro- cess placed the final BWP decision in a wider sustainability context. The CCT proceeded to prepare its first water services development plan (WSDP), which incorporated an assessment of demand-side management investments, including the technical, public information and involvement, and tariff measures. In parallel, DWAF moved forward with the project prepa- ration studies. The environmental impact assessment (EIA) featured multi- stakeholder processes to endorse key project design and operating parameters, with media coverage. In 1999 the Department of the Environment and Tour- ism (DEAT) issued the Record of Decision (ROD) approving the project EIA. The photos in figure A.1 show the two main physical elements of the BWP during construction in 2006. The 1999 ROD was unique in the governance-sustainability-communication (G-S-C) linkage in that it set explicit conditions to ensure the ongoing partici- pation of interested and affected parties (I&APs) in the governance arrange- ments to implement the BWP. A multistakeholder environmental monitor- ing committee (EMC) was organized around a comprehensive environmental management plan (EMP). Its integral social management aspects ensured that local communities would benefit from project jobs and other employ- ment. The ROD also stipulated that adaptive management of downstream releases was required during the operation phase, involving multistakeholder processes to define and review the monitoring. In fact, the ROD conditions 124 Opportunities in Dam Planning and Management Figure A.1. Berg River Dam and Supplement Scheme near Franschhoek, South Africa Berg River Dam near Franschhoek Berg Supplement Scheme Photos courtesy of Nigel Rossouw, TCTA Environmental Manager. They appeared in the March 2007 BWP progress report. encompassed the key issues on which the consensus to develop the project was founded, and the conditions backed those negotiated outcomes with transpar- ent compliance monitoring. South Africa’s cabinet only endorsed the decision to proceed with the BWP in 2002 after the CCT was able to demonstrate that its demand-side manage- ment strategy and financing commitments were in place. As a consequence, the BWP emerged as the first bulk water supply project in water-stressed South Africa directly linked to water demand management. The full case study looks at the critiques of the project and role of the media in public debate around the projects and different perceptions of water secu- rity. Environmental and civil rights activist movements abroad and in South Africa, organized under the Skuifraam Action Group (SAG), have pointed to the BWP as a bad decision.1 Their opposition rested mainly on two grounds: (1) the potential adverse water quality and environment impacts downstream in the Berg River system, and (2) the view that the 1.6 billion rand cost of the BWP would be better invested in WC/WDM.2 Viewed through a Governance Lens The project-level governance arrangements for the BWP were the first to test the implementation of South Africa’s new water infrastructure strategy, as well as the working of cooperative governance and partnership approaches at all levels. At the institutional level, the BWP featured the first tripartite public- public partnership to implement a water project in the country, which involved Appendix A: Berg Water Project 125 Box A.2. Linking Options Assessment to Communications, Governance, and Sustainability In 2003, the World Bank produced a sourcebook on “Stakeholder Involvement in Options Assessment”a that was organized around four principles: • Principle 1: Create an Enabling Environment for Stakeholder Involve- ment and Options Assessment • Principle 2: Involve All Relevant Stakeholders • Principle 3: Assess All Options Strategically and Comprehensively • Principle 4: Reach a Decision The sourcebook was aimed at World Bank task teams. It provides guidance on how to improve the involvement of stakeholders in the systematic assess- ment of options in planning exercises for water and energy services. Ranging from policy formulation to project planning, it draws on ten case studies of programs and projects that considered the development, rehabilitation, and operation of dams around the world. The sourcebook is also intended for water users and stakeholders involved in dam-related planning processes, and for those involved in policy dialogues focused on improvements in participa- tory planning in the water sector. Options assessment is clearly important from both sustainability and governance improvement perspectives. Communication capacity is central not only to make the argument for effective involvement of stakeholders in options assessment, but also to put it into practice and thereby promote informed and inclusive decision making. The Sourcebook on Stakeholder Involvement in Options Assessment and this Communication Handbook are two documents that project managers can bring to the attention of clients considering dam projects in the early stages of project appraisal, especially when the question of good practice is discussed. a. Energy Sector Management Assistance Program (ESMAP), “Stakeholder Involvement in Options Assessment: Promoting Dialogue in Meeting Water and Energy Needs—A Sourcebook,” World Bank, Washington, DC, July 30, 2003. Cape Town (responsible for water service delivery), the Trans-Caledon Tunnel Authority (TCTA), as project developer and operator, and DWAF as the prime mover (but gradually shifting its role to that of a policy and regulatory body). The project agreements struck were consistent with the philosophy of sustain- ability in the development and management of dams: • The Raw Water Supply Agreement (2003) between DWAF and the CCT and the Implementation Agreement (2003) between DWAF and the TCTA reflected the principle that investments in bulk water supply schemes 126 Opportunities in Dam Planning and Management should be recovered from tariffs, and there were sufficient operating bud- gets for the monitoring and compliance aspects. • Because of the comprehensive way in which risks were addressed, the inter- national scrutiny of these two agreements by an international credit rat- ing service yielded a highly favorable AA+ credit rating for the BWP debt. The TCTA was then able to secure a mix of concessional and commercial financing from the European Investment Bank (EIB), the Development Bank of South Africa (DBSA), and Absa Bank, a major commercial bank, without a direct government guarantee. • Critically, the agreements were written to not encumber the adaptive man- agement of the downstream releases from the dam. A key feature of the Water Supply Agreement was the Berg Water Capital Charge (BWCC), which enabled debt to be repaid by the TCTA over 20 years. This fixed charge was added to the existing tariff the CCT paid to DWAF for raw bulk water supplied by the Western Cape system. It was applied from 2004 on— while the BWP was under construction. For other stakeholders, the EMC brought interested and affected parties into the project governance structure. The committee consisted of an inde- pendent chair and elected representatives of the host community and all water user interests in the basin, as well as local government and project authori- ties. Apart from dealing with environmental concerns, the EMC became the primary platform for dialogue among stakeholders on managing the social components of the project.3 Corporate governance was a factor. The TCTA’s own corporate governance transition from 2002 was relevant to the BWP governance. It demonstrated the importance of backing progressive legislation, with parallel improvements in the corporate governance of the public enterprises responsible for financ- ing, developing, and operating water infrastructure. For example: • The TCTA benchmarked its corporate governance policies against national and international good practice. This was the point of entry for improving the transparency, access to information, and anticorruption procedures in the projects it implemented. • The TCTA developed corporate sustainability reporting and integrated risk assessment procedures as a result of the benchmarking. • The TCTA also took specific steps to reduce its corruption risk exposure by adopting the procurement and anticorruption policies required by the funding agencies (EIB and DBSA), which were developing their own corporate policies on fraud and corruption for adoption by all borrowers and contractors. Appendix A: Berg Water Project 127 • Some of the anticorruption steps taken on the BWP reflected the expe- rience of two of the institutional partners (the TCTA and DWAF) in the Lesotho Highlands Water Project, such as requiring contractors to make declarations of any previous fraud or corruption prosecutions. One indicator of the effectiveness of the combined measures for governance and anticorruption was there was no significant cost increase on the BWP. An important lesson overall on governance was that integrated risk assess- ment and management are needed to underpin a shift to integrated water man- agement and the development of sustainable infrastructure. From a commu- nication standpoint, this lesson calls for empowering interested and affected parties in monitoring the risks relevant to their interests and taking steps to bring stakeholder representation into project governance arrangements. Viewed through a Sustainability Lens Overall, the BWP reveals how the different aspects of sustainability— environmental, social, governance, economic/financial, physical perfor- mance, and institutional—are intertwined. It is not enough to look at each aspect in isolation—for example, environmental sustainability—without considering whether the measures to ensure it are sustainably funded or whether the institutional capacities for monitoring and compliance are present and supported by sufficient resources. • From a social sustainability perspective, the main concerns on the BWP were addressing divergent perceptions of how the project would affect the host communities in the Franschhoek Valley and La Motte Village, the immedi- ate host. These perceptions were central to gaining local acceptance of the project—on one hand, to minimize the possibility of adverse impacts on heritage, tourism, and the local environment, which are a major part of the local economy, and, on the other, to meet expectations among the previously disadvantaged groups in the valley that they would benefit from the project through jobs and other income-generating opportunities during construc- tion and over the longer term. The project itself had no local water supply dimension. Steps for maximizing local benefits emerged in the multistake- holder discussions during both the project preparation and implementation stages. Among those steps accepted by all parties were the following: • Franschhoek First Policy (FFP). This policy was aimed at maximizing train- ing and job creation during the construction phase and local procurement of services to ensure that local contractors were able to take maximum advantage of the business opportunities generated by the BWP. 128 Opportunities in Dam Planning and Management • La Motte Housing Trust. Under this mechanism, 80 houses in La Motte Vil- lage built under FFP terms for occupancy by the BWP contractor’s staff were to be transferred to qualifying local residents after project completion. The proceeds would be used to create a revolving fund for reinvestment in further subsidized housing or in community infrastructure projects to benefit disadvantaged segments of the immediate host community. • Sustainable Utilization Plan. This plan set out longer-term measures for sustainable use of the land surrounding the reservoir and other measures to sustainably integrate the project into the local economy and culture during the operation phase. Despite the many progressive measures introduced for social sustainability, trust broke down in 2004 between the EMC members on the Franschhoek Valley team, one of the seven subgroups on the EMC, and project authorities. In response, many local community representatives resigned from the EMC, and elected local municipality representatives had to assume these EMC roles directly. While there were several reasons for the breakdown in trust, it was clear that a segment of the host community felt they would not directly benefit from the project. Moreover, because of past injustices under the apartheid system, it is likely that some members of the host community were seeking some form of reparations, or recognition of their historical marginalization from economic opportunities, through the project. From the environmental sustainability perspective, the BWP was South Africa’s first large dam and water transfer scheme (in the post-1994 era) to provide both low- and high-flow releases to maintain functional aquatic eco- systems downstream within a prescribed river classification system and satisfy the new statutory “reserve” flow for basic human and ecological needs. The instream flow requirements (IFRs) set for the BWP and the reserve flow determinations for the Berg River (critical stretches) were established in a consultative, transparent process with media coverage.4 Although there was some criticism of the multistakeholder process and its outcome by SAG members, the IFRs were endorsed by a majority of the downstream water user interest in I&AP workshops. These requirements were designed to achieve an agreed water quantity-quantity “status” downstream and encompassed factors such as salinity management, sediment transport, and river morphology. The IFRs were key to the final design of the physical structures and operat- ing strategy. For example, they established the size and final design of multi- level intake and associated outlet works and set a limit on the water transfers from the Berg River system to Cape Town water consumers under both nor- mal hydrology and drought conditions. These measures increased the cost of dam construction by about 25 percent. Although some argue that this cost was unusually high compared with prac- tice in other countries, others argued that the cost was more than justified on Appendix A: Berg Water Project 129 the basis of water resource protection considerations and economic values in the basin. The onetime incremental investment of about $5.7 million in the larger intake and outlet structures protected water quality for downstream uses, including irrigators producing high-value export crops worth over $50 million a year—exports mostly destined for European markets, where water quality is critical to meet EU import standards—as well as many direct and indirect jobs. The BWP thus demonstrates why IFRs should be assessed from a wider water use and economic perspective, engaging with downstream users not just from an ecosystem perspective. Such an assessment is important to making the business case for improvements in sustainability. Other lessons include the need to ensure that the pre-project baseline river monitoring program gets off to a timely start in order to maximize the years of data gathering before construction and impoundment and to pursue an independent audit of environmental and social management processes. The communication associated with these aspects of the project is important. Perhaps the most fundamental lesson was the adoption of an adaptive management philosophy for downstream water releases from the BWP linked to monitoring with I&AP input and scrutiny. The ROD stipulated that if mon- itoring demonstrated the dam was having an unacceptable effect on the river, the release pattern and reserve quantity must be revised. Viewed through a Communication Lens South Africa’s notion of cooperative governance called for active partnerships between the government and the public to equitably expand access to public services and the provision of infrastructure. Adoption of this more open, inclu- sive, and, by definition, “communication-intensive” approach in the planning stage was a major factor in gaining public acceptance of the BWP project. It also enriched the design (i.e., improved its environmental and social perfor- mance) and laid the foundation for partnership approaches to the implemen- tation and operation phases. DWAF and the CCT were responsible for public communication during the project identification and preparation stages—that is, up to 2002. The TCTA was responsible for developing the communication strategy for the BWP implementation and operation stages. The overarching communication strategy was structured around three overlapping steams of communication: (1) project communications—disseminating information on the project and implementation issues to the public and stakeholder interests via newsletters, the media, and various information channels; (2) the public participation process (PPP)—facilitating communications integral to I&AP engagement in ongoing decisions about the design and implementation of the project, largely organized around the EMP and social aspects; and (3) EMC commu- nications—facilitating the functioning of the EMC as a stakeholder-driven 130 Opportunities in Dam Planning and Management cooperative governance mechanism and two-way dialogue between EMC members and their constituencies. The TCTA saw itself as the custodian and facilitator of these three inter- related streams of communication and linked them to its own corporate com- munication strategy, which provided for reporting on risk management and sustainability issues to BWP stakeholders. What follows are some aspects of the communication strategy: • To avoid unnecessary confusion and conflict on implementation issues and otherwise provide consistent messages from government, the TCTA devel- oped a mutually agreed communication protocol. One aim was to ensure that the various government actors who communicated with the media and the public (i.e., those from DWAF, the CCT, DEAT, and other agencies) had up-to-date, accurate information. • Messages were to be clearly set out for each major stakeholder group, and the TCTA was to be responsible for a crisis communication strategy, if required. • The EMC prepared its own communication protocol that set out how EMC members would interact, including how they would handle matters of internal communication, how they would formalize agreements, and how they would communicate with their respective constituencies and report back to the EMC. The protocol gave the EMC chair sole authority to for- mally represent the EMC positions to the media, and members themselves were free to present constituency views. The lessons drawn in the full case study are structured around themes that include the following: • Communication strategies must add value. A communication strategy must fundamentally establish good faith and trust for cooperative governance mechanisms and partnership approaches to work. • Interested and affected parties and the public should receive consistent mes- sages and information. Clear, consistent, reinforcing messages should target the concerns of different I&APs, and they should be issued via the channels preferred by the parties to receive information and have dialogues with part- ners. This is a policy that all must adopt, including multistakeholder bodies. • An overarching sector communication strategy is needed. The project com- munication strategy should complement communication strategies that advance the wider reforms. The BWP story is also interesting to communication practitioners in the sense that it clearly illustrates the practical relevance of the four main branches of modern communication theory and practice in dam projects: development communication, internal communication, corporate communication, and advocacy communication. Appendix A: Berg Water Project 131 Dams as an Integrated Development Intervention By fortuitous coincidence, Cape Town was host to the World Commission on Dams (WCD) while the BWP was in the project preparation stage. Thus many of the government, civil society, and nongovernmental interests involved in the BWP dialogue also participated in the WCD process from 1998 until the closure of the commission in 2001. Among them was the WCD chair, Kader Asmal, who provided political leadership for South Africa’s water governance reforms and the initial decisions on the BWP as minister of water affairs and forestry. As a result, the BWP was closely compared with the WCD not only by envi- ronmental NGOs and civil society organizations (CSOs) opposed to the proj- ect, but also by South Africa’s government agencies and international funding agencies, including the EIB, which became the single largest project lender. At the end of project implementation, a panel of environmental and social experts will compare the BWP implementation process with the WCD guide- lines on dam building. Together with the South African Multi-Stakeholder Initiative on the WCD, these analyses will provide perhaps the best contextualization of WCD recom- mendations to a dam project and country policy framework available today.5 They will reveal the kinds of opportunities and contextual challenges faced in optimizing infrastructure not as a physical asset providing water services, but as a development intervention integrated with the host community’s culture and economy. Conclusion Although every water project has a unique story to offer, the lessons offered by the BWP are relevant to the challenges that many developing countries are facing today in making choices about water infrastructure. These lessons reveal that addressing interconnected social and environmen- tal dimensions, together with economic, financial, and technical dimensions, leads to a more sustainable policy framework and infrastructure strategy. They also show how drought and water scarcity affect the public’s attitudes toward water storage and dams. On the one hand, the CSOs and environmental NGOs opposed to the BWP felt government communications undermined the effec- tiveness of environmental opposition to dams. On the other, the government felt the drought simply highlighted public support for the BWP as an integral part of the Western Cape’s water security strategy. Proponents of the BWP also argued that the government’s delay in the decision to implement the project (from EIA approval in 1999 to cabinet authorization to proceed in 2002) led to demand exceeding supply and the imposition of water restrictions, with subsequent economic losses to various sectors. But there are in fact two storylines about communications on the BWP. One is about how effective communication underpins public endorsement and the 132 Opportunities in Dam Planning and Management political legitimacy of decision making on bulk water supplies and efforts to make infrastructure more sustainable and developmentally effective. The sec- ond is about the role demand management must play in the overall sustain- ability equation, and the need for investment and communication to work on the behavioral changes necessary. Part of the challenge is to move beyond treating I&AP consultation as a “validation” exercise to actually empowering dialogue mechanisms as learning processes, driving innovative thinking, and pursuing partnership approaches. The immediate and tangible outcome of the participatory and partnership approaches to the Berg Water Project was that Cape Town benefited from an 18 percent water supply increment in parallel with a 20 percent reduction in projected water demand. The specific lessons that emerge underline the value that the combination of good governance and genuine I&AP engagement add. The need for effec- tive communication at all levels of decision making and across all stakeholder interests to underpin these accomplishments comes to the forefront. Notes 1. The Berg River Dam was formerly called the Skuifraam Dam. 2. Those opposed to the Skuifraam Dam argued that a dam option was unnecessary, costly, and environmentally damaging. Instead, a package of water recovery and recycling mea- sures could be mobilized to provide new supplies for immediate and future needs. They argued that the demand management measures introduced were conservative and lim- ited in scope, pointing to achievements of smaller water-stressed municipalities in the region (such as Hermanus) that had mounted programs to reduce peak water demands. They also argued that building the Skuifraam Dam would not change the inequities of water use prevalent in the Western Cape, whereas paying for it would impose high water charges on low-income consumers. Meanwhile, the city charged that the critics were not accurately portraying the situation and that demand and supply interventions were needed. 3. Nevertheless, everything was not perfect; there was a steep learning curve. As noted in the full case study, communication and trust among the Franschhoek Valley members of the EMC broke down, and the local municipalities had to assume a more direct repre- sentation role. 4. Some NGOs argue the participation of downstream groups was very weak and that their participation actually undermined the positions of those opposed to the dam. 5. South Africa was a world leader in establishing a multistakeholder national process to assess ways to translate the WCD recommendation into national practices and contexts. See “South African Multi-stakeholder Initiative on the World Commission on Dams,” http://www.unep.org/dams/files/SA_Initiative_Final_Report.pdf. Appendix B Lesotho Highlands Water Project The multipurpose Lesotho Highlands Water Project (LHWP) is designed to transfer water from the water-abundant highlands of Lesotho to the Gauteng region of South Africa (its industrial heartland) and provide hydropower to Lesotho through a series of dams/weirs, delivery tunnels, and associated infra- structure (see box B.1). In addition, for Lesotho one of the primary objectives of the LHWP is to use its export revenues to help alleviate poverty and con- tribute to economic stability. To date, Phase I of the LHWP has been completed, as well as the Phase II feasibility study. The responsibilities for these and two more phases are set out in the treaty on the LHWP, which was signed between the Kingdom of Leso- tho and the Republic of South Africa in 1986. In the area of environmental and social issues, the treaty requires that (1) all those affected by the project “will be able to maintain a standard of living not inferior to that obtaining at the time of first disturbance,” and (2) that implementation, operation, and maintenance of the project should be compatible with protection of the exist- ing quality of the environment and, in particular, should pay due regard to maintaining the welfare of persons and communities affected by the project. To address widespread perceptions that its institutional arrangements were slow and cumbersome, the governance of the LHWP was set out under Protocol VI to the treaty on the LHWP, which was signed by representatives of both governments in Pretoria on June 4, 1999. Protocol VI provided for Appendix B originally appeared in Lawrence J.M. Haas, Leonardo Mazzei, and Donal T. O’Leary, Lesotho Highlands Water Project: Communications Practices for Governance and Sustainability Improvement, World Bank Working Paper No. 200 (Washington, DC: World Bank, 2010). 133 134 Opportunities in Dam Planning and Management Box B.1. Lesotho Highlands Water Project (Phase I): Project Features Phase I of the project was broken down into two subphases: IA and IB. Phase IA, which provides for the delivery of 18 cubic meters of water per second, consisted of (1) the 185-meter-high Katse Dam on the Malibamat’so River; (2) 82 kilometers of delivery tunnels to South Africa; (3) the ’Muela Dam on the Liqoe River; and (4) the 72-megawatt ’Muela Hydropower Station. Con- struction on Phase IA began in 1991, and was commissioned in 1998 at a cost of $2.4 billion. Phase IB, which provided for the delivery of 11.8 cubic meters of water per second, consisted of (1) the Mohale Dam (9.6 cubic meters per second) on the Senqunyane River; (b) the 15-meter Matsoku Weir (2.2 cubic meters per sec- ond) on the Matsoku River and the 6-kilometer delivery tunnel to Katse; and (3) the 32-kilometer delivery tunnel from Mohale to Katse. Final impoundment took place in July 2003 at a cost of $624.3 million. a structure in which the Lesotho Highlands Water Commission (LHWC) is ultimately responsible for the project but with a shift to a more policy formu- lation and monitoring role. The board of the Lesotho Highlands Development Authority (LHDA) assumed a greater executive role, but its members would be appointed on the basis of merit by the LHWC, based on a set of proposals of the government of Lesotho (GOL). Protocol VI also provided for the LHDA to assume responsibility for the operations and maintenance of the LHWP within Lesotho and for the Trans-Caledon Tunnel Authority to have similar responsibilities for the project within South Africa. Subsequently, it was agreed that four members of the LHWC would join the LHDA board (which occurred in 2005), although this arrangement was never formalized. Lessons Learned Because the LHWP is the largest binational water transfer scheme in the world and because it is divided into phases (as noted, Phase I was divided into two very large subphases, Phase IA and Phase IB, and the feasibility studies for Phase II are under way), the lessons learned in this case study are multifaceted. Overall perspective. The formulation and institutional arrangements for the LHWP (particularly for Phase I) have been sufficiently robust to adapt to the major political changes in Lesotho and South Africa. The project is considered ”world class” in terms of the design and implementa- tion of its physical infrastructure, its innovative treatment of environmental flows (EFs), as well as its success in meeting its targets in bulk water supply to South Africa and electricity generation for sale to the Lesotho Electricity Corporation. The LHWP can serve as a model of mutually beneficial development through demonstrating the benefits of bilateral government cooperation in the development of an international river—benefits that exceed those of indi- vidual approaches—as well as in strengthening political cooperation. This Appendix B: Lesotho Highlands Water Project 135 model is particularly relevant because about 40 percent of the world’s popu- lation lives in transboundary river basins, and more than 90 percent of the world’s population lives within the countries that share these basins. Within Africa, 81 rivers are shared by two or more countries, well-managed inter- national projects can provide opportunities for alleviating poverty, including through facilitating economic growth. However, because of its uneven record in addressing its social impacts, partly due to communication defects, the project is still struggling to gain whole- hearted support by the host communities and extend benefit-sharing thinking not only between states but among all the stakeholders, including specifically the local communities that host the project and those affected by the resource transformations it causes. It is vital to understand that development of strong political support for these kinds of projects is predicated on their acceptance as development opportunities in which the host communities feel they are full partners, rather than the more traditional acceptance as simply water resources projects developed to meet specific sectoral needs (such as water supply), with the environmental and social impacts appropriately ameliorated. Governance. In attempts to address corruption issues, government political will is key. In accordance with the South African Development Community (SADC) Protocol Against Corruption, bribery should be criminalized and vigorously pros- ecuted. Anecdotal evidence points to the effectiveness of debarment in changing the culture of corruption, particularly in relation to contracts entered into by over- seas corporations and developing country agencies, including in the water sector. However, the focus should be on prevention rather than prosecution. The SADC Protocol Against Corruption sets out a number of preventative mea- sures and mechanisms. According to Transparency International, good operat- ing practice now requires that infrastructure (including water sector) projects include governance improvement plans (GIPs) based on corruption risk assess- ments at the national, sectoral, and project levels. More support is needed at the project level to develop indicators of corruption. For example, the World Bank has identified the top 10 indicators of project-level fraud and corruption. Emerging good practice also focuses on the central role that the project devel- opers and proponents can play in combating corruption through the adoption of accepted practices of good institutional governance. A good example is the King Commission (II) report, Corporate Governance for South Africa (2002), which articulated a code of good corporate governance that is finding regional acceptance in Botswana (by the Water Utilities Corporation) and South Africa. Emerging good practice in implementing governance and anticorruption (GAC) strategies on dams is to use a coalition approach in their preparation and implementation. These need to involve all the project stakeholders in different and complementary roles. Physical sustainability. To maintain the structural integrity of all its dams, tunnels, and related infrastructure, the LHDA is pursuing a program of activities 136 Opportunities in Dam Planning and Management to be certified under an internationally recognized safety, health, environmental, and quality assurance (SHEQ) risk management program. This plan will enable the LHDA to ensure the optimal transfer/delivery of high-quality water to South Africa and efficient, cost-effective electricity production for Lesotho. Institutional sustainability. To expedite decision making for such a high- profile project, it would have been appropriate to locate the LHDA within the Prime Minister’s Office or under the Council of Ministers rather than having it report to the line ministry. This arrangement could also have enabled the Government of Lesotho to better grasp the development opportunities pre- sented by the project, as well as to improve coordination and management of the transfer of assets once Phase IB of the project was completed. Ongoing oversight is needed to ensure that the LHDA continues to act transparently and accountably in meeting its responsibilities, particularly in relation to the environmental and social aspects of the project. Financial sustainability. These lessons learned are related to the water transfer and hydroelectric components of the LHWP. The financial sustainability of the project’s water transfer component is assured by South Africa’s continued economic growth and the increasing water demand in the Gauteng region. Revenues are paid from a portion of the Vaal River water user tariff. Largely because of government inaction on its bulk tariff (which has been pegged at the 2001 level, making it one of the cheapest in the world), the ’Muela hydropower project (MHP) has been lingering in financial uncertainty for the last eight years. This uncertainty has been costly in terms of efficiency, management capacity, and the ability to run the MHP as a commercial entity, including repaying the loans secured to finance its construction. Environmental sustainability. The Environmental Flows Assessment (EFA) should be conducted in parallel with and as inputs to the Environmental Impact Assessment (EIA) and adequate consultation should be undertaken with other riparians. These activities should happen prior to beginning construction work on dams. Having a policy and legal framework in place to guide the EFA will help to ensure that development-oriented managers will accept the EFA’s results. Sufficient outlet facilities in dams, to accommodate the agreed EFA recom- mendations, should be incorporated in the design stage and in the project cost estimate (important for financial modeling). An agreed policy on instream flow requirements (IFRs) to meet a ”target ecological condition” of a river immediately downstream of a dam will never fully restore a river to its pristine state. Thus, in accord with good practice, this policy should also include compensation for those affected downstream. The final agreed IFR scenario (the “Fourth”) of LHWP’s Phase I was a nego- tiated outcome that balanced the impacts on downstream users and the losses in royalties and hydropower benefits (which were valued as the wholesale tar- Appendix B: Lesotho Highlands Water Project 137 iff of the then-reliable imports from Eskom, the major South African public electricity utility). But the hydropower benefits of the ’Muela project (due to the inability of Eskom to supply reliable power to Lesotho and the major increases in fuel costs) have radically increased. Thus the negotiated outcome may have to be revisited. Social sustainability. In addition to dealing with the project’s social impacts on communities downstream from the dam (see the previous section), social sustainability was primarily related to ensuring that the upstream-affected households and communities were treated by the project in accordance with the terms of the LHWP treaty by means of a comprehensive resettlement and compensation program. The major lessons learned were: • Resettlement housing should be demonstrably superior to the housing lost by those affected, as well as culturally appropriate. • Compensation programs should consist of a blend of actual compensation (e.g., the project agreed to pay the value of agricultural production over 50 years) and development programs (such as in agriculture, tourism, and small business support). • It is important to conduct a baseline and regular follow-up surveys and to identify the appropriate key project indicators (KPIs) in order to be able to demonstrate conclusively whether the relevant provisions of the LHWP treaty were met. Poverty alleviation. Most of the royalties contributed to economic stability and poverty alleviation because they were direct contributions to government revenues. Nearly two-thirds of the projects funded in the 2004–05 develop- ment budget were deemed to be poverty-related. Two unsuccessful attempts were made to establish a Trust Fund directly linked to the project, the second with the support of the World Bank under a Community Development Support Project (CDSP). The Bank’s Project Com- pletion Report for the CDSP was unusually critical of the borrower’s and the Bank’s performance. Given the core importance of addressing poverty and the critical linkages between large infrastructure development and income res- toration/poverty alleviation, successful management of trust funds and simi- lar instruments could be part of a benefit-sharing strategy between the project developers and those affected by the project. Both activities should be closely coordinated throughout the project cycle. Multistakeholder governance for com- munity development funds should be ensured through transparent, accountable processes designed to engage beneficiaries in decisions on the use of funds. Communication. Effective communication at all stages of the project cycle (including identification, preparation, implementation, and operation) is critical to the success of complex hydraulic infrastructure projects involving 138 Opportunities in Dam Planning and Management many stakeholders. Communication, properly embedded in the project, is instrumental toward developing consensus on the need for and type of mea- sures to prevent and detect corruption; toward empowering stakeholders in their oversight roles over decision making across the multiple decision points in the life of a project; and toward promoting a culture of disclosure, transparency and accountability. Key actors often overlooked in any communication strategy are the con- tractors and other private sector actors, particularly in relation to the interac- tions of their employees with the host community. As part of the communica- tion strategy, it is critical to identify the possible risk of negative interactions between the contractors’ staffs and the local community (e.g., increasing the incidence of communicable diseases such as HIV/AIDS and social tensions or conflict due to language barriers or ethnic, cultural, or religious differences) and put in place a program to minimize the risk. Effective, responsive complaint management is a critical ingredient of establishing productive relationships between the project developer/sponsor and the host and downstream communities. Although the ombudsman, as an accepted source of appeal, has a critical role to play, the project sponsor continues to retain responsibility for addressing complaints expeditiously— along with, when relevant, contractors and their staffs. Good practice points to providing sufficient resources for this activity, as well as publicly recording complaints and the time frame for their resolution. Effective communication is a key ingredient of efforts to build support for a sustainable environmental flows policy. Communication is perhaps even more critical in the successful implementation of an EF policy involving an organi- zation’s management, dam operators, and those people affected downstream, particularly when high dam flow releases are a factor. Radio has been demon- strated to be an effective communications medium, particularly for isolated, poorer communities. The LHWP was notable for its progressive learning approach as it moved from the implementation of Phase IA to Phase IB to Phase II. Some examples follow: • Unlike in Phase IA, in which no formal EIA was undertaken, in Phase IB a complete EIA was conducted, except for an EFA, which was undertaken after the decision to go ahead with the project. For the Phase II feasibil- ity study, a complete EIA (including an EFA) is being undertaken, and the downstream riparians (Botswana and Namibia) are regularly informed of its progress through the Orange-Senqu River Commission (ORSECOM) to which all the riparians belong. • Budget allocations for the environmental and social components increased from $67 million in Phase IA (about 5 percent of capital costs) to $115.6 mil- lion in Phase IB (about 15 percent of capital costs). • In Phase IA, resettlement of individual households and communities was allowed only within the Katse basin. In Phase IB, to reduce pressure on Appendix B: Lesotho Highlands Water Project 139 limited land resources, resettlement was permitted within the Mohale basin and in all Lesotho. • The steps contributing to better communication in Phase IB of the LHWP than in Phase IA included: (1) appointing community liaison assistants; (2) setting up Community Area Liaison Committees; (3) handling griev- ances by host and downstream communities, including independent third party adjudication by the Lesotho ombudsman; (4) holding annual stake- holder conferences; (5) opening Public Information Centers at the Katse, Mohale, and ’Muela Dams; (6) setting up a LHWP Web site; and (7) target- ing dissemination of World Bank Aide Memoires. • About 35 percent of the budget for the Phase II feasibility studies was allo- cated to communication and consultation to engage more fully with local communities and the public and genuinely involve people in decisions that affect them. World Bank. The Bank played a vital, long-standing role in facilitating implementation of the LHWP. Its participation began in 1983, when the Bank acted as executing agency for the United Nations Development Programme- financed consultants who supervised the feasibility studies of the LHWP, and continued through various project preparation and supervision stages and then through completion of Phase IB. Although in absolute terms its financial involvement was quite minor (about 5 percent of the Phase I project costs), the Bank financed some of the key strategic components of the project. For example, in Phase IB the Bank financed the engineering design and supervi- sion of the main works; institutional support for the LHDA (including the engineering and environmental and social panels of experts and the Disputes Review Board); and training. The following are some of the lessons learned: • Through its involvement, the Bank provided comfort to other lenders, including the Development Bank of Southern Africa, the EIB, and export credit agencies, which relied on the Bank’s supervision reports to meet their monitoring and evaluation requirements. • In addressing corruption issues related to Phase IA of the LHWP, the Bank played an important role by debarring two consulting companies that were convicted of bribery in the project: Acres International of Canada for three years as of July 2004 and Lahmeyer International of Germany for seven years as of November 2006. However, the debarment process was slow; 11 months intervened between the conclusion of Acres’s appeal of its convic- tion of bribery in Lesotho and its debarment and 32 months for Lahmeyer. In addition the Bank’s own investigation did not find enough evidence to bar the consulting companies; the Bank had to eventually rely on the suc- cessful prosecution by the Lesotho authorities for the necessary action. • The Bank played a successful facilitating role between South Africa and Lesotho in putting in place an IFR policy for the LHWP. It also facilitated an 140 Opportunities in Dam Planning and Management agreement between Lesotho and South Africa, enabling emergency releases from the LHWP in the event that the flow in the border Caledon River fell to levels that cannot support communities dependent on this source of water supply. • Through its regular supervision of the project, the Bank’s dedicated LHWP Task Team ensured that attention was paid continually to sensitive environ- mental and social issues through compliance with its safeguard policies. • However, it seems that political will at the management level was not always as strong as it should have been, particularly in relation to the Community Development Support Project, which had been designed to address the fail- ings of a Trust Fund project and apparently ended up in failure as well. This issue is particularly important in view of the increasing importance of benefit sharing in large dam projects. Glossary The following are definitions of some of the terms used frequently in this handbook that may not be familiar to non-Bank readers. advocacy Targeted and general communication by any organization communication to raise awareness of issues and influence relevant policy making or to win public support for a position. communication- The first stage in the four-stage development communi- based assessment cation process that selects and applies communication (CBA) research methods and techniques appropriate to each project and context to understand the sociopolitical con- text and local dynamics that affect the project objective, design, and stakeholder engagement issues. communication Within the CBA framework, the CNA is a family of tech- needs assessment niques to assess local and institutional communication (CNA) capacities, understand audiences and media and informa- tion environments, and determine information flow pat- terns and the relevant communication networks. communication A well-planned series of actions aimed at achieving spe- strategy cific objectives through the use of communication meth- ods, techniques, and approaches. corporate Communication using media and other methods to communication portray what an organization does: its code of ethics, 141 142 Opportunities in Dam Planning and Management methods of transparency, and trust building with part- ners. These messages are designed to bridge information and knowledge gaps as well as achieve public confidence. development A systematic four-phase process of context exploration, communication context assessment, consensus building among stakehold- ers, and application of communication media and meth- ods for change to enhance development initiatives and project effectiveness. internal Communication within an organization or system to communication keep people informed of issues relevant to the institution and its performance and to ensure the efficient exchange of information among the various units, departments, or staff. interested and “Stakeholders” or “interested and affected parties” refers affected parties to individuals and organizations that have an interest in or are affected by an initiative whose outcome they can influence directly or indirectly. the public The public is not a homogeneous group of people. Rather, “the public is a constantly shifting multiplicity of affilia- tions and alliances that group and regroup according to the issues and their understanding of the issues, percep- tions of risk and the natural evolution of informal struc- tures” (“Generic Public Consultation Guidelines,” issued by the Department of Water Affairs and Forestry, South Africa, 2001). World Bank The framework used by the World Bank to design, pre- project cycle pare, implement, and supervise projects. In practice, the World Bank and the borrowing country work closely throughout the project cycle, although they have different roles and responsibilities. W ater infrastructure projects in developing countries often intersect many aspects of governance reform and democratization. These factors bring new issues and expectations to the table, as well as a wider range of voices and stakeholders whom project managers must accommodate. More communication capacity is needed to support the kind of functional partnership required to deliver sustainable solutions, promote and integrate governance reforms, and cope with growing complexity. Responding to the World Bank Development Committee’s call for infrastructure and communication practitioners to collaborate on improving communication strategies for all stages of infrastructure projects, Opportunities in Dam Planning and Management: A Communication Practitioner’s Handbook for Large Water Infrastructure offers a wealth of practical advice of how to identify good practice improvements in communication for water infrastructure projects. Starting with the World Bank’s own expanding portfolio of dam projects, this book outlines five “how-to” communication-based steps for improving governance and sustainability in dam planning and management: (1) starting the process with a communication-based assessment, (2) benchmarking against good practices, (3) formulating comprehensive communication strategies, (4) improving and adapting communication along the project cycle, and (5) investing in communication for governance and sustainability. Aimed both at practitioners involved in developing country planning processes and dam project managers, this handbook makes a significant contribution to the conversation on modernizing communication in large water infrastructure. ISBN 978-0-8213-8216-5 90000 9 780821 382165 SKU 18216